Attachment 4 Q&A.pdf

PDF 523 KB Posted

Attached to
USS PORT ROYAL Habitability Work Federal contract opportunity
Solicitation number
N0060420Q4012
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This combined synopsis and solicitation requests quotes for habitability upgrade supplies and services aboard the USS PORT ROYAL. The Navy seeks to replace crests, stickers, reseal vestibules, replace lagging, paint lockers, replace ceiling grids and tracks, reupholster furniture, rehabilitate doors, replace berthing couches, install shelving, and resurface showers and heads. Quotes are due by December 23, 2019 with award by March 31, 2020. The requirement is set aside for small businesses and will result in a firm-fixed price purchase order paid by government purchase card. The solicitation incorporates various FAR and DFARS clauses and is posted to SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to USS PORT ROYAL Habitability Work, newest first.
File Type Posted
Attachment 5 Q&A Pictures.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 3 - FAR 52.212-3 Alt I.docx DOCX document
Attachment 2 - Price Matrix.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 N0060420Q4012

Solicitation Q&A

12/17/2019

SOW Par. Reference

2.1 Q: Will the vendor redo the crest for the Pilot House and stickers for the Ceremonial

Quarterdeck?

A: Yes, the vendor is to replace the crest and stickers.

Q: Does the Offier’s P/Way vestibule need to be resealed/replaced?

A: Yes.

2.2 Q: Does all the lagging in the Heater Room need to be replaced?

A: Only replace what is needed.

2.3 Q: How many supply lockers will need to be painted?

A: Three - drink line, foul weather, and galley areas.

2.4 Q: Will the ceiling track need to be replaced?

A: The ceiling grid supports will be reused for the Battle Room and CPO Lounge and replaced in the Scullery, per SOW par 2.4.

2.5 Can photos be provided of the couches and bunkbed that needs to be re-upholstered?

A: See Attachment 5 of solicitation for photos.

2.6 Q: Why do the door hinges need to be rehabbed?

A: The door hinges need to be rehabbed because the doors won’t close.

2.7 Q: Does installation of the berthing couch replacement include bolting the couches to the deck?

A: Couch installation includes securing the couches to the deck so that they do not shift around when the ship is out to sea.

Q: Can examples of the new berthing couches be provided?

A: See Attachment 5 of solicitation for example photos.

Attachment 4 N0060420Q4012

2.8 Q: What is the purpose of the wall bracket in the laundry room?

A: A frame to hold supplies for laundry.

Q: What headspace between the shelves is needed?

A: About 18 inches.

2.10 Q: Will the shower and head need to be resurfaced?

A: Yes.

Q: For the female head, will the trim need to be replaced?

A: At the vendor’s discretion.

Q: For the male head, do the small holes in the steel walls need to be repaired?

A: Yes, vendor should resurface the damaged stainless steel.

File details come from the government source that posted it. Updated .