0002.docx

DOCX document 26 KB Posted

Attached to
USNS PATUXENT (T-AO 201) MID-TERM AVAILABILITY
Solicitation number
N32205-16-R-4003
Issued by

About this file

RFC Response 0002

View the file

Other files

File Type Posted
J A_Patuxent_P00003_Aug_2016_Redacted.pdf PDF
J-3_CAT_B_Amendment_0004.xlsx XLSX spreadsheet
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
J-3_CAT_B_Amendment_0003.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
0005.docx DOCX document
0006.docx DOCX document
0004.docx DOCX document
Amd_0001.pdf PDF
0003.doc DOC document
0001.docx DOCX document
J-8_Request_for_Spec_Clarification.doc DOC document
J-2_CAT_A.xlsx XLSX spreadsheet
Solicitation_N32205-16-R-4003.doc DOC document
J-7_MSC_Ship_Repair_Facility_Survey.doc DOC document
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J-14_NON_DISCLOSRE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1_1_2-27-14).docx DOCX document
J-6_CDRLs.PDF PDF
J-4_Scheduled_Government_Furnished_Property.xls XLS spreadsheet
J-3_CAT_B.xlsx XLSX spreadsheet
J-12_Past_Performance_Data.docx DOCX document
J-10_Interport_Differential.doc DOC document
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
PATUXENT_Avail_JA_Redacted.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-16-R-4003

USNS PATUXENT (T-AO 201)

RFC 0002

REQUEST FOR SPECIFICATION CLARIFICATION

NAME OF CONTRACTOR: ___

SPECIFICATION ITEM NO.: __302___________________

PARAGRAPH / SECTION NO:__3.3.1, 7.1.23__________________

TITLE: _Air Circuit Breaker Annual Maintenance______________

QUESTION:

In item 0302 paragraph 3.3.1 calls for three breakers to be provided (1 at 800 amps, 1 at 1600 amps and 1 at 2000 amps), but in paragraph 7.1.23 the item calls for four breakers to be provided (the three listed in para 3.3.1 plus 1 at 4000 amp). Please clarify how many breakers are to be provided.

ANSWER:

Paragraph 3.3.1 is correct; only three breakers are to be provided. Paragraph 7.1.23.1 numbering was incorrect, what should have been 7.1.23.5 is to be deleted.

Paragraph 7.1.23 should read as follows;

7.1.23In additional to the work above contractor shall accomplish and provide the following;
7.1.23.1The contacts on the three (3) 800 AMP circuit breakers in the EDG room needs to be taken out, cleaned, sand blasted, re-plated, re-assembled and re-install.
7.1.23.2One (1) 800 AMP SPB 100 for 120 Volts Lighting, Forward Emergency Lighting and Forward Load Centre L-C7
7.1.23.3One (1) 1600 AMP frame SPB 150 with 800 AMP Sensors for 120 Volts Lighting and Forward Lighting.
7.1.23.4One (1) 2000 AMP frame SPB 150 with 2000 AMP Sensors for Vitals A&C.
7.1.23.5One (1) 4000 AMP frame SPB 150 with 4000 AMP sensors for PTO & SSDG.