N32205-16-R-4313_Amendment_0001.docx

DOCX document 63 KB Posted

Attached to
ROH/DD of USNS CARL BRASHEAR
Solicitation number
N32205-16-R-4313
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
N32205-16-R-4313_Amendment_0002.docx DOCX document
RFP_QandA_No._4_BRASHEAR_16-R-4313.docx DOCX document
RFP_QandA_No._5_BRASHEAR_16-R-4313.docx DOCX document
RFP_QandA_No._4_BRASHEAR_16-R-4313.docx DOCX document
RFP_QandA_No._3_BRASHEAR_16-R-4313.docx DOCX document
16-R-4313_Redacted_J A.pdf PDF
RFP_QandA_No._2_BRASHEAR_16-R-4313.docx DOCX document
WI_524_CARL_BRASHEAR_MECH_2016.xls XLS spreadsheet
RFP_QandA_No._1_BRASHEAR_16-R-4313.docx DOCX document
WI_526_CARL_BRASHEAR_MECH_2016.xls XLS spreadsheet
J_-_2_Category_A_Items_Rev._1.xls XLS spreadsheet
N32205-16-R-4313.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J-6_CDRLs.pdf PDF
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-4_WI_GFM_LIST_REV_A.pdf PDF
J_-_12_Past_Performance_Data.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-16-R-4313

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The CLIN extended description has changed from:

Additional Government Requirements (AGR) and Other Direct Costs (ODC)FFPAGR(11,789) man-hours @ $________ per man-hour = $_____________ODCBase $_650,000.00_ Proposed G&A Rate _______________% Subtotal: $_____________Proposed Profit Rate _______________% Subtotal: $_____________FOB: Destination

To:

Additional Government Requirements (AGR) and Other Direct Costs (ODC)FFPAGR(11,981) man-hours @ $________ per man-hour = $_____________ODCBase $_650,000.00_ Proposed G&A Rate _______________% Subtotal: $_____________Proposed Profit Rate _______________% Subtotal: $_____________FOB: Destination.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard Work Items included for this solicitation:

Work Items

SECTION 000 GENERAL REQUIREMENTS

NOT SEPERATELY PRICED (NSP) REQUIREMENTS

001Intent, Scope, General Requirements and Definitions, Rev. Feb 2014NSP
002Technical and Manufacturer’s Representatives, Rev. Feb 2014NSP
003Approach, Berth, and Mooring Requirements, Rev. Oct 2014NSP
004Testing and Quality Assurance, Rev. Feb 2014NSP
005Electrical Safety Procedure Requirements T-AKE, Rev. Feb 2014NSP
006Heavy Weather Plan, Rev. Feb 2014NSP
007Cold Weather Plan, Rev. Feb 2014NSP

CATEGORY “A” WORK ITEMS

010Furnish Office for Overhaul Management Team, Rev. Feb 2014A
011Furnish General Services T-AKE, Rev. Feb 2014A
012Telephone Services, Rev. Feb 2014A
013Project Planning and Production Status Monitoring Reports,
Rev. Feb 2014A
014Preparation of Weight and Moment Report, Rev. Feb 2014A
015Integrated Logistics and GFM Support Requirements, Rev. Feb 2014A
016Fire Protection and Ship’s Safety Program, Rev. Feb 2014A
017Handling Ship’s Stores, Rev. Feb 2014A
018Delivery and Redelivery of the Vessel, Rev. Feb 2014A
019Shipboard Access and Security, Rev. Feb 2014A
020Gas Free Certificates, Rev. Feb 2014A
021Clean and Gas Free Tanks, Voids, Cofferdams and Spaces, Rev. Feb 2014A
022Dock Trials and Sea Trials, Rev. Feb 2014A
023Hazardous Waste Disposal at a Contractor’s Facility, Rev. Feb 2014A

NOT SEPERATELY PRICED (NSP) REQUIREMENTS

024 Physical Security at Private Contractor’s Facility NSP

CATEGORY “B” WORK ITEMS

025Physical Security at Private Contractor’s Facility in Force Protection Conditions Bravo - Delta, Rev. Nov 2013B
030Continuation of Services, Rev. Feb 2014B

