Amendment_0003.pdf

PDF 39 KB Posted

Attached to
USNS PATUXENT (T-AO 201) MID-TERM AVAILABILITY
Solicitation number
N32205-16-R-4003
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
J A_Patuxent_P00003_Aug_2016_Redacted.pdf PDF
J-3_CAT_B_Amendment_0004.xlsx XLSX spreadsheet
Amendment_0004.pdf PDF
J-3_CAT_B_Amendment_0003.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
0005.docx DOCX document
0006.docx DOCX document
0004.docx DOCX document
Amd_0001.pdf PDF
0003.doc DOC document
0002.docx DOCX document
0001.docx DOCX document
J-8_Request_for_Spec_Clarification.doc DOC document
J-2_CAT_A.xlsx XLSX spreadsheet
Solicitation_N32205-16-R-4003.doc DOC document
J-7_MSC_Ship_Repair_Facility_Survey.doc DOC document
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J-14_NON_DISCLOSRE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1_1_2-27-14).docx DOCX document
J-6_CDRLs.PDF PDF
J-4_Scheduled_Government_Furnished_Property.xls XLS spreadsheet
J-3_CAT_B.xlsx XLSX spreadsheet
J-12_Past_Performance_Data.docx DOCX document
J-10_Interport_Differential.doc DOC document
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
PATUXENT_Avail_JA_Redacted.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Allow for submission of Final Proposal Revisions to be submitted no later than 3 May 2016 at 1:00 PM local time. Final proposal revisions may be submitted electronically via email to the Contract Specialist, Mark Draluck at the email address of mark.draluck@navy.mil by the deadline stated above. How ever, hard copy proposals must be received by 5 May 2016 at 2:00 PM local time. See, "Requirements for Submission of Final Proposal Revisions" for further submission instructions. If a final proposal revision is not received by these deadlines, then the Government w ill only consider the initial proposal for aw ard consideration.

2) Revise WI 115 on the J-3 Attachment

3) All other terms and conditions of the original solicitation and amendments issued to date remain unchanged and in full force and affect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Apr-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32205-16-R-4003

X 9B. DATED (SEE ITEM 11)

01-Mar-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Apr-2016

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET, BLDG SP-64 NAVAL STATI

NORFOLK VA 23511

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N32205-16-R-4003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS

The following have been added by full text:

FPR SUBMISSION

REQUIREMENTS FOR SUBMISSION OF FINAL PROPOSAL REVISIONS

The offeror may submit a final revised technical and price proposal in response to the request for final proposal revision submission. In the event that the offeror does not submit a final proposal revisions in part or entirety, the initial proposal will be considered for award in its entirety or those applicable parts not resubmitted. Therefore, an initial acceptable or unacceptable rating and/or evaluated price will be carried over for that factor. The final proposal revisions shall be submitted in the following format:

(a) General: Both hard copy (hard copy as defined in L-2 paragraph (a) including electronic CD-ROM) and electronic files via email must be submitted with your final proposal revisions. These submissions shall be divided into two (2) binders/CDs/emails as follows: (1) Price/Past Performance and all outstanding Amendments, signed and completed, and (2) Technical. Hard copy submissions may be submitted at a later date so long as emailed submissions are received prior to the submission deadline. One (1) hard copy and one (1) electronic CD-ROM copy is required.

(b) Offerors shall submit their final proposal revisions to the following address:

Mark.draluck@navy.mil for email submission

For hard copy submission:

Military Sealift Command Attn: Mark Draluck (N104A1) 471 C Street Naval Station Norfolk, VA 23511-2419

Volume I: Price / Past Performance (as applicable for the final proposal revision submission)

Price In submission of final proposal revisions, offerors shall follow the price submission guidance from L-2, “Requirements for Submission of Proposals”

The revisions to the price proposal must be accompanied by a complete cost breakdown setting forth the revisions and the basis thereof.

Past Performance Offerors shall provide a written narrative addressing concerns provided during discussions, if any.

Other Business Issues Offerors shall provide a written narrative addressing concerns provided during discussions, if any.

Volume II: Technical Proposal

N32205-16-R-4003

Final proposal revisions shall address concerns stated during discussions, if any. Failure to adequately address concerns in accordance with the discussions conducted and evaluation notices issued may be grounds for an Unacceptable factor rating in accordance with M-3.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .