N32205-15-R-6002_6-29-15.doc
DOC document 1 MB Posted
- Solicitation number
- N32205-15-R-6002
About this file
Solicitation IDIQ Gauge Meter and Thermometer Calibration Repair and Replacement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Change_Pages.pdf | ||
| RFP_Q_AND_A_N32205-15-R-6002.docx | DOCX document | |
| PERFORMANCE_QUESTIONNAIRE_(V1.1 _7-23-13).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
GENERAL REQUIREMENTS -NSP FFP.
FFP
GENERAL REQUIREMENTS -NSP FFP. GENERAL REQUIREMENTS: CLIN IS NOT TO BE SEPARATELY PRICED. CONTRACTOR SHALL FURNISH LABOR, MATERIAL AND EQUIPMENT NECESSARY, MAKE ALL REMOVALS AND REPLACEMENT OF INTERFERENCES AND INSTRUMENTATION RIG AND UNRIG, STAGE AND UNSTAGE AS REQUIRED IN ORDER TO PERFORM EACH TASK ABOARD MSC SHIPS. FOB: Destination
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
CLASS I CALIBRATE/RECALIBRATE
CLASS I CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS I CALIBRATE GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
CLASS II CALIBRATE/RECALIBRATE
CLASS II CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
CLASS III CALIBRATE/RECALIBRATE
CLASS III CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE FACE, EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
SHAFT RPM INDICATING SYSTEMS
SHAFT RPM INDICATING SYSTEMS FFP CALIBRATE/RECALIBRATE AND ADJUST SHAFT RPM INDICATING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
PROPELLER PITCH INDICATORS
PROPELLER PITCH INDICATORS FFP CALIBRATE/RECALIBRATE AND ADJUST PROPELLER PITCH INDICATORS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
RESERVED
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
DEGAUSSING SYSTEMS
DEGAUSSING SYSTEMS FFP CALIBRATE/RECALIBRATE DEGAUSSING SYSTEMS AND ADJUST DEGAUSSING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
GAS ANALYZERS
GAS ANALYZERS FFP CALIBRATE/RECALIBRATE AND ADJUST GAS DETECTORS FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
O2N2 PLANT DISTRIBUTION SYSTEM
O2N2 PLANT DISTRIBUTION SYSTEM GAUGES
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Hours |
TEST EQUIPMENT HOURLY RATE
TEST EQUIPMENT HOURLY RATE CALIBRATE/RECALIBRATE AND ADJUST TEST EQUIPMENT FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
CLASS I REPLACE FFP
CLASS I REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS I GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
CLASS II REPLACE
CLASS II REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
CLASS III REPLACE
CLASS III REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE, ALL EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
LABOR STRAIGHT TIME
LABOR STRAIGHT TIME (S/T) FFP STRAIGHT TIMELABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
LABOR OVERTIME (O/T)
LABOR OVERTIME (O/T) FFP OVERTIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
LABOR PREMIUM TIME (P/T)
LABOR PREMIUM TIME (P/T) FFP PREMIUM TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
LABOR TRAVEL TIME (T/T)
LABOR TRAVEL TIME (T/T) FFP TRAVEL TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
MATERIAL FFP MATERIAL EXPENSES
MATERIAL FFP MATERIAL EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
TRAVEL EXPENSES FFP TRAVEL
TRAVEL EXPENSES FFP TRAVEL, PER DIEM, AIR FARE, AND GROUND TRANSPORTATION EXPENSES NOT INCLUDED IN CLINS 0001 THROUGH 0014 (SEE JOINT TRAVEL REGULATIONS) OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| GENERAL REQUIREMENTS -NSP FFP. |
FFP
GENERAL REQUIREMENTS -NSP FFP. GENERAL REQUIREMENTS: CLIN IS NOT TO BE SEPARATELY PRICED. CONTRACTOR SHALL FURNISH LABOR, MATERIAL AND EQUIPMENT NECESSARY, MAKE ALL REMOVALS AND REPLACEMENT OF INTERFERENCES AND INSTRUMENTATION RIG AND UNRIG, STAGE AND UNSTAGE AS REQUIRED IN ORDER TO PERFORM EACH TASK ABOARD MSC SHIPS. FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS I CALIBRATE/RECALIBRATE |
FFP
CLASS I CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS I CALIBRATE GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II CALIBRATE/RECALIBRATE |
FFP
CLASS II CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III CALIBRATE/RECALIBRATE |
FFP
CLASS III CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE FACE, EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| SHAFT RPM INDICATING SYSTEMS |
FFP
SHAFT RPM INDICATING SYSTEMS FFP CALIBRATE/RECALIBRATE AND ADJUST SHAFT RPM INDICATING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| PROPELLER PITCH INDICATORS |
FFP
PROPELLER PITCH INDICATORS FFP CALIBRATE/RECALIBRATE AND ADJUST PROPELLER PITCH INDICATORS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| RESERVED |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| DEGAUSSING SYSTEMS |
FFP
DEGAUSSING SYSTEMS FFP CALIBRATE/RECALIBRATE DEGAUSSING SYSTEMS AND ADJUST DEGAUSSING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| GAS ANALYZERS |
FFP
GAS ANALYZERS FFP CALIBRATE/RECALIBRATE AND ADJUST GAS DETECTORS FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| O2N2 PLANT DISTRIBUTION SYSTEM |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Hours |
| OPTION |
| TEST EQUIPMENT HOURLY RATE |
FFP
TEST EQUIPMENT HOURLY RATE CALIBRATE/RECALIBRATE AND ADJUST TEST EQUIPMENT FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS I REPLACE FFP |
FFP
CLASS I REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS I GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II REPLACE |
FFP
CLASS II REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III REPLACE |
FFP
CLASS III REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE, ALL EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR STRAIGHT TIME |
FFP
LABOR STRAIGHT TIME (S/T) FFP STRAIGHT TIMELABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR OVERTIME (O/T) |
FFP
LABOR OVERTIME (O/T) FFP OVERTIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR PREMIUM TIME (P/T) |
FFP
LABOR PREMIUM TIME (P/T) FFP PREMIUM TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR TRAVEL TIME (T/T) |
FFP
LABOR TRAVEL TIME (T/T) FFP TRAVEL TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| MATERIAL FFP MATERIAL EXPENSES |
FFP
MATERIAL FFP MATERIAL EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TRAVEL EXPENSES FFP TRAVEL |
FFP
TRAVEL EXPENSES FFP TRAVEL, PER DIEM, AIR FARE, AND GROUND TRANSPORTATION EXPENSES NOT INCLUDED IN CLINS 0001 THROUGH 0014 (SEE JOINT TRAVEL REGULATIONS) OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| GENERAL REQUIREMENTS -NSP FFP. |
FFP
GENERAL REQUIREMENTS -NSP FFP. GENERAL REQUIREMENTS: CLIN IS NOT TO BE SEPARATELY PRICED. CONTRACTOR SHALL FURNISH LABOR, MATERIAL AND EQUIPMENT NECESSARY, MAKE ALL REMOVALS AND REPLACEMENT OF INTERFERENCES AND INSTRUMENTATION RIG AND UNRIG, STAGE AND UNSTAGE AS REQUIRED IN ORDER TO PERFORM EACH TASK ABOARD MSC SHIPS. FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS I CALIBRATE/RECALIBRATE |
FFP
CLASS I CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS I CALIBRATE GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II CALIBRATE/RECALIBRATE |
FFP
CLASS II CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III CALIBRATE/RECALIBRATE |
FFP
CLASS III CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE FACE, EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| SHAFT RPM INDICATING SYSTEMS |
FFP
SHAFT RPM INDICATING SYSTEMS FFP CALIBRATE/RECALIBRATE AND ADJUST SHAFT RPM INDICATING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| PROPELLER PITCH INDICATORS |
FFP
PROPELLER PITCH INDICATORS FFP CALIBRATE/RECALIBRATE AND ADJUST PROPELLER PITCH INDICATORS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| RESERVED |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| DEGAUSSING SYSTEMS |
FFP
DEGAUSSING SYSTEMS FFP CALIBRATE/RECALIBRATE DEGAUSSING SYSTEMS AND ADJUST DEGAUSSING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| GAS ANALYZERS |
FFP
GAS ANALYZERS FFP CALIBRATE/RECALIBRATE AND ADJUST GAS DETECTORS FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| O2N2 PLANT DISTRIBUTION SYSTEM |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Hours |
| OPTION |
| TEST EQUIPMENT HOURLY RATE |
FFP
TEST EQUIPMENT HOURLY RATE CALIBRATE/RECALIBRATE AND ADJUST TEST EQUIPMENT FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS I REPLACE FFP |
FFP
CLASS I REPLACE FFP - REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS I GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II REPLACE |
FFP
CLASS II REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III REPLACE |
FFP
CLASS III REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE, ALL EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR STRAIGHT TIME |
FFP
LABOR STRAIGHT TIME (S/T) FFP STRAIGHT TIMELABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR OVERTIME (O/T) |
FFP
LABOR OVERTIME (O/T) FFP OVERTIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR PREMIUM TIME (P/T) |
FFP
LABOR PREMIUM TIME (P/T) FFP PREMIUM TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR TRAVEL TIME (T/T) |
FFP
LABOR TRAVEL TIME (T/T) FFP TRAVEL TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| MATERIAL FFP MATERIAL EXPENSES |
FFP
MATERIAL FFP MATERIAL EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TRAVEL EXPENSES FFP TRAVEL |
FFP
TRAVEL EXPENSES FFP TRAVEL, PER DIEM, AIR FARE, AND GROUND TRANSPORTATION EXPENSES NOT INCLUDED IN CLINS 0001 THROUGH 0014 (SEE JOINT TRAVEL REGULATIONS) OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| GENERAL REQUIREMENTS -NSP FFP. |
FFP
GENERAL REQUIREMENTS -NSP FFP. GENERAL REQUIREMENTS: CLIN IS NOT TO BE SEPARATELY PRICED. CONTRACTOR SHALL FURNISH LABOR, MATERIAL AND EQUIPMENT NECESSARY, MAKE ALL REMOVALS AND REPLACEMENT OF INTERFERENCES AND INSTRUMENTATION RIG AND UNRIG, STAGE AND UNSTAGE AS REQUIRED IN ORDER TO PERFORM EACH TASK ABOARD MSC SHIPS. FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CALIBRATE/RECALIBRATE GAUGES |
FFP
CLASS I CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS I CALIBRATE GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II CALIBRATE/RECALIBRATE |
FFP
CLASS II CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III CALIBRATE/RECALIBRATE |
FFP
CLASS III CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE FACE, EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| SHAFT RPM INDICATING SYSTEMS |
FFP
SHAFT RPM INDICATING SYSTEMS FFP CALIBRATE/RECALIBRATE AND ADJUST SHAFT RPM INDICATING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| PROPELLER PITCH INDICATORS |
FFP
PROPELLER PITCH INDICATORS FFP CALIBRATE/RECALIBRATE AND ADJUST PROPELLER PITCH INDICATORS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| RESERVED |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| DEGAUSSING SYSTEMS |
FFP
DEGAUSSING SYSTEMS FFP CALIBRATE/RECALIBRATE DEGAUSSING SYSTEMS AND ADJUST DEGAUSSING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| GAS ANALYZERS |
FFP
GAS ANALYZERS FFP CALIBRATE/RECALIBRATE AND ADJUST GAS DETECTORS FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| O2N2 PLANT DISTRIBUTION SYSTEM |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Hours |
| OPTION |
| TEST EQUIPMENT HOURLY RATE |
FFP
TEST EQUIPMENT HOURLY RATE CALIBRATE/RECALIBRATE AND ADJUST TEST EQUIPMENT FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS I REPLACE FFP U.S. |
FFP
CLASS I REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS I GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II REPLACE |
FFP
CLASS II REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III REPLACE |
FFP
CLASS III REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE, ALL EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR STRAIGHT TIME |
FFP
LABOR STRAIGHT TIME (S/T) FFP STRAIGHT TIMELABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR OVERTIME (O/T) |
FFP
LABOR OVERTIME (O/T) FFP OVERTIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR PREMIUM TIME (P/T) |
FFP
LABOR PREMIUM TIME (P/T) FFP PREMIUM TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR TRAVEL TIME |
FFP
LABOR TRAVEL TIME (T/T) FFP TRAVEL TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| MATERIAL FFP MATERIAL EXPENSES |
FFP
MATERIAL FFP MATERIAL EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TRAVEL EXPENSES FFP TRAVEL |
FFP
TRAVEL EXPENSES FFP TRAVEL, PER DIEM, AIR FARE, AND GROUND TRANSPORTATION EXPENSES NOT INCLUDED IN CLINS 0001 THROUGH 0014 (SEE JOINT TRAVEL REGULATIONS) OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
GENERAL REQUIREMENTS -NSP FFP.
GENERAL REQUIREMENTS -NSP FFP. GENERAL REQUIREMENTS: CLIN IS NOT TO BE SEPARATELY PRICED. CONTRACTOR SHALL FURNISH LABOR, MATERIAL AND EQUIPMENT NECESSARY, MAKE ALL REMOVALS AND REPLACEMENT OF INTERFERENCES AND INSTRUMENTATION RIG AND UNRIG, STAGE AND UNSTAGE AS REQUIRED IN ORDER TO PERFORM EACH TASK ABOARD MSC SHIPS. FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CALIBRATE/RECALIBRATE |
FFP
CLASS I CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS I CALIBRATE GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II CALIBRATE/RECALIBRATE |
FFP
CLASS II CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III CALIBRATE/RECALIBRATE |
FFP
CLASS III CALIBRATE/RECALIBRATE FFP CALIBRATE/RECALIBRATE GAUGES, METERS AND THERMOMETERS. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE FACE, EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| SHAFT RPM INDICATING SYSTEMS |
FFP
SHAFT RPM INDICATING SYSTEMS FFP CALIBRATE/RECALIBRATE AND ADJUST SHAFT RPM INDICATING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| PROPELLER PITCH INDICATORS |
FFP
PROPELLER PITCH INDICATORS FFP CALIBRATE/RECALIBRATE AND ADJUST PROPELLER PITCH INDICATORS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| RESERVED |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| DEGAUSSING SYSTEMS |
FFP
DEGAUSSING SYSTEMS FFP CALIBRATE/RECALIBRATE DEGAUSSING SYSTEMS AND ADJUST DEGAUSSING SYSTEMS AS A COMPLETE SYSTEM FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| GAS ANALYZERS |
FFP
GAS ANALYZERS FFP CALIBRATE/RECALIBRATE AND ADJUST GAS DETECTORS FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| O2N2 PLANT DISTRIBUTION SYSTEM |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Hours |
| OPTION |
| TEST EQUIPMENT HOURLY RATE |
FFP
TEST EQUIPMENT HOURLY RATE CALIBRATE/RECALIBRATE AND ADJUST TEST EQUIPMENT FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS I REPLACE FFP |
FFP
CLASS I REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS I GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PRESSURE THERMOMETER: 31/2", 4 1/2" DIAL LOCAL FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS II REPLACE |
FFP
LOT 1 - CLASS II REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS II GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL PSID X COMPOUND FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CLASS III |
FFP
CLASS III REPLACE FFP REPLACE GAUGES, METERS AND THERMOMETERS WITH CALIBRATED NEW. CLASS III GAUGE SIZE: 2 1/2", 3 1/2", 4 1/2" DIAL DUPLEX DIAPHRAM SEAL & INCHES OF WATER THERMOMETERS, DIAL REMOTE READING METERS: SWD TYPE, ALL EDGEWISE FACE FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR STRAIGHT TIME |
FFP
LABOR STRAIGHT TIME (S/T) FFP STRAIGHT TIMELABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR OVERTIME (O/T) |
FFP
LABOR OVERTIME (O/T) FFP OVERTIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR PREMIUM TIME (P/T) |
FFP
LABOR PREMIUM TIME (P/T) FFP PREMIUM TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LABOR TRAVEL TIME (T/T) |
FFP
LABOR TRAVEL TIME (T/T) FFP TRAVEL TIME LABOR EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| MATERIAL FFP MATERIAL EXPENSES |
FFP
MATERIAL FFP MATERIAL EXPENSES NOT INCLUDED IN CLIN 0001 THROUGH 0014 OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TRAVEL EXPENSES FFP TRAVEL |
FFP
TRAVEL EXPENSES FFP TRAVEL, PER DIEM, AIR FARE, AND GROUND TRANSPORTATION EXPENSES NOT INCLUDED IN CLINS 0001 THROUGH 0014 (SEE JOINT TRAVEL REGULATIONS) OFFERORS NEED NOT PRICE AT TIME OF AWARD-COST WILL BE NEGOTIATED AT TASK ORDER ISSUANCE. MATERIALS, SHIPPING AND PACKING COSTS WILL BE REIMBURSED IN ACCORDANCE WITH GUIDANCE SET FORTH IN THE MATERIALS REIMBURSEMENT SUPPLEMENT AND AS APPROVED BY THE CONTACTING OFFICER FOB: Destination
NET AMT
PERFORMANCE WORK STATEMENT
REFERENCES:
(a) ISO 17025, General Requirements for the Competence of Testing and Calibration Laboratories
(b) ANSI/NCSL Z540-3, Requirements for the Calibration of Measuring and Test Equipment
(c) NAVSEA 04-04734, Naval and Marine Corps Calibration Laboratory Audit/Certification Manual
(d) Military Sealift Command, Government Operations Safety Management System, Procedure 10.5-001-All, Titled “Gage, Meter, and Test Equipment Calibration Requirements” MIL-STD-1330D
(e) MIL-STD-1330D, Military Standard, Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium-Oxygen, Nitrogen, and Hydrogen Systems
BACKGROUND
Military Sealift Command (MSC) operates a fleet of diverse ships, worldwide in support of the United States Armed Forces. In order for MSC to fulfill its mission, it is imperative that these ships be maintained in a high state of material readiness.
One area is the calibration, repair and/or replacement of gauges, meters, thermometers, and test equipment used to monitor machinery performance. Gauges may be of the vacuum, compound, duplex, differential or simplex pressure types. Meters may be of the alternating or direct current types or those used to measure or monitor fluids or horsepower. Thermometers may be bimetallic, liquid in glass or remote reading types. Test equipment may include tachometers, torque wrenches, dynameters, flow meters, test gauges, and electrical test equipment.
MSC purpose for issuing this solicitation is to award contract(s) to facilitate worldwide support for calibration, repair and/or replacement of gauges, meters, thermometers and test equipment.
Calibration of gauges, meters, thermometers, and test equipment will be done "In Place", i.e., aboard the ship unless otherwise specified in the Delivery Order. Repairs and/or replacement of gauges, meters, thermometers, and test equipment will be conducted either “In Place”, i.e., aboard the ship or "Shop Repaired", i.e., at the contractor's facility. It should be noted that "Shop Repair" will still require some work to be performed on the ship. Delivery Orders, when issued to the contractor(s), will identify the individual gauges, meters, thermometers, and test equipment to be dealt with.
To compete for delivery orders for work associated with ammunition spaces, the contractor must be listed on the Certified Subcontractor Register of Calibration Providers for Ammunition Space Gauges maintained by Puget Sound Naval Shipyard and IMF, Metrology Division, POC: Michael O'Brien, PSNS, Shop 52M, Phone (360) 476-5108 or (360) 476-3448, e-mail: michael.j.obrien@navy.mil.
To compete for delivery orders for work associated with High Voltage (HV) Systems and Equipment, including work on T-AKEs, documentation is to be provided showing that contractor personnel have completed Faraday, Marine Engineers Benevolent Association (MEBA), or an equivalent, High Voltage Safety Training.
WORK REQUIRED:
1. The Contractor shall provide ALL personnel, material, and equipment to accomplish the work specified herein. All work shall be performed onsite, in one service call, and by a team of qualified technicians. Each service call shall be attended by a minimum of two qualified service technicians.
2. The Contractor shall be accredited to either reference (a) or reference (b) by a Commercial Accreditation Activity, or certified by a Navy Certification Activity to reference (c), and the scope of accreditation must cover the appropriate measurement parameters and ranges of the calibrations performed. The Contractor shall be in possession of certification documentation demonstrating the capabilities to perform the services applicable to this solicitation. The Contractor shall submit, as a part of the technical proposal, copies of said documentation. The Contractor’s certificate must cover the facility that will be accomplishing the work specified herein.
NOTE: The Government reserves the right to reject proposals submitted, in response to this RFP, that do not provide copies of certifications.
3. The Contractor shall ensure their certification is maintained current throughout the period of performance. Further, copies of current certifications shall be provided prior to exercising each option year.
4. Calibration stickers and periodicities shall be in accordance with reference (d). All Contractor calibration equipment shall have a valid certification of calibration.
5. The contractor is responsible for technicians/personnel meeting security requirements for shipboard and base assess. The Contractor will also be responsible to submit DD Form 254 Department of Defense Contract Security Classification Specification.
6. The Contractor’s pricing shall be based on the Contract Line Item Numbers (CLINs) as specified in the Performance Work Statement (PSW).
7. Tentative dates and location for each service call, under normal operating conditions, will be provided within 30 days of the commencement date. The confirmed date and ship location will be provided one week prior to the commencement date of the service call. Firm performance dates and location will be specified in each Delivery Order. The dates and location shall be verified and obtained by the Contractor prior to the Contractor’s departure to the respective ship/job site. The Contractor can receive confirmation by contacting the responsible Port Engineer or Contracting Officer whose name and phone number will be provided on each Delivery Order.
8. This PWS may require that work be performed on vessels while berthed at Government owned or Government furnished piers or while the vessel is underway. Due to worldwide ship locations and rapid changes in ship’s deployment and operating schedules, Contractor personnel must be able to respond to schedule changes within forty-eight (48) hours for Continental United States (CONUS) locations and seventy-two (72) hours for outside the Continental United States (OCONUS) locations.
9. The Contractor shall have the capabilities to simultaneously respond to service calls in multiple locations CONUS and/or OCONUS. Contractor need not be capable of performing every task order IAW FAR 16.504(c)(ii) and may choose to quote, at the task order level, for only those regional requirements in the contractor's area of operations. Contractor shall make every effort to utilize qualified local/regional support for the vessel scope and location at the task order level. Estimated travel expenses will be included in the total evaluated price and used in the best value consideration when issuing the task orders.
10. The Contractor is responsible for ensuring compliance with industrial safety and environmental regulations, State and Federal, as well as any Shipboard Safety Policies, ensuring that all personnel are in the possession of, and are properly trained in the use of Personal Protective Equipment (PPE) and it will be utilized during the performance of this contract.
11. The Contractor shall conduct an opening brief for key shipboard personnel prior to the commencement of the service call. The Port Engineer and the Contractor’s representative will mutually agree to the time and location of the briefing and the Port Engineer will assemble key shipboard personnel for attendance.
11.1 The Contractor’s opening brief shall address, as a minimum but not limited to the following:
a. Equipment to be calibrated
b. Shipboard support responsibilities (e.g. lock out/tag out)
c. Affected areas involved in the calibration
d. Affected systems or equipment that will be impacted
e. Planned schedule to accomplish requirements of Delivery Order
11.2 The contractor shall identify any items that cannot be calibrated and shall submit a condition report to document same to the Contracting Officer and Principle Port Engineer (PPE). The report shall include the Contractor's recommended repair with cost and time estimate, the cost of a replacement item of the same form, fit and function and whether or not the recommended repairs can be accomplished on board the ship. Upon receipt of the Contractor's condition report and concurrence of the PPE the Contracting Officer shall authorize repairs to the extent deemed necessary.
11.3 The Contractor shall conduct a closing brief for key shipboard personnel upon completion of the service call, The Port Engineer and the Contractor’s representative will mutually agree to the time and location of the closing brief and the Port Engineer will assemble key shipboard personnel for attendance. The Contractors closing brief shall include a typewritten preliminary report addressing, as a minimum, but not limited to, the following:
a. Status of calibration effort
b. List of affected equipment requiring repair and testing
c. List of found problems and corrective actions taken
d. Any recommendations for future repairs/modifications.
11.4 The Contractor shall provide the Contracting Officer and PPE a report, in writing, listing the gauges, meters, thermometers or test equipment repaired or replaced with the instrument manufacturer, model and serial number, date of repair or replacement, calibration date and specific location on the ship. The report shall be submitted within 10 calendar days of completion of the service call. The Contractor shall submit the report as one (1) hard copy and one (1) electronic copy in PDF format.
11.5 The contractor is to include in the pricing of this CLIN all labor and material expenses that are to be expected for normal preparation and delivery of Contract Data Requirements.
12. All technical data producedby the Contractor under the contract shall become the exclusive property of MSC in which the Government shall have unlimited rights. The Contractor shall not deliver or otherwise provide to the Government technical data or computer software, to include deliverables under the contract, with restrictions, including those as to use, modification, reproduction, and transfer, or with restrictive markings.
13. At any and all times, the Contractor agrees to promptly provide to the Government at no additional cost such documents, codes, or other materials and information that are necessary to permit the Government’s full enjoyment of its rights in the deliverables as described above.
14. CLINs 0001 through 0004: Gauges and Thermometers; Repair and Certify Calibration
14.1 Disconnect and remove each gauge and thermometer. Sealed gauges shall be removed as a complete unit.
14.2 Clear gauge lines from instrument side of root connection of obstructions by blowing clean, dry air through the lines.
14.3 Disassemble and clean equipment to remove loose paint and foreign matter. Note: Do not disassemble sealed gauge units.
14.4 Adjust/repair the gauges and thermometers to manufacturer’s specifications
14.4.1 Remove existing and install new components in place of those found to be missing or defective.
14.4.2 Free-up and adjust moving parts
14.5 Assemble equipment
14.6 Calibrate and adjust each gauge and thermometer, including associated accessories, to the manufacturer’s specifications.
15. CLINs 0001 through 0004: Meter; repair and certify calibration
15.1 Disconnect and remove meters and their associated impeders, reactors, resistance boxes and shunts.
Record and retain hook-up data and mounting hardware.
15.2 Inspect lead wires and insulation; broken or partially broken lead wires shall be cut back to remove damaged/questionable portions of the wire and new terminal ends installed in accordance with manufacturer’s specification.
15.3 Remove existing and install new wire markers in place of wire markers found to be illegible. Install new wire markers where missing.
15.4 Disassemble and clean equipment to remove loose paint and foreign matter.
15.5 Repair the meters and associated equipment to manufacturer’s specifications.
15.5.1 Remove existing and install new components where missing or defective.
15.5.2 Free-up and adjust moving parts
15.6 Assemble equipment. Install new seals and gaskets conforming to manufacturer’s specifications.
15.7 Adjust and calibrate each meter, including associated equipment, to manufacturer’s specifications using a transfer measurement standard.
16. CLIN 0005: Calibrate/recalibrate and align RPM indicating systems from their source as a complete system.
17. CLIN 0006: Calibrate/recalibrate and align pitch indicating systems from their source as a complete system.
18. CLIN 0007: Reserved.
19. CLIN 0008: Calibrate/recalibrate and align degaussing systems from their source as a complete system, including shunt loops.
20. CLIN 0009: Calibrate/recalibrate gas analyzers.
21. CLIN 0010: Oxygen Generating Plant Gauges and Thermometers; repair and certify calibration.
21.1 Gauges and thermometers serving the clean side of oxygen distribution systems shall be removed, transported, and reinstalled by a company certified under reference (e). Calibration of these gauges shall be in accordance with paragraph 15.
22. CLIN 0011: Calibrate/recalibrate test equipment in accordance with equipment manufacturer requirements.
23. CLIN 0012 through 0014: Provide, calibrate, and install replacement Gauges, Meters, Thermometers with same or equivalent to originals.
24. CLIN 0015: Labor-Straight Time (S/T): The contractor will be reimbursed for straight time labor expenses that are required but not included in pricing for CLINs 0001 through 0014 Straight time (S/T) includes normal work of eight (8) hours per day, five (5) days per week, Monday through Friday.
25. CLIN 0016: Labor-Overtime (O/T): The contractor will be reimbursed for overtime labor expenses that are required but not included in pricing for CLINs 0001 through. 0014. Overtime (O/T) includes any work in excess of eight (8) hours per day or in excess of forty (40) hours per week, or work performed on Saturdays.
26. CLIN 0017: Labor-Premium Time (P/T): The contractor will be reimbursed for premium time labor expenses that are required but not included in pricing for CLINs 0001 through 0014. Premium time includes any work performed on Sundays or holidays.
27. CLIN 0018: Labor-Travel Time (T/T): The contractor will be reimbursed for travel time including Saturdays, Sundays, and Holidays at straight time (S/T) rates.
28. CLIN 0019: Material: The contractor shall make an effort to utilize parts currently in the Government’s inventory. The contractor will be reimbursed for material that is required but not included in pricing for CLINs 001 through 0014. Material orders not connected to services may be required.
29. CLIN 0020: Travel, Per Diem, Air Fare, and Ground Transportation: The contractor will be reimbursed for all travel and mobilization expenses including air fare, excess baggage charges, car rental, transfers, visas, local transportation and mobilization charges as well as per diem charges as set by Joint Travel Regulations.
SPECIAL CONTRACT REQUIREMENTS
1. SUPERVISION AND CONTROL:
The Government shall not exercise any supervision or control over the Contractors employees performing services under this contract. Such employees shall be accountable, not to the Government, but solely to the Contractor, who in turn is responsible to the Government.
2. INSURANCE: Addendum to 52.228-5 CONTRACT TERMS AND CONDITIONS - COMMERCIAL
ITEMS
(i) Insurance: Federal Law and regulation require Government contractors to possess appropriate insurance coverage for their employees. The Government requires evidence of appropriate insurance, including Longshoreman's and Harbor Workers' Compensation Act (LHWCA) coverage required to perform work on or near ships. (33 U.S.C. S903(a)). All policies shall contain an endorsement stating that any cancellation or material change in the coverage adversely affecting the Government's interest shall not be effective unless the Contractor provides written notice of the same to the Contracting Officer.
ADDENDUM TO 52.228-5:
The Contractor shall maintain during the entire performance period of this contract, insurance of at least the following kinds and minimum amounts set forth below:
(a) Workers Compensation and Employers' Liability Insurance in accordance with the amounts specified by the laws of the state in which the work is to be performed under this contract. In the absence of such state laws, an amount of $100,000 shall be required and maintained.
(b) General Liability Insurance with bodily injury liability in the minimum amount of $500,000 per occurrence.
(c) Automobile Liability Insurance (if van service is provided) in the amount of $200,000 per person and
$500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
(d) Other Compliances required: The Government reserves the right to request evidence of appropriate insurance, including Longshoreman's and Harbor Workers' Compensation Act (LHWCA) coverage required to perform work on or near ships. (33 U.S.C. S903(a)).
3. PRIOR WRITTEN PERMISSION REQUIRED FOR SUBCONTRACTS:
None of the services required by this contract shall be subcontracted to or performed by persons other than the contractor or the contractor's employees without the prior written consent of the Contracting Officer.
4. ORDERING PROCEDURES:
IMPORTANT: All orders under any resultant IDIQ contract shall be fixed price. Vendors shall provide a fixed-price quote for labor hours and material under CLINS 0001 – 0020 (and corresponding option CLINS) to complete necessary repairs. After following applicable selection procedures, the ordering officer shall issue a fixed-price task or delivery order in response to the quote and after concurrence of the Port Engineer.
The contractor (s) is authorized to accept oral orders containing the same information as required on SF 1449. Oral orders may be used as advance instruments and must be confirmed by issuance of a SF 1449 within 5 business days. No payments shall be made for any work not supported by a duly executed SF1449 and acceptance letter from PPE, CHENG, or COR.
5. METHOD OF SELECTION FOR ISSUANCE OF ORDERS:
The following method of issuing orders shall be used by the Government:
(a) Except as provided for at FAR 16.505(b)(1) and DFARS 216.505-70(b), fair consideration shall be given to all awardees prior to placing each order in excess of $3,000 in accordance with the following selection procedures.
(b) The ordering officer may consider factors such as price or cost, past performance on earlier orders under the contract (including quality, timeliness and cost control) and/or other factors that are relevant to the requirements of an individual order.
(c) Award of individual orders shall be made based on what is most advantageous to Government, in the judgment of the ordering officer. Ordering officer will issue a request for quote (RFQ) to all potential awardees by e-mail or fax giving a fair opportunity to bid on requirements in accordance with FAR Part 16.505(b)(1)(ii).
(d) In accordance with NMCARS 5216.505(b)(5), the task and delivery order ombudsman responsible for reviewing complaints from contractors is the Navy Competition Advocate General. Contractors should be encouraged to settle their complaints through the Competition Advocate chain of command, seeking review by the Command Competition Advocate at the cognizant HCA before taking their complaints to the Navy Competition Advocate General.
Military Sealift Command Competition Advocate
Ms. E Hitshew (N102)
6. MINIMUM AND MAXIMUM QUANTITIES:
As referred to in paragraph (b) of the “Indefinite Quantity” clause of the contract, the contract minimum quantity ordered under any resultant contract is a total of $2,500 worth of orders at the contract unit price(s) per base or option year. The maximum contract quantity is the total amount of supplies and services at the rates the contractor proposes within the per-year maximums specified below. The maximum quantity is not to be exceeded without prior approval of the Administrative Contracting Officer.
MSC is evaluating Unit Price.
MIN
MAX
| Base Year |
| $2,500.00 |
$5,814,164.60
| Option Year 1 |
| $2,500.00 |
$5,988,589.54
| Option Year 2 |
| $2,500.00 |
$6,168,244.14
| Option Year 3 |
| $2,500.00 |
$6,363,291.46
| Option Year 4 |
| $2,500.00 |
$6,543,890.20
| Total |
| $12,500.00 |
$30,878,180.00
7. Task Orders Point of Contact (POC) for Contractor:
Prior to contract award the successful offeror in response to the solicitation shall provide a single point of contact (POC) for all task orders issued under the resultant contract. The offeror shall provide a single name, mailing address, telephone number, facsimile number and email address. This POC shall be available to the contracting officer or his/her designated representative on a 24-hour emergency basis.
8. DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE (COR)
Name: Mr. P. DeSimone
Address: Department of the Navy
Military Sealift Command
Title: CONTRACTING OFFICER’S REPRESENTATIVE
a. The above named individual is hereby designated as authorized COR for this contract. In the event that more than one COR is designated the delivery order shall specify the COR for that particular order. As such, this individual is responsible for monitoring progress and overall technical surveillance of services to be performed under this contract and should be contacted regarding questions or problems of a technical nature. In no event will any understanding or agreement, modification, change order, or other matter deviating “from the terms of the basic contract between the contractor and any person other than the Contracting Officer be effective or binding upon the Government.
When in the opinion of the Contractor, the COR requests effort outside the existing scope of the contract, the Contractor will promptly notify the Contracting Officer. No action will be taken by the Contractor under such delivery order unless the Contracting Officer has issued a contractual document authorizing the change.
b. List of duties to be performed by COR in the technical monitoring of the Contract:
(1) Serve as the contact point through which the contractor can relay questions or problems of a technical nature to the Contracting Officer.
(2) Monitor services being performed to assure contractor is following the regulations, qualification requirements cited in the contract.
(3) Alert the Contracting Officer, as appropriate, to any potential problems which may affect cost or performance schedules.
(4) Determine causative factors for any slippage in the performance schedule and report to the Contracting Officer making recommendations for corrective action to eliminate the cause of the slippage. In addition, the contractor’s performance should be monitored to assure that corrective action is being taken.
(5) Being responsible for the inspection and acceptance of the services performed. Ensure compliance with the clause at FAR 52.212-4 which provides the Government the right to require the contractor to perform the services again, in conformity with the contract requirements, without additional payment.
18. PERIOD OF PERFORMANCE
| PERIOD OF PERFORMANCE |
| CLINS |
| ORDERING PERIOD |
| BASE |
| 0001 – 0020 |
| 01Aug 15 – 31 Jul 16 |
| Option Yr. 1 |
| 1001 – 1020 |
| 01Aug 16 – 31 Jul 17 |
| Option Yr. 2 |
| 2001 – 2020 |
| 01Aug 17 – 31 Jul 18 |
| Option Yr. 3 |
| 3001 – 3020 |
| 01Aug 18 – 31 Jul 19 |
| Option Yr. 4 |
| 4001 – 4020 |
| 01Aug 19 – 31 Jul 20 |
19. SHIP LISTING
| T-AO |
| HULL |
| USNS HENRY J. KAISER |
| T-AO 187 |
| USNS JOSHUA HUMPREYS |
| T-AO 188 |
| USNS JOHN LENTHALL |
| T-AO 189 |
| USNS WALTER S. DIEHL |
| T-AO 193 |
| USNS JOHN ERICSSON |
| T-AO 194 |
| USNS LEROY GRUMMAN |
| T-AO 195 |
| USNS KANAWHA |
| T-AO 196 |
| USNS PECOS |
| T-AO 197 |
| USNS BIG HORN |
| T-AO 198 |
| USNS TIPPECANOE |
| T-AO 199 |
| USNS GUADALUPE |
| T-AO 200 |
| USNS PATUXENT |
| T-AO 201 |
| USNS YUKON |
| T-AO 202 |
| USNS LARAMIE |
| T-AO 203 |
| USNS RAPPAHANNOCK |
| T-AO 204 |
| T-AKE/T-AOE/T-AE |
| HULL |
| USNS LEWIS AND CLARK |
| T-AKE 1 |
| USNS SACAGAWEA |
| T-AKE 2 |
| USNS ALAN SHEPARD |
| T-AKE 3 |
| USNS RICHARD E. BYRD |
| T-AKE 4 |
| USNS ROBERT E. PEARY |
| T-AKE 5 |
| USNS AMELIA EARHART |
| T-AKE 6 |
| USNS CARL BRASHEAR |
| T-AKE 7 |
| USNS WALLY SCHIRRA |
| T-AKE 8 |
| USNS MATTHEW PERRY |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .