Attachment P06 - Cost Summary Spreadsheet.xls

XLS spreadsheet 88 KB Posted

Attached to
NAWCAD WOLF SCMS Special Communication Rapid Integration Facility (SCRIF) RFP Amendment 0002
Solicitation number
N00421-20-R-0146
Issued by

About this file

This document contains a cost summary spreadsheet template and instructions for completing it in response to a solicitation from the Department of the Navy Naval Air Systems Command Naval Air Warfare Center. The solicitation seeks proposals to provide rapid integration of C5ISR systems onboard small and large craft, commercial and militarized vehicles, transit cases, mobile communications, fixed base stations, command centers, and intelligence systems at various locations including Lexington Park and St. Inigoes in Maryland and Jacksonville, Florida. Offerors must complete the cost summary spreadsheet template to include labor categories and rates, direct labor costs, indirect costs, subcontractor information, fee rates, and other direct costs for the base period and four option years. The template also includes a summary sheet to break out costs by contract line item number and ensures total costs match the solicitation.

View the file

Other files

File Type Posted
Attachment P08 - Labor Hours.xlsx XLSX spreadsheet
N0042120R01460002.pdf PDF
Attachment P03 - Fully Burdened Labor Rates.xlsx XLSX spreadsheet
Attachment P06 - Cost Summary Spreadsheet.xls XLS spreadsheet
Attachment P03 - Fully Burdened Labor Rates.xlsx XLSX spreadsheet
N0042120R01460001.pdf PDF
Attachment P08 - Labor Hours.xlsx XLSX spreadsheet
Attachment 6 - Data Item Transmittal Form.docx DOCX document
N00421-20-R-0146.pdf PDF
Attachment P10 - Drawing 14240202.PDF PDF
Attachment 2 - Contract Surveillance Plan (CSP).docx DOCX document
Exhibit A CDRLs.docx DOCX document
Attachment P08 - Labor Hours.xlsx XLSX spreadsheet
Attachment 14 - SCMS Division RDTE Network SOP.pdf PDF
Attachment P12 - Drawing E10-30433.pdf PDF
Attachment P02 - CPAQ.pdf PDF
Attachment 7 - Small Business Subcontracting Plan.docx DOCX document
Attachment 1 - DD 254.pdf PDF
Attachment 13 - ACOR Designation Letter.docx DOCX document
Attachment 15- Non-Navy IT Certification Form.docx DOCX document
Attachment 12 - COR Designation Letter.docx DOCX document
Attachment P04 - BLS Chart (2).xlsx XLSX spreadsheet
Attachment 9 - List of Approved Subcontractors.docx DOCX document
Attachment P09 - Drawing E10-30406.pdf PDF
Attachment 10 - Wage Determination.docx DOCX document
Attachment P03 - Fully Burdened Labor Rates.xlsx XLSX spreadsheet
Attachment 3 - Segregation of Costs Format.docx DOCX document
Attachment P11 - Drawing 14240822.pdf PDF
Attachment P01 - Past Performance Information Form.pdf PDF
Attachment 11 - OCI.docx DOCX document
Attachment 8 - List of Key Personnel.docx DOCX document
Attachment 16 - Locator Form.docx DOCX document
Attachment P06 - Cost Summary Spreadsheet.xls XLS spreadsheet
Attachment 5 - TASK ORDER CLOSEOUT.docx DOCX document
Attachment 4 - Workforce Reporting Template.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4In column D, choose the work location that the contractor will be working at in accordance with the P4. Note, the Location-Labor Cat Spreadsheet can be referenced to show how the P4 locality lines up with the SOW. If a labor category is to be worked at two different locations, please specify these differences. (For example Emloyee A and Employee B are both Junior Electrical Engineers. Employee A will work in Maryland and Eployee B will be working in Jacksonville. Entries should be made in two seperate rows, noting this locality difference.)
5Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
6The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
7All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
8All dollar figures shall be carried out no further than two decimal places.
9In column E, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
10In column F, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
11Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
12For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
13Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
14The prime should insert the subcontractor handling charge, if any.
15The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
16The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
17Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
18Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
19On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
20When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A13, and A20.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4In column D, choose the work location that the contractor will be working at in accordance with the P4. Note, the Location-Labor Cat Spreadsheet can be referenced to show how the P4 locality lines up with the SOW. If a labor category is to be worked at two different locations, please specify these differences. (For example Emloyee A and Employee B are both Junior Electrical Engineers. Employee A will work in Maryland and Eployee B will be working in Texas. Entries should be made in two seperate rows, noting this locality difference.)
5Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
6The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
7All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
8All dollar figures shall be carried out no further than two decimal places.
9In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
10In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
11Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
12For subcontractor cost summary sheets, delete Rows 22-48.
13When submitting this file, the instructions may be deleted.

Location-Labor Cat Spreadsheet

P4 LocationLocation specified in SOWLabor CategoriesBLS SOCSCA Code
California-Lexington Park, MDWOLF, St. Inigoes, MDGeneral and Operations Manager, Senior*11-1021
Jacksonville, FLJacksonville, FL AreaIndustrial Production Manager, Senior*11-3051
California-Lexington Park, MDWithin 50 drivable miles to WOLF, St. Inigoes, MDElectrical Engineer, Journeyman*17-2071
Mechanical Engineer, Journeyman*17-2141
Program Manangement Specialist13-1082
Management Analyst, Journeyman13-1111
Management Analyst, Journeyman*13-1111
Logistician, Journeyman13-1081
Acquisition Logistics Analyst, Journeyman*13-1081
Team Assembler, Journeyman51-2092
Team Assembler, Junior51-2092
Electronics Technician Maintenance III (SCA)17-302323183
Electronics Technician Maintenance III (SCA)17-302323183
Electronics Technician Maintenance III (SCA) (OT)17-302323183
Electronics Technician Maintenance II (SCA)17-302323182
Electronics Technician Maintenance II (SCA) (OT)17-302323182
Electronics Technician Maintenance I (SCA)17-302323181
Electronics Technician Maintenance I (SCA)(OT)17-302323818
Engineering Technician, III (SCA)17-302930083
Engineering Technician, III (SCA)17-302930083
Engineering Technician, III (SCA)(OT)17-302930083
Engineering Technician, II (SCA)17-302930082
Engineering Technician, II (SCA)17-302930082
Engineering Technician, II (SCA)(OT)17-302930082
Engineering Technician, I (SCA)17-302930081
Engineering Technician, I (SCA)(OT)17-302930081
Technical Instructor/Course Developer (SCA)11-313115090
Sheet Metal Worker, Maintenance (SCA)47-221123890
Shipping/Receiving Clerk (SCA)43-507121130
Supply Technician (SCA)43-506101410
Drafter/CAD Operator II (SCA)17-301230062
Administrative Assistant (SCA)43-501101020
General Clerk II (SCA)43-906101112
Technical Writer II (SCA)27-304230462
Truck Driver (SCA)53-303031361
Electrical and Electronic Engineering Technologist & Technician17-302330461

Cost Summary Spreadsheet

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
Ordering Period Year 1Ordering Period Year 2Ordering Period Year 3Ordering Period Year 4Ordering Period Year 5Total for All Years
Cost ElementsGovernment Labor CategoryProposed Labor CategoryLocation (IAW P4)F/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 10000000
Employee Name 20000000
Etc.0000000
Total Direct Labor Cost0000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost000000
COM
Total Prime Contractor Labor Cost000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost Plus Fixed Fee (CPFF)0
Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs
Total CPFF all CLINs (Labor and ODCs)$ - 0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%
*In Section B, the prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

&CPage &P&R&F &LKTR: (name)&CSource Selection Information - See: FAR 2.101 and 3.104&RRFP:

Summary

Ordering Period Year Summary Sheet
Ordering Period YearOrdering Period Year DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
X001
X002
X003
X004
X005
Total$ - 0

B-1 Composite Rates

Labor Category (* = Labor Category with Key Employee (s))Composite Fully Burdened Rates, Exclusive of Fee
Year 1Year 2Year 3Year 4Year 5
12/02/2021 - 12/01/202212/02/2022 - 12/01/202312/02/2023 - 12/01/202412/02/2024 - 12/01/202512/02/2025 - 12/01/2026
General and Operations Manager, Senior*
Industrial Production Manager, Senior*
Electrical Engineer, Journeyman*
Mechanical Engineer, Journeyman*
Program Manangement Specialist
Management Analyst, Journeyman
Management Analyst, Journeyman*
Logistician, Journeyman
Acquisition Logistics Analyst, Journeyman*
Team Assembler, Journeyman
Team Assembler, Junior
Electronics Technician Maintenance III (SCA)
Electronics Technician Maintenance III (SCA)
Electronics Technician Maintenance III (SCA) (OT)
Electronics Technician Maintenance II (SCA)
Electronics Technician Maintenance II (SCA) (OT)
Electronics Technician Maintenance I (SCA)
Electronics Technician Maintenance I (SCA)(OT)
Engineering Technician, III (SCA)
Engineering Technician, III (SCA)
Engineering Technician, III (SCA)(OT)
Engineering Technician, II (SCA)
Engineering Technician, II (SCA)
Engineering Technician, II (SCA)(OT)
Engineering Technician, I (SCA)
Engineering Technician, I (SCA)(OT)
Technical Instructor/Course Developer (SCA)
Sheet Metal Worker, Maintenance (SCA)
Shipping/Receiving Clerk (SCA)
Supply Technician (SCA)
Drafter/CAD Operator II (SCA)
Administrative Assistant (SCA)
General Clerk II (SCA)
Technical Writer II (SCA)
Truck Driver (SCA)
Electrical and Electronic Engineering Technologist & Technician

File details come from the government source that posted it. Updated .