Exhibit_5-Contract_Data_Requirements_Lists_(CDRLs)_A0001-A0010.xls

XLS spreadsheet 238 KB Posted

Attached to
Video Teleconferencing (VTC) Hardware and Ancillary Equipment
Solicitation number
N00421-17-R-0010
Issued by

About this file

Exhibit 5-Contract Data Requirements Lists (CDRLs) A0001-A0010

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A001-Label

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001Labeling/ Equipment ID Report
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS: 2.2, 2.2.1, 2.2.27.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NSee Block 16See block 16b. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/Aa. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
ACOR01
Frequency: Report to be delivered with each order.TPOC01
Provide report detailing Labeling/ Equipment ID and Wiring on Delivery and/or Installation of Equipment/ Wiring per PWS section 2.2.ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 12 of 16
1059/183S/N 0102-LF-010-5600

A002-STIG

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A002STIG Compliance and Mitigation Report
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS: 2.4.1, 2.4.2, 2.4.3, 3.87.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NASREQ, See Blk 16ASREQb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/Aa. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
ACOR01
Frequency: Required within 15 after installation of VTC equipment or infrastructure.TPOC01
Provides STIG compliance and Mitigation documentation following Installation or Changes of Equipment/ Wiring per PWS section 2.4.1, 2.4.2, 2.4.3, and 3.8ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 12 of 16
1059/183S/N 0102-LF-010-5600

A003-NewTech

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A003New Technology Substitutions
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS: 2.5.1 thru 2.5.87.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NASREQASREQb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/Aa. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
ACOR01
TPOC01
Report shall provide information detailing the proposed equipment meets requirements of New Technology Substitutions per PWS section 2.5.1 thru 2.5.8ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 12 of 16
1059/183S/N 0102-LF-010-5600

A004-MnthlyStats

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A004Monthly Status Report
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Government provided formatPWS 2.6.27.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NMNTHLY45DACAb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/ANLT5th Business Daya. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
ACOR01
Delivery metrics per PWS section 2.6.2TPOC01
ATPOC01
Delivery shall be provided electronically in an excel format approved by the Government.
Block 13: NLT the 15th of each month.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 2 of 16
1059/183S/N 0102-LF-010-5600

A005-PrePostInstall

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A005Pre/Post Installation Requirements Report
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS 3.2.1 thru 3.2.8, 3.4.1 thru 3.4.3, 3.7.1 thru 3.7.37.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NASREQASREQb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/Aa. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
Pre/Post Installation Requirements, Function/Technical Design, and Architecture Documentation as described in PWS section 3.2.1 thru 3.2.8, 3.4.1 thru 3.4.3, 3.7.1 thru 3.7.3. Should be provided within 15 business days of award of each delivery orderACOR01
TPOC01
ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 6 of 16
1059/183S/N 0102-LF-010-5600

A006-UserTrainGuide

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A006User Training & Guide
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS: 3.5.1, 3.5.1.17.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NASREQASREQb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/Aa. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
TPOC01
Provides User Training per PWS section 3.5.1 and 3.5.1.1 and User Guide. The User Guide shall at a minimum include a description of the basic functions of the VTC and the control system interface if applicable as well as pictures and diagrams describing their use. A one-page tri- fold with "Quick Start" instructions shall be included.
Two printed bound copies of user guides and one editable electronic version of the user guide.Upon request provide TPOC documentation and training material in accessible formats; i.e., special electronic version and/or large print. Data shall be provided in Microsoft Word or approved format.ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL03
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 12 of 16
1059/183S/N 0102-LF-010-5600

A007-Install

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
TBDATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A007Levels of Service Installation/Integration
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS: 3.8.17.2 IT/IM Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NASREQASREQb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/Aa. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
ACOR01
TPOC01
Shall be completed within 15 business days upon contract award for new projects. Shall be updated to reflect changes in customer requirements and technologies as necessary. Per PWS section 3.8.1 and subsections of 3.8.1ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 14 of 16
1059/183S/N 0102-LF-010-5600

A008-AfterActionRpt

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A008After Action Report- Maintenance
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS 4.07.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NMTHLY45DACAb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/ANLT5th Business Daya. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
Submissions shall include a narrative of the system analysis and diagnosis

and steps required to correct the failure/issue.Should provide an aggregated list of changes by date, including an associated list of

equipment (make/model/serial number) affected by Location then by SiteID. Per PWS Section 4.0 and all subsections under 4.0.TPOC01
ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL03
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 6 of 16
1059/183S/N 0102-LF-010-5600

A009-TP PM

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
0004, 1004, 2004, 3004, 4004ATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A009Touch Panel Preventative Maintenance Checklist
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
PWS 4.5.37.2 IT/IM Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NANNUAL60 DACAb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/AANNUAL NLT FEBRUARY 28a. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
ACOR01
TPOC01
Contractor format report to be used to verify and validate proper touch panel system operations. To also include other activities as required by the Government such as upgrades, patches etc. Shall be complete for each locally administered system, annually.ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 13 of 16
1059/183S/N 0102-LF-010-5600

A010-OEM SW UPG

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
xxxxATDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
7.2 IT Support ServicesTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A010OEM Software Upgrades
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatPWS: 4.77.2 IT/CS Dept
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NASREQASREQb. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
N/Aa. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
ACOR01
TPOC01
Provides OEM Software Upgrades per PWS Section 4.7ATPOC01
Contractor format is acceptable upon Government approval.
Delivery shall be provided electronically in a format approved by the Government.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL04
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Melissa Harclerode26-Oct-2016Melissa Harclerode26-Oct-16
DD Form 1423-2, JUN 90Previous editions are obsoletePage 12 of 16
1059/183S/N 0102-LF-010-5600

A017

CONTRACT DATA REQUIREMENTS LISTForm Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the
Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of
these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
TDP_____ TM_____ OTHER_x_ FNCL_______________
D. SYSTEM / ITEME. CONTRACT / PR NO.F. CONTRACTOR
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A017Incurred Cost and Progress Reporting for ServicesInvoice Support Report
4. AUTHORITY (Data Acquisition Doc. No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
5252.232-9529 and SOW Par 5.6
7. DD250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
See BLK 16See BLK 16b. COPIES
8. APP CODEE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONFinal
See BLK 16See BLK 16a. ADDRESSEEDraftRegRepro
16. REMARKSCOR01
PCO01
Block 4 - Tailored Content Requirements
(DID requirements Paragraph 1(.Reports shall be submitted electronically. Data Tables shall be consistent with contract atatchment 5 and submitted in MS Excel format.
(DID Requirements Paragraph 3): This report content shall be in accordance with the references included in Block 5.
Block 9 - Disriubtion authorized to DoD components only; contractor proprietary information included.
Blcoks 10, 12, and 13 - At a minimum, submit jointly with the invoice.
* The Office of the COR is NOT to receive any CLASSIFIED material. **15. TOTAL02
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
Kevin Smith13-Nov-2012Melissa Furbee
DD Form 1423-2, JUN 90Previous editions are obsoletePage 16 of 16
1059/183S/N 0102-LF-010-5600

File details come from the government source that posted it. Updated .