NGTR Program Risk Feedback Matrix.pdf
PDF 61 KB Posted
- Attached to
- Next Generation Tactical Radio (NGTR)
- Solicitation number
- N00421-27-RFPREQ-TPM209-0199
About this file
This document is a risk assessment and vendor feedback template designed for federal program planning and solicitation development. The template provides a structured framework for evaluating program elements and risks across five key categories: Program Scope, Timeline, Technical Risk, Security/NSA, and Other Risks. Each category includes columns for documenting draft program elements or risk areas (with examples such as backwards compatibility with ARC-210 Gen 5/6, 12-month timeline to TS facility clearance, waveform support up to 6 GHz in small form factor, modular HAD certification timeline, and supply chain/DMSMS long-lead items), capturing vendor feedback and suggested changes, assessing impact on timeline and cost using a High/Medium/Low scale, and documenting recommended mitigation strategies. The template is designed to facilitate risk identification and management during the pre-solicitation phase, allowing program managers to systematically collect and evaluate contractor input on feasibility concerns before formal release of a Request for Proposal or related solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NGTR RFI performance requirements - DRAFT.docx | DOCX document | |
| NGTR Program Risk Feedback Matrix.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CATEGORY
DRAFT PROGRAM
ELEMENT / RISK
AREA
VENDOR
FEEDBACK &
SUGGESTED
CHANGES
IMPACT ON
TIMELINE /
COST
RECOMMENDED
MITIGATION
STRATEGY
Program Scope e.g., Backwards compatibility with ARC-210 Gen 5/6
High / Medium / Low
Timeline e.g., 12 months from award to TS facility clearance
High / Medium / Low
Technical Risk e.g., Waveform support up to 6 GHz in small form factor
High / Medium / Low
Security / NSA e.g., Modular HAD certification timeline
High / Medium / Low
Other Risks e.g., Supply chain / DMSMS long-lead items
High / Medium / Low
File details come from the government source that posted it. Updated .