EPF Industry Day Questions and Answers.docx
DOCX document 14 KB Posted
- Attached to
- Industry Day for N0042123R0049 - NAWCAD WOLF Engineering, Prototyping, and Fabrication (EPF)
- Solicitation number
- N0042123R0049_Industry_Day
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IDEP Brief_FINAL.pptx | PPTX presentation | |
| Base Access Form.pdf | ||
| EPF Registration Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EPF Industry Day Questions and Answers
Q: Can you bid over tripwires?
A: Yes, if your proposal is going to have cost that are over tripwires that does not mean not to bid. Just provide rational and justification in your proposal.
Q: Will this requirement be posted via Seaport?
A: No this will be going out through SAM and PIEE. It is a single award IDIQ Q: Does EPF do anything beyond repair?
A: EPF provides repair and manufacturing support for NAWCAD WOLF and NAVAIR. Please see the provided presentation which details the type of work completed within TW22 and the EPF.
Q: What is the biggest component you can put in Autoclave?
A: We do not have an autoclave. We have an industrial oven that has an approximate capacity of 16”x16”x16”.
Q: What kind of composite manufacturing currently occurs at the shop?
A: Radomes, antenna reflector components, sub reflector fabrication and small composite panels.
Q: Any facilities maintenance/ management on requirement?
A: Yes, Facilities Maintenance and Management requirements are included in the scope of this contract. Basic repairs and maintenance to buildings, property and equipment located at WOLF.
Q: Will there be a draft RFP?
A: Yes, a draft RFP will be posted via SAM and PIEE. Vendors will have the opportunity to submit questions against the draft RFP.
Q: If past performance is a requirement will you look at CPARS?
A: Yes, CPARS is a tool we will use to evaluate past performance if it is a requirement.
Q: In the last solicitation there were a high number of key personnel required in the requirement. Can we expect this in this RFP?
A: No. The number will be reduced from last RFP.
Q: Will a sample task be in the RFP?
A: Yes.
Q: Will some labor mix/hours and ODC cost be provided?
A: Yes, the labor mix/hours and ODC costs will be provided.
Q: When will the final RFP be released.
A: After the draft RFP is posted and the feedback is received on that and edits are made. Refer to the long range acquisition forecast.
Q: What is the set aside determination?
A: Total Small Business set aside.
Q: Is additive manufacturing for metal performed as well?
A: The only metal additive manufacturing capability currently at the EPF is provided by the Meltio CNC hybrid add on kit which adds welding capability to a preexisting CNC mil. The EPF does not have a traditional metal 3D printer.
Q: Is your throughput fluid?
A: Throughput is based on customer demand.
Q: Compared to last PWS there is an increase in workload. Why?
A: This is due to an increase in throughput and customer demand.
Q: In the brief it was mentioned one piece of equipment was not being added this year. What was that?
A: The CT scanner.
Q: What are key metrics used to determine if EPF is successful.
A: Some metrics we look at are Cost, Risk, and Schedule.
Q: Will the RFP have a 30 or 45 day window?
A: 30 as of right now. Please read over the RFP to confirm at posting.
Q: What will the ratio of SCA vs Non SCA be?
A: Please refer to the draft RFP at time of posting.
Q: Is there a safety plan requirement since near an airfield?
A: Currently there is no safety plan requirement as a result of our location.
Q: Will the clause 52.222-17 be in this contract?
A: Not sure right now. Will be apparent in the draft RFP.
Q: Is there a gate requirement for this effort such as AS9100 certification?
A: No Q: Is there a security clearance requirement.
A: This will be apparent in the draft RFP.
Q: Is the NAICS + PCS code finalized?
A: Yes.
Q: Is there an approved purchasing system requirement?
A: No.
Q: Is there a transition plan in current contract?
A: Will be apparent in Draft RFP.
Q: Is there a desired local corporate presence?
A: The RFP will address the requirement to be within a specific range.
Q: Is the IGCE based on Full time staffing?
A: Yes.
File details come from the government source that posted it. Updated .