RFP_Q_ _A_13.docx
DOCX document 29 KB Posted
- Attached to
- Synopsis Notice Federal contract opportunity
- Solicitation number
- N32205-15-R-4006
About this file
Question and Answer No. 13
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Synopsis_Notice.docx | DOCX document | |
| USNS_SPEARHEAD_Sources_Sought.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N32205-15-R-4006
QUESTIONS AND ANSWERS
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
SPECIFICATION ITEM NO.: _____511________________
PARAGRAPH / SECTION NO.: _____Various___________
TITLE: ____WASTE OIL TANK REPAIR AMENDMENT B______
QUESTION:
1. None of the references were provided with the item and they are critical for fabrication. Please forward all references.
| 2.0 | REFERENCES |
| 2.1 | DWG 8444467_D Waste Oil Tank 4000L |
| 2.2 | DWG 8442868_D Material List |
| 2.3 | DWG 8443695_C Module H04P Machinery Space Arrangement |
| 2.4 | DWG 8443696_D Module H04P Equipment Removal Route |
| 2.5 | DWG 8442890_C Typical Structural Frames Hull Void 42-51 |
| 2.6 | DWG 8442897_F Structural Plan Main Deck |
2. Is the intent of the item to fabricate a new port waste oil tank in its entirety? What does the reference to shell plating mean?
3. Will any work be accomplished on the starboard oil tank?
4. Will any main deck plating be replaced or is reference 2.6 provided because the expected rigging route will pass through the main deck?
ANSWER:
1. References available via AMRDEC SAFE Website.
2. Yes, fabricate a new port waste oil tank in its entirety. Reference to shell plating refers to the plating making up the tank boundary. Tank is a free standing tank and thus does not share a boundary with the ships shell.
3. Starboard tank will be coated.
4. Reference 2.6 is provided for purposes of rigging route development. Apart from possible rigging route interference the main deck is not required to be replaced. Contractor shall use this reference along with the remaining references to determine the optimal rigging route to submit for MSCREP approval.
File details come from the government source that posted it. Updated .