Attachment_03_ElectronicTransferExpensesInstructions-Format.pdf

PDF 22 KB Posted

Attached to
4. 0 SBIR CSS
Solicitation number
N00421-19-R-0015
Issued by

About this file

This document contains instructions for electronically submitting contractor expense data related to a federal contract and a draft solicitation for Small Business Innovative Research Contractor Support Services.

The draft solicitation seeks proposals for a non-performance based services single award Indefinite Delivery, Indefinite Quantity contract to provide engineering and program management support services to Navy science and technology management organizations and Small Business Innovative Research and Small Business Technology Transfer programs offices. The support includes aligning science and technology investments with strategic needs, identifying technologies to pair with warfighter needs, advising on appropriate program funding, monitoring portfolio health, accelerating technology transitions, supporting SBIR/STTR programs, and supporting outreach, communications, training, administration and management activities. The period of performance consists of a five-year ordering period with task orders issued as required. The Naval Air Systems Command Naval Air Warfare Center is seeking industry feedback on the draft solicitation by May 16, 2019. Responses should include company information and point of contact.

The expense data submission instructions outline a standard format for electronically submitting contractor expense data in fixed-length records on a weekly basis, including categories such as labor hours, material costs and travel expenses. Data must be provided for both the reporting period and cumulative to date.

Attachment 03 ElectronicTransferExpensesInstructions-Format

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

Electronic Transfer of Contractor Expenses Instructions and Format

1.0 Instructions for the electronic submission of contractor expense data are as follows:

a. Submit only one line of current expenditures and one line of cumulative expenditures per record.

b. Maximum line length is 91 characters. Try to stay around 80.

c. Categories are separated by a space.

d. File must not contain page breaks or blank lines.

e. Each line of current expenditures must contain at least nine columns and each line of cumulative expenditures must contain nine columns. If there is no expenditure data for the first nine columns, zeros must be placed in those columns.

f. If no expenditures exist for the CLIN and category put a zero in the column.

g. Submit all add records for a reporting period at the beginning of the file. After the reporting period, you may submit changes and deletion entries. Specify the period for the entry you wish to change or delete.

h. Valid transaction codes: (A) for adding or changing a record and (D) is for deletion of a record.

Do not send a cumulative line when deleting a record.

i. All fields may be submitted to include up to the second decimal place.

1.1 The following information must be contained in each file and must be in the following order. There are some categories that are not used on all task orders but are required for others. You must report a zero for categories the task order or the contractor’s reporting system does not require. If no expenditures exist for a particular category, put a zero in the column for the current expenditures. Following are the headers and columns available to enter expenditures:

Contractor Status Report

Task Order Number:

Week Ending Date: MM/DD/YYYY

CODE, WBSN/TO_NO, CLIN, HOURS, LABOR$, HOURS_OT, LABOR$_OT,

MATERIAL, TRAVEL, OTHER, CUM_HOURS, CUM_LABOR$,

CUM_HOURS_OT, CUM_LABOR$_OT, CUM_MATERIAL, CUM_TRAVEL,

CUM_OTHER

a. The task order number needs to be specified only once for the reporting period.

b. The week ending date needs to be specified only once for a given period and will be applied to all entries following the date. Dates should reflect the following format: MM/DD/YYYY.

1.2 Descriptions of expenditure category (column) titles are as follows:

CODE - Transaction Code. Should be an (A) when expenses for the specified CLIN are for a new period ending date, or a (D) if the transaction is a deletion of a previously transmitted expense entry. This entry should be placed in the first position of the line.

WBSN/TO_NO - Work Breakdown Structure Number (WBSN). This entry may consist of up to17 characters. WBSN shall be in the following format:

05 = Last two digits of the Fiscal Year in which the task began (ex.

2005)

A = Task Order Option Year - an alphabetic indicator assigned to each option year (ex. A for Base Year, B for Option I, C for Option II, etc.). WBSN will correspond to the task order's deliverable CDRL for that option year.

5733/ = Task Order Number - last four digits of the task order number and a forward slash (/) at the end (ex. N00421-02-C-5733)

090-01 = WBSN - up to nine characters total (ex. 090, 090-01, 1111- A01)

Examples: 05A5733/090 05A5733/090-01 05A5733/1111-A01

- Task Order format shall be in accordance with the Government issued number shown on Block 2 of Form DD1155. Number format can be alphabetic, numeric, or alphanumeric.

CLIN - Task Order Line Item Number. This entry may consist of up to 6 characters

(ex. 0001, 0101, 0001aa, 0001ab).

HOURS - Total Workhours. Total labor hours expended for the reporting period to include subcontractor hours. Overtime hours worked may be included if other categories are not feasible to utilize with contractor’s reporting system.

LABOR$ - Labor Dollars. Total fully burdened labor dollars expended for the reporting period. May include overtime labor and subcontractor labor dollars, if other categories are not feasible to utilize with the contractor’s reporting system.

HOURS_OT - Overtime Hours. Total overtime labor hours expended for the reporting period, if the contractor’s reporting system provides this total separately from standard time workhours.

LABOR$_OT - Overtime Labor Dollars. Total fully burdened overtime labor dollars expended for the reporting period, if the contractor’s reporting system provides this total separately from standard labor dollars.

MATERIAL - Material Dollars. Total fully burdened material expenditures including outstanding commitments for the reporting period. This may include subcontractor material expenditures, if other categories are not feasible to utilize with the contractor’s reporting system.

TRAVEL - Travel Dollars. Total fully burdened travel expenditures including outstanding commitments for the reporting period. This may include subcontractor travel expenditures, if other categories are not feasible to utilize with the contractor’s reporting system.

OTHER - Other Dollars. All other miscellaneous expenses not applicable to the above categories broken down by CLIN (labor, travel, and material), if the contractor’s reporting system provides a category of cost other than those provided above.

CUM - Cumulative Hours or Cost. Indicates the cumulative total of the category.

1.3 The following reflects how each expenditure category is rolled together to show CLIN Level expenses:

a. HOURS + HOURS_OT = HOURS

b. LABOR$ + LABOR$_OT = LABOR

c. MATERIAL = MATERIAL

d. TRAVEL = TRAVEL

e. OTHER = OTHER

f. CUM_HOURS + CUM_HOURS_OT = CUM_HOURS

g. CUM_LABOR$ + CUM_LABOR$_OT = CUM_LABOR

h. CUM_MATERIAL = CUM_MATERIAL

i. CUM_TRAVEL = CUM_TRAVEL

j. CUM_OTHER = CUM_OTHER

File details come from the government source that posted it. Updated .