SECTION 100 HULL STRUCTURE

CATEGORY “A” WORK ITEMS

101 Ballast Tank Zinc Inspection Rev -A
110 Preservation of LB and RHIB DavitsA
112 Roller Chock Replacement FWD SET (T-ALT 136)A
116 Exterior Ladder Mounting Tab Replacement (VR15-0028)A
117 Steel Renewal and Preservation Frame 62-65 (VR16-0020)A

SECTION 200 PROPULSION MACHINERY

201 Propulsion Motor and Cooler Cleaning, Inspection, and Maintenance Rev -A
202 VULKAN Coupling Annual Inspection Rev -A
203 No. 1 & 3 Main Diesel Engine (MDE) & Turbocharger 24k Hr OverhaulA
205 MDE #1 Splash Oil System Repair and COCOS PC TroubleshootA
206 MDE Splash Oil and Test Circuit Modification (T-ALT 381)A
207 Annual Automation & Propulsion Control Inspection & TestingA
208 Annual Main Diesel Engine (MDE) Control/Safety Inspection & TestingA

SECTION 300 ELECTRICAL

301 HV-SS-Emergency Switchboard Cleaning and Main Diesel Generator, Cleaning, Inspection, and MaintenanceA
302 HV Jumper Cable Replacement (T-ALT 428)A
303 Cargo Hold Light Switch Install (T-ALT 246)A
304 Shipyard Support Work Items HVACA
305 Shipyard Support Work Items ChillersA
306 LED Install M711 Fixtures (T-ALT 353)A
307 UPS, PLC, Thermographic, and Degaussing System SurveyA
308 Shipyard Support for UPS Replacement (T-ALT 434)A

SECTION 400 COMMUNICATIONS AND NAVIGATION

404GMDSS Annual Radio SurveyA
406Bridge and Navigational Equipment AnnualsA
407SRD-500 Doppler Speed Log Replace (T-ALT 431)A
408Voyage Data Recorder RecertificationA
409Replace VHS Recorder in CCTV System with DVR (T-ALT 346)A

SECTION 500 AUXILIARY MACHINERY SYSTEMS

501 Firefighting Inspection and TestingA
502 Relief Valve Testing/Calibration (VR16-0037)A
503 Cargo Crane Repairs and Re-Testing Survey (VR16-0001)A
504 LTFW Cooler Cleaning, Inspection, and Maintenance (VR15-0047)A
506 Sewage Piping System Clean-outA
508 SCBA Annual Inspection and TestingA
509 Vane Axial Fan Motor OverhaulsA
511 Cargo, A/C, and Ship Service Refrigeration 20K Hr Compressor Overhaul/ReplacementA
512 Calibrate and Test Oily Water SeparatorsA
513 Overhaul Hold #1 CLA VALs (VR16-0024)A
514 Procure and Replace Suction Valves (VR16-0006)A
516 Procure and Replace HT Isolation Valves (VR16-0029)A
517 Procure and Replace HTCW Isolation Valves and Fan Coil Inspection (VR16-0030)A
518 Incinerator Groom (VR16-0025)A
519 Bow Thruster Cooling Regulator (T-ALT 227)A
520 VCHT Check Valve Installation (T-ALT 362)A
521 MSD/VCHT Tank and Piping Repairs (VR16-0014)A
522 SW Pump Suction Valves and LTFW Cooler Bypass Repairs (VR 16-0002 -4)A
523 6-34-2 Fuel Oil Tank Sounding Tube Cap Replacement (VR16-0032)A
524 Gauge Calibration (Mechanical)A
525 Open and Inspect Potable Water Heaters (VR15-0055)A

SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY

601 Lifeboat, RHIB, Davits, and Accommodation Ladder Annual InspectionA
602 Liferaft & Hydrostatic Release RecertificationA
603 Main Mast Halyard Relocation (VR 14-0050)A
604 Jettison Ready Service Locker (JSRL) Preservation and Repair (VR16-0022)A
605 Exterior Safety Handrail Replacement (VR15-0063)A
606 RHIB Gel Coat PreservationA
607 Lifeboat Gel Coat PreservationA
608 Shower Deck and Lavatory Deck Renewal (VR16-0019)A
609 Roller Curtain Door Replacement (VR16-0058)A
610 Laundry 04-06 and Incinerator Deck Renewal (VR16-0026 -27)A
611 Galley Equipment CalibrationA
613 Lifeboat Release Mechanism Repairs (VR16-0036)A
614 Pre-Stage Door Repairs (VR16-0013)A

SECTION 800 HEATING, VENTILATION AND AIR CONDITIONING

801Galley Exhaust Duct CleaningA
802Laundry Exhaust Duct CleaningA

SECTION 900 DRYDOCKING AND UNDOCKING

901 Dry-Docking and Undocking VesselA
902 Polish Bow Thruster PropellerA
903 Propeller Shaft and Stern Tube InspectionA
904 Stern Tube Seal InspectionA
905 Underwater Hull Cleaning and PaintingA
907 Zinc Renewal (Sea Chests and Bow Thruster)A
908 Inspect and Repair Cathodic ProtectionA
909 Sea Valve Replacement and Firemain Overboard RepairA
911 Waster Piece RenewalA

CATEGORY “B” WORK ITEMS

912 Dry Docking and Undocking Vessel B

SECTION 1000 UNREP GEAR

1001Renew Flight Deck and Hanger Deck Non-SkidA
1002Sliding Block Chain ReplacementA
1003Sliding Block Transfer Head Refurbishment A
1004Sliding Padeye Station No. 7 A

SECTION F - DELIVERY AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

16-FEB-2017

N/A
N/A

FOB: Destination

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

18-FEB-2017

N/A
N/A

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0005 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0006 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC

POP 05-JAN-2017 TO

N/A
N/A

F-1 SHIP AVAILABILITY PERIOD

It is anticipated that ship will arrive at Contractor’s yard on or about 05 January 2017. All work shall be completed in no more than 45 calendar days from actual start date designated by the Government at time of contract award.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

252.225-7002
Qualifying Country Sources As Subcontractors
AUG 2016
252.225-7012
Preference For Certain Domestic Commodities
AUG 2016

The following have been deleted:

252.225-7001
Buy American And Balance Of Payments Program-- Basic (Nov 2014)
NOV 2014
252.225-7002
Qualifying Country Sources As Subcontractors
DEC 2012
252.225-7012
Preference For Certain Domestic Commodities
FEB 2013

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS

OFFER EXPIRATION

With respect to FAR Clause 52.215-1(d), unless the contractor inserts a shorter period in Block 12, SF 33, by submission of an offer, the contractor agrees that its offer, including any timely revisions thereto, shall remain valid until the Government makes award under this solicitation. The foregoing does not preclude a contractor from withdrawing its offer prior to award.

L – 1 GOVERNMENT FURNISHED INFORMATION – TECHNICAL DATA (GFI-TD)

GFI-TD referenced but no enclosed with this RFP are available via CD upon request. Offerors shall submit their request to the Contracting Officer (KO) and provide their company name, point of contact, address and phone number, and shall indicate if data will be forwarded to subcontractors.

L –2 REQUIREMENTS FOR SUBMISSION OF PROPOSALS

A. Proposal Submittal and Inquiries.

1. Proposals shall be submitted prior to the closing date and time identified on the SF 33, the following address:

Military Sealift Command

Attn: Doug Jones
471 C Street
Naval Station Norfolk, VA 23511-2419

2. Electronic submissions via email or facsimile will not be accepted. Offers shall be mailed through a commercial/Government carrier or hand carried.

3. All questions concerning the solicitation shall be addressed to the contracting specialist identified below via email:

Douglas.jones3@navy.mil

4. See L-5, “Inspection of Vessel/Pre-Proposal Conference,” for instructions to participate in a pre-proposal inspection of the vessel.

B. General Instructions

1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Subpart 15.3. Offers will be evaluated using the criteria under Section M, “Evaluation Factors for Award.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government’s ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.

2. The offer. The submission of the documentation specified below will constitute the offeror’s acceptance of the terms and conditions of the RFP, concurrence with the specifications, and contract type.

3. It is the Government’s intention to award without discussions. Offerors are encouraged to submit their best technical proposal and prices in initial proposals. In accordance with (IAW) FAR 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR 15.306(c)(2). Proposals containing unacceptable ratings may be included in the competitive range provided they can be made acceptable as a result of discussions.

4. Instructions outlined in paragraph C below, prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of information needed to allow for evaluation of proposals.

5. The Work Item (WI) Package is only available upon a written request being made to the contract specialist. All other referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) website at https://www.fbo.gov.

6. Debriefings. The KO will promptly notify offerors of the decision to eliminate their proposals from the competitive range, whereupon an offeror can request and receive a debriefing in accordance with FAR 15.505. The KO will notify unsuccessful offerors in the competitive range of the source selection decision IAW FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Any offeror requesting a debriefing must make the request in accordance with the requirements of FAR 15.506.

C. Proposal Preparation Instructions

1. Offeror’s proposal shall consist of two (2) separate volumes: (Volume I) General; and (Volume II) Technical Proposal.

2. Proposal Format

a. Offerors shall submit an original and the number of copies listed in paragraph “c” below of their proposals.

b. The proposals shall be organized into two (2) separate sealed volumes. Each hard copy volume of the proposal shall be separately bound in a three-ring loose leaf binder. The original copy of each volume shall be marked, “Original;” and any copy shall be marked, “Copy.”

c. In addition to submitting hard copies of the proposals, digital copies shall be provided on CD-ROM disk in Adobe PDF, Microsoft Word, PowerPoint, and/or Excel. Offerors shall ensure that proposal disks are virus free, and free of password protection. The Government reserves the right to eliminate a proposal from consideration if access to proposal data is prohibited due to viruses, passwords, and/or wrong format.

d. The table below shows detailed page limits and number of copies required to be submitted:

Volume
Title
Number of Hard Copies
Number of Digital Copies (CD ROM)
Page Limits
I
General
2
1
N/A
II
Technical Proposal
4
1
50 pages, excluding appendices

The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and remain unread.

The offeror shall submit a technical and a price proposal that shall include, at a minimum:

D. Proposal Content

1. Volume 1 – General. Offerors are required to submit: (TAB A) a completed SF 33 to include acknowledgement of amendments, if applicable; (TAB B) Section B – Supplies or Services and Price and an itemized breakdown of price on the form(s) provided in Attachments J-2 and J-3; (TAB C) Subcontracting Plan ; (TAB D) Section K Representations and Certifications; and (TAB E) Past Performance.

TAB A, SF 33. The SF 33 shall be fully completed upon submission. The offeror shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 33 and FAR Clause 52.215-1(b).

TAB B, Price:

For the price submission, the hard copy version will take precedence for any differences noted between the hard copy and electronic versions of an offeror’s proposal.

Offerors shall submit prices in the format specified on the Contractor Price Breakdown forms of this solicitation, Attachment J-2 and J-3. Each specification Item Number must be either priced or marked “Not Separately Priced (NSP)”.

Overall Price. Unit prices and extended prices must be submitted as indicated, except “Not Separately Priced” items.

Offerors shall include any costs associated with third party access to the contractor’s facility, including costs for badges, safety orientation instruction, and/or parking, in the price proposal under the Shipboard Access and Security Item. For estimating purposes, offerors shall assume that (1) the Government will require access, to include safety orientation instruction and parking at the shipyard facility, for thirty individuals for the entire duration of the performance period; and (2) 20% of the badges issued to the government and third party personnel will be lost/misplaced and will require replacement.

Offerors shall include the Hazardous Waste Handling Fee rate per WI 023 Hazardous Waste Disposal at a Contractor’s Facility; and the unit price per Kilowatt Hour for electrical power, the unit price per gallon potable water, and the unit price per gallon of distilled water per WI 011 on the Section B part of the solicitation.

The contractor agrees that its manhour rate for the 11,981 manhours of the “Additional Government Requirements” includes the complete and full compensation to which it is entitled, including, but not limited to, compensation for all the direct labor costs, (e.g., straight time, overtime, premium time, shift differential, holiday time, standby time, etc.) for performing the Additional Government Requirements, as well as compensation for acceleration, delay and disruption and other impact, if any, to the aforementioned WI, to work performed under any other Government contract and to any work in progress for the Government. The contractor further agrees that it is not entitled to a time extension to the delivery date of any ship under a Government contract by reason or as of a result of the ordering of the 11,981 manhours of “Additional Government Requirements”.

“Additional Government Requirements” does not include work performed pursuant to the clause of this contract entitled “Inspection of and Manner of doing work,” “Guarantees,” or other contract provision relating to the correction of defects.

TAB C, Subcontracting Plan. IAW FAR Clause 52.219-9, 52.219-9 Alt II, and DFARS Clause 252.219-7003, large business offerors shall submit a Small Business Subcontracting Plan with their proposal. Offerors shall ensure that they submit a Small Business Subcontracting Plan with all of the information required.

In preparing the Small Business Subcontracting Plan, offerors should note that historical compliance with FAR Clause 52.219-8, 52.219-9 Alt II, and DFARS Clause 252.219-7003 shall be evaluated as part of Past Performance.

TAB D, Section K (Representation, Certifications, and Other Statements of Offerors). The offeror shall ensure that Section K is submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.

TAB E, Past Performance:

The Past Performance evaluation will be accomplished by reviewing aspects of an offeror’s recent and relevant Past Performance. Offerors may provide information for up to three (3) previous Government contracts whose effort is/was recent and relevant to the effort required by this solicitation.

a. “Recent” is defined as a contract in-progress or completed within the last three (3) years. If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.

b. “Relevant” is defined as a contract that is of similar scope, magnitude, complexity to the requirements as set forth in this solicitation.

i. Scope: Experience in the areas defined in the Statement of Work (SOW).

ii. Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the PWS.

iii. Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the SOW. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).

A Past Performance Data Sheet (Attachment J-12) shall be submitted for each contract to be considered as past performance. Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract; and the role performed, including whether the offeror acted as a prime contractor or a subcontractor. Offerors are responsible for the accuracy of all data provided. Past performance information regarding predecessor companies, key personnel who have relevant experience and subcontractors that will perform major or critical aspects of the requirement may be provided as past performance submissions.

For each of the contracts the offeror describes in a Performance Data Sheet (Attachment J-12), the offeror is requested to provide a Past Performance Questionnaire (Attachment J-13) to a reference at the organization that awarded the contract. The reference, not the offeror, shall email the completed past performance Questionnaire BEFORE THE DUE DATE FOR PROPOSALS directly to Doug Jones, Military Sealift Command Norfolk, Bldg SP-64 471 C Street, Naval Station Norfolk, VA 23511-2419, email to douglas.jones3@navy.mil fax submittals will not be considered. If the contract listed in Attachment J-12 are available in a Government past performance system (i.e. PPIRS, FAPIIS, ESRS) for Government review, Attachment J-13 is not required. The offeror, NOT THE GOVERNMENT, is responsible for ensuring the Government receives a sufficient number of questionnaires or that sufficient information is documented into past performance systems for review.

2. Volume II – Technical Proposal.

The technical proposal will be the basis for assessing the offeror’s ability to understand and perform the tasks in the solicitation. Section M of the solicitation outlines the evaluation factors and defines the source selection evaluation criteria for evaluating the technical proposal. A legible, neat, orderly and comprehensive proposal is required. Data should be presented in Evaluation Factor sequence (1.0-3.0) and paragraph numbering in the proposal submitted should coincide with the numbering system set forth in Section M. Failure to respond to any one of the evaluation factors may result in disqualification of the proposal.

The technical proposal must demonstrate an understanding of and an ability to meet all of the requirements covered in the specification. The proposal should be sufficiently complete to demonstrate how the offeror will comply with government directions and requirements throughout the performance period. Data previously submitted, or presumed to be known, i.e., descriptions of previous projects performed for the government, cannot be considered as a part of the proposal unless physically incorporated in the proposal.

All information must be presented in sufficient depth for the government to make a comprehensive evaluation of the offeror’s understanding of the work package and of the offeror’s capability to successfully perform the work package.

The proposal should demonstrate this understanding and capability in a concise, logical manner and should not contain superfluous material not directly related to the solicitation.

L-3 SPECIFICATION CLARIFICATION

Offerors may use the Request for Specification Clarification, provided in Section J-5, to request clarification of any work item specification or contract term. No verbal requests for information will be accepted by the KO or their technical representative. Offerors’ questions must be submitted to the KO in writing. All requests for specification clarification must be received by MSC Norfolk no later than 15:00 EST hours on 14 September 2016.

L-4 NOTICE TO OFFERORS (FEB 2000)

(a) Sealed proposals will be received by the KO and will be opened at the hour and at the date specified in the solicitation for the performance of the work specified in the solicitation and in accordance with the terms of the Master Agreement for Repair and Alteration of Vessels, as amended through the date of this Solicitation.

(b) Any drawings and specifications referenced in this solicitation are an integral part of the solicitation.

(c) The work shall be completed on or before close of business on the completion date of the period indicated in Section F.

(d) Liquidated damages as specified in Section F shall be payable by the contractor to the Government IAW FAR Clause 52.211-11.

