This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity notice. The CDRL outlines requirements for a Management Plan data item to support the High Endurance Electronic Warfare Jet (HEEWJ) Capabilities contract. Key deliverables and dates specified in the CDRL include an initial Management Plan submission within 30 days of contract award, with revisions required as outlined. Distribution of the plan is limited to the Department of Defense and its contractors.

The related federal contract opportunity seeks proposals for CAS involving airborne threat simulations to train Navy and joint forces. The single-award IDIQ contract will be awarded on a full and open basis. The NAICS code is 481219 and PSC is V121. Offerors have until May 28, 2019 to submit proposals in response to solicitation N00421-18-R-0009 for HEEWJ Capabilities support from a contractor-owned and operated aircraft. Performance will take place across multiple CONUS sites and OCONUS locations.

A003 MGMT Plan

View the file

Other files

File Type Posted
HEEWJ_Amendment_4_1-July-2019_Conform_Copy.pdf PDF
Heewj_Amendment_4_1-July-2019_Modification.pdf PDF
HEEWJ_RFP_Amendment_3_18-June-2019_(Modification_Copy).pdf PDF
Att_L-2_Vol_2_CE_Tables_REV1.xlsx XLSX spreadsheet
HEEWJ_RFP_Amendment_3_18-June-2019_(Conform_Copy).pdf PDF
Att_L-5_Vol_4__PP-1_PP_Cont_Data_REV1.xlsx XLSX spreadsheet
HEEWJ_RFP_Amendment_-2_Conform_Document.pdf PDF
HEEWJ_Amendment-2_Modification_Document.pdf PDF
HEEWJ_Amended_RFP.pdf PDF
HEEWJ_Modification_of_Sections_C_and_L.pdf PDF
N00421-18-R-0009_Q&A_after_final_RFP.pdf PDF
N00421-18-R-0009_amended_Att_L-4_Vol_4_HEEWJ_PPQ.docx DOCX document
Att_L-6_Historical_Travel_Information.pdf PDF
Att_L-3_Vol_3_T-1_CRM.xlsx XLSX spreadsheet
A005_HEEWJ_Airworthiness.pdf PDF
A001_HEEWJ_DI-MGMT-81904_CMSR.pdf PDF
Att_L-2_Vol_2_CE_Tables.xlsx XLSX spreadsheet
Attachment_1_-_DD254_DRAFT.pdf PDF
A002_HEEWJ__DI-ADMN-81505_Presentation_Meeting_Minutes.PDF PDF
Att_L-4_Vol_4_HEEWJ_PPQ.docx DOCX document
A006_HEEWJ_GFP_Inventory_Report.pdf PDF
A003_HEEWJ_DI-MGMT-80004A_Management_Plan.pdf PDF
A007_HEEWJ_OPSEC.pdf PDF
A001_HEEWJ_CMSR.pdf PDF
A002_HEEWJ_Report_Record_of_Meeting_Minutes.pdf PDF
Att_L-5_Vol_4__PP-1_PP_Cont_Data.xlsx XLSX spreadsheet
A005_HEEWJ__DI-SAFT-81905A__Air_Worthiness.pdf PDF
Attachment_3_QASP.pdf PDF
A004_HEEWJ_Fuel_Chit.pdf PDF
A006_HEEWJ_DI-MGMT-80441C_Govt_Property.pdf PDF
A007_HEEWJ_OPSEC_DI-MGMT-81999.pdf PDF
N00421-18-R-0009.pdf PDF
A004_HEEWJ_DI-MISC-81461_Fuel_Chit.pdf PDF
Att_L-1_Vol_1_ES_Tables.xlsx XLSX spreadsheet
Attachment_4_-_GFP.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A003
title: Management Plan
sub: Management Plan
auth: DI-MGMT-80004A (See Block 16)
ref: See Block 16
req_ofc: PMA-226
dd250: SS
appcode: AD
dist: D (Block 16)
freq: ONE/R
asof: N/A
firstsub: 30DAC
subsub: Block 16
addressee1: PMA-226
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2: 1
repro2:
addressee3: (See Block 16)
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: Block 4: Contractor format is acceptable and shall be complied with in it's entirety except as outlined below:

Para 3.2 shall also include the following:

Para 3.2 c. Configuration Controls shall include a plan for parts lifecycle management.

Para 3.2 i Testing and test report to validate platform performance with required equipment outlined in the PBWS.

Para 3.2 m. "other" is defined as maintenance documentation to include an Aircraft Pedigree report, maintenance history reporting and a parts status report identifying OEM defined life limits.

Para 3.5 - As part of the technical approach DID Paragraph 3.5 shall include the stand up capability approach, including a detailed IMS, through platform operational validation, Airworthiness certification and IFC.

Para 3.6 - Not Required Para 3.7 a. and b. - Not Required Block 5: PWS Paragraphs: 4.1.6, 4.2.4, 5.3.5 Block 7: DD250 Inspection and approval is required at the Source Block 8: The Government shall have 15 days for review and acceptance/rejection of all plans, schedules and test reports. Contractor has 10 working days to resubmit deliverable for acceptance with comments or rejection.

Block 9: Distribution authorized to DOD and U.S. DOD Contractors only for administrative and operational use. Other requests for this document shall be referred to PMA-226.

Block 10: Frequency initially with revisions as required, IAW PBWS.

The test report is required to achieve IOC and updated as needed to achieve FOC.

Block 12: First Submission to be delivered 30 days after contract award. The Contractor shall submit a revision if any planned milestones or contract obligation will be delayed more than 30 days or as required to update information.

Block 14: All unclassified digital media shall be in Microsoft Office 2016 to:

1. PMA-226@navy.mil

2. Contracting Officer's Representative (COR) wendy.mcgrath@navy.mil

group:
total_price:
prep_name: Wendy D. McGrath
line_item: 0011
exhibit: A
xtdp: Off
xtm: Off
othercat: PJM
system: CAS HEEWJ
ctr_no: N00421-18-R-0009
contr: TBD
remarksb:
Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .