Section_M_-_Draft_RFP_(Final).pdf
PDF 165 KB Posted
- Attached to
- 6. 8 CBO Acquisition Support Services Federal contract opportunity
- Solicitation number
- N0042119R0024
About this file
This draft request for proposals outlines requirements for acquisition support services. The solicitation seeks proposals for a single-award indefinite delivery/indefinite quantity contract to provide comprehensive acquisition management, planning, execution, administration, program management, systems engineering, and financial management support to the Naval Air Systems Command 6.8 Corporate Business Office. The anticipated contract type is cost-plus-fixed-fee, with a level of effort of 480,000 man-hours over a five-year ordering period. The requirement is set aside for small businesses under NAICS code 541611 with a size standard of $15 million. The solicitation package includes drafts of the statement of work, Section L instructions, and Section M evaluation criteria. Interested parties may submit questions by January 9, 2019, with responses provided in an amendment. The final RFP is expected to be released in mid-January 2019.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Section_M__RFP_(FINAL).pdf | ||
| Section_C_SOW_RFP_(FINAL).pdf | ||
| Section_L_RFP_(FINAL).pdf | ||
| QAs_Final.pdf | ||
| SOW_CBO_Support_Draft_RFP_(Final).pdf | ||
| Section_L_-_Draft_RFP_(Final).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M - 1) EVALUATION FACTORS FOR AWARD (SERVICES)
PART A: GENERAL INFORMATION
1.0 GENERAL
The Government intends to evaluate each proposal and award an Indefinite delivery/indefinite quantity (IDIQ) contract resulting from this solicitation to a responsible Offeror whose proposal represents the best value after the trade-off evaluation, in accordance with the solicitation. "Best value" means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit(s) in response to the requirement. The Offeror is advised that the lowest priced proposal meeting the solicitation requirements may not be selected for an award if award to a higher priced Offeror is determined to be more beneficial to the Government. However, the perceived benefits of the higher priced proposal must merit the additional price.
2.0 EVALUATION PROCESS
For all Technical Factor(s), a combined Technical/Risk rating will be assigned. This method reflects whether the proposal meets or does not meet the minimum requirements along with an assessment of the strengths, weaknesses, significant weaknesses, and deficiencies of the proposal to determine the combined Technical/Risk rating. The benefit to the Government associated with assessed strengths along with technical risk will be considered in determining whether the Offeror’s proposal rises to a level of being thorough or exceptional.
Assessment of technical risk considers potential for disruption of schedule, increase in costs, degradation of performance, the need to increase Government oversight, or the likelihood of unsuccessful contract performance. Offerors are advised that during the evaluation process, a technical factor with an “Unacceptable” Technical/Risk Rating may result in the entire proposal being found unacceptable and eliminated from the competition.
Under Past Performance, the Government will evaluate recent performance to determine how well an Offeror has performed work similar to the work required by the solicitation. When proposals are received from joint ventures, specifically formed by the Offeror to propose on a particular acquisition, the past performance evaluation will consider each individual JV team member’s relevant past performance. After evaluating the Offeror’s past performance information, a Performance Confidence Assessment Rating will be assigned. More relevant past performance will typically be a stronger predictor of future success and have more influence on the Performance Confidence Assessment Rating than past performance of lesser relevance. In the case of an Offeror without a record of relevant past performance, the Offeror will receive a Performance Confidence Assessment Rating of “Unknown Confidence (Neutral)” which is considered a “Neutral” rating.
The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3.0 EVALUATION FACTORS FOR AWARD
Proposals will be evaluated using the factors listed below.
1) TECHNICAL
2) PAST PERFORMANCE
3) PRICE/COST
Evaluation factors are listed in descending order of importance.
Technical is significantly more important than past performance.
All evaluation factors other than price/cost, when combined, are significantly more important than price/cost.
Price/Cost is not the most important evaluation factor, but its degree of importance will increase commensurably with the degree of equality among different Offerors' non-cost factors.
The proposal must demonstrate to the Government’s satisfaction that the Offeror will provide a quality service that will ensure the successful accomplishment of the solicitation requirements and overall program objectives.
If deemed appropriate by the Government, proposal information provided for one factor may be used to assess other factors. In addition, the Offeror’s Technical proposal will be reviewed to determine if it is consistent with the Price/Cost proposal and reflects a clear understanding of the scope of work necessary to meet the solicitation requirements.
PART B: SPECIFIC INFORMATION
1.0 TECHNICAL
The evaluation will include an assessment of the following:
1.1 Management Plan
The Government will evaluate the Offeror’s proposed management plan based on the information required by Section L of this solicitation. The Government will evaluate for clarity, completeness, and realism of the information, and the extent to which the proposed processes and procedures will ensure successful accomplishment of the tasks described in the SOW.
1.2 Workforce
The Government will evaluate the quality of key personnel proposed. Key personnel will be evaluated on the extent to which they meet or exceed the corresponding labor category qualifications outlined in Section C. In addition, Key Personnel proposed to be utilized in the performance of this effort, whose labor qualifications exceed the minimum qualification requirements, may be considered a strength if the Government determines that the proposed qualification will be advantageous to the Government during contract performance.
2.0 PAST PERFORMANCE
There are three aspects to the past performance evaluation: recency, relevancy, and quality. The first aspect of past performance is the evaluation of the recency of the Offeror’s past performance. Past performance will be considered recent if the contract or order has been performed within three (3) years of the solicitation release date. Past Performance that does not meet this definition of recent will not be considered in the evaluation.
The second aspect of the past performance evaluation is the relevancy of the Past Performance reference when compared to the requirements of this solicitation. More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than most performance of lesser relevance.
The third aspect of the past performance evaluation is to evaluate the overall quality of the Offeror’s recent relevant, past performance. The Government will evaluate the Offeror, principal subcontractors’, and JV team members’ performance and focus its evaluation on the following areas: 1) meeting technical requirements, i.e., the quality of technical performance; 2) meeting schedule requirements, e.g., on time or late delivery; 3) controlling contract cost; 4) managing the contracted effort; 5) regulatory compliance, and 6) the demonstrated systemic improvement actions taken to resolve past problems. A separate quality rating will not be assigned, rather the past performance confidence assessment rating is based on the Offeror’s overall record of past performance taking into account the recency, relevancy, and quality of performance.
4.0 PRICE/COST
Cost Reimbursement CLINs:
Except for otherwise unacceptable proposals when awarding on initial proposals, the Government will perform a cost realism analysis to determine the most probable cost (MPC) for each applicable Offeror’s proposal. Cost realism analysis is the process of independently reviewing and evaluating specific elements of each Offeror’s proposed cost to determine whether the proposed cost is realistic for the work to be performed and is consistent with the unique methods of performance and materials described in the Offeror’s technical proposal. In conducting its cost realism evaluation, the Government may review the prospective Offeror’s proposed labor categories and compare the proposed rate to the average labor rate in industry or other similar rates within the same geographic zone where the work is to be performed. The Government may compare a proposed direct labor rate to the rates identified for the applicable Bureau of Labor Statistics Standard Occupational Classification (SOC) code, as referenced in Section C, Paragraph 3.4.1.4. Pertinent cost information, including but not limited to DCAA-recommended rates for such costs as direct labor, overhead, G&A, etc., as necessary and appropriate, will be used to arrive at the Government determination of the MPC for the performance of this contract. The MPC is an Offeror’s total cost, including fee, and any additional adjustments the Government has determined necessary to make the proposed cost realistic for all periods. The Government will use the results of its cost realism analysis to determine the MPC of performance for each Offeror. The MPC may differ from the proposed cost. The higher of the MPC or proposed cost will be used for purposes of evaluation to determine the best value.
Contract awarded value, however, will be based upon the successful Offeror’s proposed costs.
Unrealistically low costs or inconsistencies between the technical and cost proposals may be assessed as proposal risk and could be considered weaknesses under the technical factor. Therefore, any inconsistency, whether real or apparent, between the technical proposal and cost proposal should be explained in the narrative section of the cost/price proposal.
Total Professional Employee Compensation Plan: The Government will evaluate the Offeror’s Total Compensation Plan in accordance with FAR 52.222-46.
In accordance with FAR 15.404-1(b)(2), various price analysis techniques and procedures will be employed to ensure the prices being proposed for this requirement are fair and reasonable. To assist in the overall determination of price reasonableness, the Government will identify all instances where a proposed fully burdened labor cost exceeds $300,000 annually per employee. This also applies to a fully burdened subcontractor employee labor cost, inclusive of the prime contractor’s pass-through burden. An exceeded tripwire may ultimately be determined unreasonable absent justification.
Overall Summary Level for all CLINs
Normally, competition establishes price reasonableness. In limited situations, additional analysis will be required by the Government to determine reasonableness. If, after receipt of a proposal, the PCO determines that adequate price competition does not exist and a determination is made that none of the exceptions in FAR 15.403-1(b) apply, the Offeror may be required to provide certified cost and pricing data in accordance with FAR 15.403-4.
The contractor’s compliance to FAR Clauses 52.219-14 “Limitation on Subcontracting,” will be assessed as an element of responsibility. An Offeror’s proposal that fails to meet the limitation on subcontracting during each period of performance shall not be considered for award.
Prospective Offerors are forewarned that if there are discrepancies between Section B, Attachment (P6), and Volume 3 Narrative, Section B prevails.
5.0 EVALUATION OF OPTIONS
Clause 52.217-8, Option to Extend Services, is incorporated in the solicitation. Total evaluated cost/price will also include the six month performance period permitted under the clause, to account for a situation where invoking of the clause, in whole or part, becomes necessary. Specifically, the evaluated cost/price of this six-month period will be calculated by dividing the final year of the ordering period by 12 to establish an estimated monthly amount. The monthly amount will then be multiplied by six to establish the estimated cost for the six-month option to extend services.
PART C: EVALUATION RATING AND RISK ASSESSMENT DEFINITIONS
The definitions below will be used by the Government when assessing solicitation compliance and the expected results of the Offeror's proposed approach.
1.0 EVALUATION RATING AND RISK ASSESSMENT DEFINITIONS
The appropriate adjectival rating will be assigned to each factor and subfactor, as required. The Government will utilize a combined technical/risk rating for this effort.
2.0 TECHNICAL EVALUATION RATINGS
Combined Technical/Risk Ratings: The combined technical/risk assignments are provided in the table below.
COMBINED TECHNICAL/RISK RATING
Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
3.0 PAST PERFORMANCE RELEVANCY RATINGS
Past Performance Relevancy Ratings: More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.
Rating Definition
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
In regards to scope, the Government will take the following into consideration: Acquisition Management (SOW Paragraph 3.3.1), Acquisition Planning and Execution (SOW Paragraph 3.3.2), Acquisition Administration (SOW Paragraph 3.3.3). In regards to complexity, the government will take the following into consideration: services that support multiple customers simultaneously and ever changing priorities while ensuring task completion within required due dates.
4.0 PERFORMANCE CONFIDENCE ASSESSMENT RATINGS
The Government will employ the Past Performance Acceptable/Unacceptable Rating Method described in the table below. In the case of an Offeror without a record of recent relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance.
Therefore, the Offeror shall be determined to have unknown or neutral past performance. In the context of acceptable/unacceptable, a neutral rating shall be considered “acceptable.”
Performance Confidence Assessment Rating: Performance Confidence Assessment rating assignments reflect the Government’s confidence that the Offeror will successfully perform the solicitation’s requirements based on the Offeror’s recent and relevant past performance record.
Adjectival Rating
Description
Substantial Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence
Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
5.0 RESERVED
6.0 OTHER DEFINITIONS
Strengths: An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance. (FAR 15.001)
Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance. (FAR 15.001)
Deficiency: a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increase the risk of unsuccessful contract performance to an unacceptable level.
(FAR 15.001)
Recency: as it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.
Relevancy: as it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
Risk: as it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.
File details come from the government source that posted it. Updated .