This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide High Endurance Electronic Warfare Jet (HEEWJ) Capabilities Services. The Navy seeks to acquire contractor-owned and operated HEEWJ aircraft to train shipboard and aircraft squadrons to counter threats in the Electronic Warfare environment. The contract is anticipated to be a four-year, firm fixed price contract awarded to a single contractor. The QASP establishes procedures for government surveillance to ensure contract standards are met. It defines roles for the Program Manager, Contracting Officer, Contracting Officer's Representative, and Government Flight Representative in monitoring contractor performance. Performance will be measured against standards for mission and data delivery in enclosures to the QASP. The Contractor Performance Assessment Reporting System will be used to annually evaluate contractor performance, which can impact future contract awards.
Attachment 3
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-18-R-0009
Attachment 3
20 March 2019
Quality Assurance Surveillance Plan (QASP)
For High Endurance Electronic Warfare Jet (HEEWJ) Capabilities Services
1. Purpose
This Quality Assurance Surveillance Plan is a government developed and applied document used to determine if the contractor’s performance meets the performance standards contained in the contract. This QASP establishes procedures on how to conduct assessments/inspections and provides a detailed process for continuous oversight.
The contractor is responsible for implementing and delivering performance that meets contract requirements. This QASP provides the structure for the government surveillance of the contractor’s performance to ensure High Endurance Electronic Warfare Jet HEEWJ contract standards are consistently achieved.
The contract required, in support of the Contracted Air Services (CAS) Program Office (PMA-
226), is to acquire the services of Contractor Owned Contractor Operated (COCO) HEEWJ aircraft to train shipboard and aircraft squadrons how to counter threats in the Electronic Warfare
(EW) environment.
The resultant contract is anticipated to be a performance-based Firm Fixed Price (FFP) contract.
This contract will have one, four-year 364-day ordering period. A properly executed and administered QASP will ensure early identification and resolution of performance issues to minimize impact on mission performance.
This QASP is a living document. Flexibility is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
2. Authority
Authority for issuance of this QASP is provided under Section E, (Part 46 of the Federal
Acquisition Regulation for Inspection of Services clauses) which provides for inspection, acceptance and documentation of the service called for in the contract or order to be executed by the contracting officer or a duly authorized representative.
3. Scope
To understand fully the roles and responsibilities of the parties, it is important to first define the distinction in terminology between the QASP and the contractors Quality system/manual. The
Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract in accordance with the CFR Title
14, Aeronautics and Space (14 CFR)
The QASP on the other hand, is in place to provide Government surveillance and oversight of the
Contractor's efforts to assure that they are timely, effective, and are delivering the results specified in the contract.
4. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
20 March 2019
Program/Project Manager (PM) – The PM provides primary program oversight, nominates the
COR, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities. While the PM may serve as a direct conduit to provide
Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf. The Integrated Product Team Lead (IPTL) CAS Deputy Program Manager (DPM) executes the program as the PM’s primary representative. The PM for this contract is PMA-226.
Assigned PM: CAPT Andrew Lynch, PMA226
Telephone: 252-466-3660
Email: andrew.lynch@navy.mil
Principle Deputy PM: Andy Wilkinson
Telephone: 252-466-6436
Email: edward.a.wilkinson@navy.mil
IPTL (CAS DPM): Brian Alexander
Telephone: 252-466-5368
Email: brian.t.alexander@navy.mil
Procuring Contracting Officer (PCO) – The PCO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The PCO is duly appointed with the authority to enter into or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The ACO will be designated in the resulting contract award. The PCO is designated via a written warrant, which sets forth limitations of authority. The PCO determines the final assessment of the contractor’s performance.
Assigned PCO: Michael Coon
Organization or Agency: AIR 2.5.1.13
Telephone: 301-757-7114
Email: michael.coon@navy.mil
Contracting Officer’s Representative (COR) - The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the PCO. The COR is required to provide an annual performance assessment to the PCO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor's performance.
Government Flight Representative (GFR) – the GFR is a US Military officer or similarly qualified civilian with the responsibility for oversight of public aircraft operations conducted by commercial Contractors.
20 March 2019
Other Key Government Personnel (May add GFR & SO)
This may include performance monitors, inspectors, technical experts, or others who provide information that helps the COR monitor contractor performance.