(e) In submitting a solicitation response for Ship Repair, a vendor must cite the above solicitation number and each amendment thereto, if any, and must respond to each certification in this solicitation.

(f) The Government cannot guarantee that an application for a security clearance (if required) can be processed in the time between the closing and the time of award.

L-5 INSPECTION OF VESSEL / PRE-PROPOSAL CONFERENCE -

Inspection for the USNS CARL BRASHEAR will take place on the USNS WALLY SCHIRRA at Pearl Harbor, HI, on or about 02-08 September 2016 at 0900 . Inspection is not mandatory and shall be at the offeror’s expense.

Offerors who plan to inspect the vessel must be registered with MSC Norfolk NLT 25 August 2016.. Participants shall be required to fax the following information on company letterhead prior to the deadline: Name of each individual who will be attending, Social Security Number, Date of Birth, Place of Birth, Citizenship and clearance level (if any) showing the granting agency and date of clearance. Offerors must provide a list of specific attendees only. DO NOT SUBMIT “BLANKET” LISTS. The request should state that the individual will be attending a shipcheck for USNS CARL BRASHEAR. The information must be provided to Doug Jones (757) 443-5882 or via E-mail douglas.jones3@navy.mil. Personnel who fail to pre-register will, at best, experience protracted delays in accessing the vessel. A second inspection will NOT be scheduled.

L-6 SHIP & BASE ACCESS (APR 2013)

Offerors are responsible for correctly submitting forms/applications. Offerors are encouraged to monitor email using “Request a Read Receipt” function and to confirm receipt of facsimile transmissions.

Due to enhanced security measures, ship and base access is required for pre-award ship visits (e.g., ship-check) and for contract performance. Specifically the following permissions are required:

1. El Paso Intelligence Center (EPIC) personnel screening requirement

2. Base/Repair Facility Access Request

3. Vehicle Access Request

4. Ship Access List (vendor-provided)

All forms are available for download on the MSC contracts webpage at http://www.msc.navy.mil. Click on “Contracts” in the upper right corner. Click on “Online Library of Common Documents” for all forms.

EPIC: Required for access to MSC vessels. Complete EPIC form strictly adhering to format requirements. For CONUS East and Gulf Coast repairs, forward request to msc.norfolk.epic@navy.mil and for CONUS West Coast and HI repairs, forward to MSC.SSUSD.EPIC@navy.mil EPIC personnel screening requests are desired seven calendar days prior to performance start date. Requests will be managed as expeditiously as circumstances permit. Vendor will be notified by MSC of personnel who are denied access to the vessel.

Base/Repair Facility Access: Permit is required to access Navy facilities. Base/Repair Facility Access Request is desired seven days prior to ship check or performance start date. Submit forms per the document instruction and to the Port Engineer. A courtesy copy (CONUS West Coast performance locations only) to Sam Reynolds, Engineering Director, at sam.reynolds@navy.mil will be appreciated.

RAPIDGate® is being implemented for access to DoD facilities in CONUS, HI, Guam and Puerto Rico. Vendor is responsible to acquire RAPIDGate® status and destination base individual access badge(s) activation prior to performance start date. Delays that may result from inadequate planning are contractor responsibility. Vendor instructions and program information is available at http://www.RAPIDGate.com or tel. 877.727.4342. RAPIDGate® access requires (in succession) (1) Individual Base Commander approval for vendor to access base, (2) Successful vendor RAPIDGate® company annual enrollment, (3) Company employee individual enrollment and possession of RAPIDGate® identification badge for single base or multiple base (enterprise) access. Vendor is responsible to confirm that each employee held annual RAPIDGate® badge is active for the specific facility and performance period in accordance with RAPIDGate® User Agreement (http://www.RAPIDGate.com).

Enclave Access request may be selected on the “Naval Base Point Loma (NBPL) Access Request Form.”

Vehicle Access: Required for vehicle access to Navy facilities. Follow supplemental instructions on Base Access forms or base-specific vehicle access forms.

Ship Access List (Vendor-Provided): On company letterhead attachment via email, the vendor is required to provide the ship master (courtesy copy the Port Engineer) with an accurate, current list of performing personnel prior to being admitted aboard the vessel. Under no circumstances will a hand-delivered list be accepted.

T-AKE email address: MASTER@AKE#.NAVY.MIL (example: master@ake8.navy.mil, where “8” is the hull number).

All other hulls address: MASTER.SHIPNAME@MSC.NAVY.MIL (example: master.sioux@msc.navy.mil).

(End of Text)

L-7 CONTRACTOR ACCESS TO MSC SHIPS

1. El Paso Intelligence Center (EPIC) clearance is required to gain gangway access to all USNS vessels. EPIC clearance is separate from base access.

2. If required for a ship check, or upon receipt of a contract award, the contractor must request an EPIC form from James Phillips via email at: james.b.phillips2@navy.mil. The completed form shall be returned via email.

3. When the EPIC clearance is received, MSC Norfolk Command Security will promulgate a letter for base access for cleared personnel and forward it to base security.

4. EPIC requests typically require five business days for clearance.

L-8 SUBCONTRACTING PLANS

In preparing the Small Business Subcontracting Plan, offerors should note that historical compliance with FAR 52.219-8 and FAR 52.219-9 shall be evaluated as part of Past Performance.

A subcontracting plan is NOT REQUIRED from small business concerns and will not be evaluated.

Addendum to 52.233-2 SERVICE OF PROTEST

Interested parties may request an independent review of their protest as an alternative to consideration by the contracting officer or as an appeal of the contracting officer's decision on their protest. See FAR 33.103. Requests for independent review shall be addressed to Code N10 or N10X, Military Sealift Command, SP 64, 471 East C Street, Norfolk, VA 23511-4419. MSC encourages potential protesters to discuss their concerns with the contracting officer prior to filing a protest.

The following have been deleted:

OFFER EXPIRATION

SECTION M - EVALUATION FACTORS FOR AWARD

M - 2 BASIS FOR AWARD

a. The Government will evaluate offers on a Low Price, Technically Acceptable (LPTA) basis IAW FAR 15.101-2. The technical factor and past performance factor will be evaluated on an acceptable/unacceptable basis. Technical tradeoffs will not be made and no additional credit will be given for exceeding the minimum requirements of the solicitation. Award will be made to the lowest evaluated price proposal whose offer conforms fully to the solicitation requirements and meets the acceptability standards for all non-price factors and subfactors. In order to be eligible for award, an offer must receive an acceptable rating in every non-price factor and subfactor. An unacceptable rating in any non-price factor or subfactor will render the entire offer unacceptable. For large businesses, the Government will evaluate the Small Business Subcontracting Plan IAW FAR Clause 52.219-9 with its Alternate II. Failure by a large business to submit and negotiate a subcontracting plan acceptable to the Contracting Officer (KO) will render its offer ineligible for award of a contract.

b. The Government intends to award without discussions. Pursuant to FAR Clause 52.215-1(f) (4), however, the Government reserves the right to conduct discussions if the KO later determines them to be necessary. In the event that discussions are held, a competitive range determination will be made.

c. In selecting the lowest-priced offeror with an acceptable rating for all non-price factors , the following factors and subfactors will be considered:

Technical Factors Factor 1 – Understanding the Statement of Work (SOW)

Subfactor 1.1 – Time Phased Sequencing Network (TPSN)
Subfactor 1.2 – Problem Areas
Subfactor 1.3 – Engineering
Subfactor 1.4 – Material Availability
Subfactor 1.5 – Material Control and Storage
Subfactor 1.6 – Heavy Weather Plans
Subfactor 1.7 – Cold Weather Plans

Factor 2 – Ability to Perform the Statement of Work

Subfactor 2.1 – Man-hour Chart
Subfactor 2.2 – Growth Absorption
Subfactor 2.3 – Facilities

Factor 3 – Management Control and Quality Assurance

Subfactor 3.1 – Organization and Key Personnel
Subfactor 3.2 – Subcontractor Participation
Subfactor 3.3 – Quality Control Plan
Subfactor 3.4 – Overtime Usage
Subfactor 3.5 – Hazardous Waste Management Plan

Past Performance Factors Factor 1 – Quality of product or service Factor 2 – Timeliness or scheduling of service/deliveries Factor 3 – Business relations/customer satisfaction Factor 4 – Key personnel and staffing (including subcontractors) Factor 5 – Cost Controls (Cost Contracts Only)

Price Factor

d. NOTE: Offerors are cautioned that any offer receiving a rating of unacceptable for any technical subfactor may be rated unacceptable overall for the technical factor. Any offer rated unacceptable for the technical factor or past performance factor will be ineligible for award.

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .