0106_A__STABILITY_TEST_REMOVALS_(revised_5_11)).docx

DOCX document 44 KB Posted

Attached to
USNS SALVOR MID TERM AVAILABILITY Federal contract opportunity
Solicitation number
N32205-15-R-4002
Issued by
Department of the Navy Military Sealift Command

About this file

Revised Work Item 106

View the file

Other files for this federal contract opportunity

Other files attached to USNS SALVOR MID TERM AVAILABILITY, newest first.
File Type Posted
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_May_2015.doc DOC document
N32205-15-R-4002_AMEND_0005.doc DOC document
N32205-15-R-4002_AMEND_0004.docx DOCX document
N32205-15-R-4002_AMEND_0003.doc DOC document
920_A___UNDERWATER_HULL_INSPECTION_AND_PROPELLER_POLISHING_(rev_A).doc DOC document
N32205-15-R-4002_AMEND_0002.doc DOC document
N32205-15-R-4002_AMEND_0001.doc DOC document
J-2_Category_A_Items__SALVOR_MTA_2015_REVISED.xls XLS spreadsheet
ANSWERS_TO_RFC_QUESTIONS.docx DOCX document
Work_Boat_Davit_Distr_Statement.pdf PDF
5763519.pdf PDF
8495071_-.pdf PDF
5762655_ _Ref_4.pdf PDF
LR_Ramps.pdf PDF
Allied_Crane.pdf PDF
5763049_C.PDF PDF
5762660_K.PDF PDF
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_7_MSFSC_Ship_Repair_Facility_Survey.doc DOC document
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_12_Past_Performance_Data.doc DOC document
J_-_10_Interport_Differential.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J-3_Category_B_Items_SALVOR_MTA__2015.xls XLS spreadsheet
USNS_SALVOR__MTA_N32205-15-R-4008__GFM_REPORT_(FEB_06_2015).xlsx XLSX spreadsheet
J-2_Category_A_Items__SALVOR_MTA_2015.xls XLS spreadsheet
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
N32205-15-R-4002_USNS_SALVOR.doc DOC document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SALVOR

(T-ARS 52)

HULL & STRUCTURERFP NO. N32205-15-R-4002
12 May, 2015
ITEM NO. 106 (revised)CATEGORY "A"MSC/N43D/WDD

STABILITY TEST-REMOVAL

1.0 ABSTRACT:

1.1 Remove and store various material for individual work items.

2.0 REFERENCES/ENCLOSURES:

2.1 REFERENCES: None

2.2 ENCLOSURES:

2.2.1 Light Ship Material Removal List.

3.0 DESCRIPTION/QUANITITY:

3.1 As per enclosure (1) light ship list of material.

7.0 PREPARATION OF THE SHIP:

7.1 The SHIPYARD shall be responsible for the complete temporary removal and stowage of the items listed in enclosure 1. Stowage will be in addition to that required by the WI# 015 Storage. Upon completion return all items to their original location.

7.2 All removals will be coordinated with individual work items..

7.3 Stage Spring Buoys (4) listed in Enclosure (1) in an area where Ships Force can chip, paint and make repairs. Provide protective berm for prep & painting . Dispose of all paint debris upon completion of all repairs and painting.

8.0 GENERAL REQUIREMENTS: None additional.

ENCLOSURE (1):

NewPengCons

17352

106 - 1 -image1.emf

Light Ship Material Removal

FIXED MISSION GEAR REMOVAL LIST

The following items shall be temporally removed by shipyard personnel from spaces aboard USNS SALVOR.

Weather Deck Midships: (Work Item 601/603/631 & Ship Force Work)

· 4 Spring Buoys located FWD and AFT, port and starboard, at approximately FR 46 & FR 52 on 02 LVL

· 35’ Workboat on port side

· Rigid-hull Inflatable Boat (RIB) located on starboard side

· Drums and other liquid containers stored in plastic HAZMAT LKR located on 01 LVL port side and aft of door from weather to Passage 01-53-3-L at approximately FR 58.

(Approximately 8 Drums.)

Weather Deck AFT: (Work Item 507)

· 2 tow bows (each with center component and port/starboard components) stowed on top of the LAZARETTE (1-78-0-A)

· Note: Only 1 tow bow was observed aboard USNS SLAVOR during the OCT 2014 VR availability ship check. During the 2015 MTA, both stowage locations shall be checked and all stowed tow bows will require removal.

· Hawk anchor and hawk anchor stock mounted to the top and aft bulkhead of the LAZARETTE (178-0-A)

Chain lockers: ( Work Item 503)

· Chain in CHAIN LKR 3-78-1-A- 2 SHOTs of 2 ¼” Salvage Chain.

· Chain in CHAIN LKR 2-78-2-A- 2 SHOTS of 2 ¼” Salvage Chain.

Wire Rope Bins: (Maybe Removed or Protected for WI# 107-R/R Scuttle )

· Wire Rope-

· Outboard Wire Rope Bin

· 2” X 50’ qty (4).

· 1-1/8” X 65’ qty (1).

· 2” X 40’ qty (2)

· 2-1/4” X 40’ qty (1)

· 2-1/4” X 50’ qty (1)

· Inboard Wire Rope Bin

· 1-5/8” X 300’ qty (2).

· 1-5/8” X 600’ qty (8).

· 1-1/4” X 100’ qty (24)