Contractor Representatives
The following employees of the contractor serve as the contractor’s Program Manager and Task
Manager for this contract. (To be completed after the contract award)
Program Manager - (TBD)
Telephone: (TBD)
Email: (TBD)
Task Manager – (TBD)
Contract Representative (CR): (TBD)
5. Performance Requirements and Method of Surveillance
5.1. Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance.
Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist provided as Enclosure
(4) herein.
Enclosure (1) sets forth the HEEWJ Services Mission Performance Standards and Enclosure (2) provides the CDRL Data Performance Standards, Corrective Action Reporting, Enclosure (3) shall be used for the Contractor and COR for documenting all corrective actions. Enclosure (4) provides the Surveillance Activity Checklist, a means for the COR to document on a monthly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.
5.2. Performance Standards
The Services Mission Performance Standards, Enclosure 1, is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
20 March 2019
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance.
The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance
Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.
5.3. Contractor Performance Rating Definitions
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating
Criteria
Excellent /
Outstanding
Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the government benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
6. Performance Reporting
6.1. Contractor Performance Assessment Reporting System (CPARS)
CPARS reports will impact the determination to issue task orders under this contract and will impact the contractor's ability to compete on future DoD contracts. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract.
Additionally, an evaluation using the CPARS format will be performed annually. This evaluation will be one determinant in the continuation of issuing task orders under this contract. The
Government will address the quality of product or service, schedule, cost control, management, and other areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
6.2. Corrective Action Report (CAR)
The CAR, Enclosure (3) is a surveillance and communication tool that provides a format for the
Contractor to detail the corrective action of a cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence.
7. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government's performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the
Contracting Officer at termination or completion of each task order.
8. Enclosures
Enclosure (1) –HEEWJ Services Mission Performance Standards
Enclosure (2) –CDRL Data Performance Standards
Enclosure (3) –Corrective Action Report
Enclosure (4) – HEEWJ Surveillance Activity Checklist mishaps
2. Non-compliance with hazmat policy.
Contractor goal is 100% compliance with a Satisfactory metric of 98%
100% = Exceptional
99% = Very Good
98% = Satisfactory
97% = Marginal
<97% = Unsatisfactory the CPARS cycle...then divide that number by total number of days in the CPARS cycle to derive percentage (360/365 =
98.6%).
4.2.5, 4.2.5.1, 4.2.5.2, 10.1.4
Fuel Accountability
Compliance:
Provide Fuel Chits, which track all fuel consumption and provide fuel receipts, flight logs, and Fuel
Reports to the
Government
Metric 4
Contractor shall maintain 95% accurate fuel consumption tracking between fuel cards, fuel receipts, flight logs, and fuel receipts, with a goal of
100% accurate tracking.
100% = Exceptional
97% = Very Good
95% = Satisfactory
90% = Marginal
<90% = Unsatisfactory
98% Inspection by COR and customer feedback.
Example:
Provide evidence that the fuel card charge receipts match with flight log and fuel receipts. Take total fuel transactions (receipt amounts and gallons dispensed) and compare/match aggregate cost, gallons, fuel log, and flight log information.
Perform sample audit each month of transaction IAW
MIL-STD-105D using normal, single sample plan using Acceptable Quality
Level (AQL) 0.4 or 4%. Use table I General Inspection
Level II for sample size determination. Use table II-A for sample plan. Aggregate 12 months of audits into % compliance. Take each months results (pass/fail)
12/12=100% compliance.
Monthly
20 March 2019
GFP
9.3 CDRL A007
Develop, implement, and maintain an OPSEC program
IAW PWS
Submission is in accordance with DI-MGMT-81999, cited in the CDRL A008
National Security Decision
Directive 298
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by
COR and/or technical points of contacts as indicated on CDRL
As delivered per the
DD Form 1423.
20 March 2019
Enclosure 3: CAR
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
Enclosure 4: Monthly Surveillance Format Used:
The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Management
Responsiveness, Utilization of Small Business, and Other Areas as applicable utilizing the
CPARS evaluation rating definitions listed in Enclosure (2).
Description Surveillance
Method/Measure
Date
Planned
Date Completed Quality
Metric =
Schedule
Metric =
Cost
Control Metric =
CPARS
Mgmt.
Metric
= CPARS
Utilization of
Small Business (yes/no)
Other
Areas
As described above in
Enclosure 1
100% Inspection by COR and customer feedback
TBD
100% Inspection by COR and customer feedback