Exhibit_5-Contract_Data_Requirements_Lists_(CDRLs)_A0001-A0010.xls
XLS spreadsheet 238 KB Posted
- Solicitation number
- N00421-17-R-0010
About this file
Exhibit 5-Contract Data Requirements Lists (CDRLs) A0001-A0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redacted_J&A_N00421-17-R-0010.pdf | ||
| N00421-17-R-0010_VTC_RFP_Amendment_4.docx | DOCX document | |
| Attachment_1-Pricing_Tables_1-3_updated_02-16-2017.xls | XLS spreadsheet | |
| N00421-17-R-0010_VTC_RFP_revised_02-08-2017.docx | DOCX document | |
| Attachment_1-Pricing_Tables_1-3_updated_02-08-2017.xls | XLS spreadsheet | |
| Attachment_1-Pricing_Tables_1-3_updated.xls | XLS spreadsheet | |
| N00421-17-R-0010_VTC_Solicitation-Amendment_2.docx | DOCX document | |
| Attachment_1-Pricing_Tables_1-3_updated.xls | XLS spreadsheet | |
| N00421-17-R-0010_VTC_Solicitation-Amendment_1.docx | DOCX document | |
| Attachment_2-DoD_Contract_Security_Classification_Specification-DD_254.pdf | ||
| Attachment_1-Pricing_Tables_1-3.xls | XLS spreadsheet | |
| Attachment_4-DataItem_Transmittal_Acceptance_Rejection_Form.doc | DOC document | |
| Attachment_3-Material_Inspection_and_Receiving_Report.pdf | ||
| N00421-17-R-0010_VTC_RFP.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A001-Label
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A001 | Labeling/ Equipment ID Report | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| Contractor Format | PWS: 2.2, 2.2.1, 2.2.2 | 7.2 IT/CS Dept | ||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | See Block 16 | See block 16 | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | a. ADDRESSEE | Draft | Reg | Repro | ||||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| ACOR | 0 | 1 | ||||||||||
| Frequency: Report to be delivered with each order. | TPOC | 0 | 1 | |||||||||
| Provide report detailing Labeling/ Equipment ID and Wiring on Delivery and/or Installation of Equipment/ Wiring per PWS section 2.2. | ATPOC | 0 | 1 | |||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 12 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A002-STIG
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A002 | STIG Compliance and Mitigation Report | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| Contractor Format | PWS: 2.4.1, 2.4.2, 2.4.3, 3.8 | 7.2 IT/CS Dept | ||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | ASREQ, See Blk 16 | ASREQ | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | a. ADDRESSEE | Draft | Reg | Repro | ||||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| ACOR | 0 | 1 | ||||||||||
| Frequency: Required within 15 after installation of VTC equipment or infrastructure. | TPOC | 0 | 1 | |||||||||
| Provides STIG compliance and Mitigation documentation following Installation or Changes of Equipment/ Wiring per PWS section 2.4.1, 2.4.2, 2.4.3, and 3.8 | ATPOC | 0 | 1 | |||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 12 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A003-NewTech
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A003 | New Technology Substitutions | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| Contractor Format | PWS: 2.5.1 thru 2.5.8 | 7.2 IT/CS Dept | ||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | ASREQ | ASREQ | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | a. ADDRESSEE | Draft | Reg | Repro | ||||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| ACOR | 0 | 1 | ||||||||||
| TPOC | 0 | 1 | ||||||||||
| Report shall provide information detailing the proposed equipment meets requirements of New Technology Substitutions per PWS section 2.5.1 thru 2.5.8 | ATPOC | 0 | 1 | |||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 12 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A004-MnthlyStats
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A004 | Monthly Status Report | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| Government provided format | PWS 2.6.2 | 7.2 IT/CS Dept | ||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | MNTHLY | 45DACA | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | NLT5th Business Day | a. ADDRESSEE | Draft | Reg | Repro | |||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| ACOR | 0 | 1 | ||||||||||
| Delivery metrics per PWS section 2.6.2 | TPOC | 0 | 1 | |||||||||
| ATPOC | 0 | 1 | ||||||||||
| Delivery shall be provided electronically in an excel format approved by the Government. | ||||||||||||
| Block 13: NLT the 15th of each month. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 2 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A005-PrePostInstall
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A005 | Pre/Post Installation Requirements Report | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| Contractor Format | PWS 3.2.1 thru 3.2.8, 3.4.1 thru 3.4.3, 3.7.1 thru 3.7.3 | 7.2 IT/CS Dept | ||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | ASREQ | ASREQ | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | a. ADDRESSEE | Draft | Reg | Repro | ||||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| Pre/Post Installation Requirements, Function/Technical Design, and Architecture Documentation as described in PWS section 3.2.1 thru 3.2.8, 3.4.1 thru 3.4.3, 3.7.1 thru 3.7.3. Should be provided within 15 business days of award of each delivery order | ACOR | 0 | 1 | |||||||||
| TPOC | 0 | 1 | ||||||||||
| ATPOC | 0 | 1 | ||||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 6 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A006-UserTrainGuide
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||||||||||||
| OMB No. 0704-0188 | |||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | |||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | |||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | |||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | |||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | |||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |||||||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | |||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | |||||||||||
| 7.2 IT Support Services | TBD | TBD | |||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | |||||||||||
| A006 | User Training & Guide | ||||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||||||
| Contractor Format | PWS: 3.5.1, 3.5.1.1 | 7.2 IT/CS Dept | |||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||||||
| N | ASREQ | ASREQ | b. COPIES | ||||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | |||||||||
| N/A | a. ADDRESSEE | Draft | Reg | Repro | |||||||||
| 16. REMARKS | COR | 0 | 1 | ||||||||||
| TPOC | 0 | 1 | |||||||||||
| Provides User Training per PWS section 3.5.1 and 3.5.1.1 and User Guide. The User Guide shall at a minimum include a description of the basic functions of the VTC and the control system interface if applicable as well as pictures and diagrams describing their use. A one-page tri- fold with "Quick Start" instructions shall be included. | |||||||||||||
| Two printed bound copies of user guides and one editable electronic version of the user guide.Upon request provide TPOC documentation and training material in accessible formats; i.e., special electronic version and/or large print. Data shall be provided in Microsoft Word or approved format. | ATPOC | 0 | 1 | ||||||||||
| Contractor format is acceptable upon Government approval. | |||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | |||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 3 | ||||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | ||||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 12 of 16 | |||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A007-Install
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| TBD | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A007 | Levels of Service Installation/Integration | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| Contractor Format | PWS: 3.8.1 | 7.2 IT/IM Dept | ||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | ASREQ | ASREQ | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | a. ADDRESSEE | Draft | Reg | Repro | ||||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| ACOR | 0 | 1 | ||||||||||
| TPOC | 0 | 1 | ||||||||||
| Shall be completed within 15 business days upon contract award for new projects. Shall be updated to reflect changes in customer requirements and technologies as necessary. Per PWS section 3.8.1 and subsections of 3.8.1 | ATPOC | 0 | 1 | |||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 14 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A008-AfterActionRpt
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||||||||
| OMB No. 0704-0188 | |||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | |||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | |||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | |||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | |||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | |||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | |||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | |||||||
| 7.2 IT Support Services | TBD | TBD | |||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | |||||||
| A008 | After Action Report- Maintenance | ||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| Contractor Format | PWS 4.0 | 7.2 IT/CS Dept | |||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| N | MTHLY | 45DACA | b. COPIES | ||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | |||||
| N/A | NLT5th Business Day | a. ADDRESSEE | Draft | Reg | Repro | ||||
| 16. REMARKS | COR | 0 | 1 | ||||||
| Submissions shall include a narrative of the system analysis and diagnosis |
and steps required to correct the failure/issue.Should provide an aggregated list of changes by date, including an associated list of
| equipment (make/model/serial number) affected by Location then by SiteID. Per PWS Section 4.0 and all subsections under 4.0. | TPOC | 0 | 1 | |||||||
| ATPOC | 0 | 1 | ||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 3 | |||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 6 of 16 | ||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A009-TP PM
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| 0004, 1004, 2004, 3004, 4004 | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A009 | Touch Panel Preventative Maintenance Checklist | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| PWS 4.5.3 | 7.2 IT/IM Dept | |||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | ANNUAL | 60 DACA | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | ANNUAL NLT FEBRUARY 28 | a. ADDRESSEE | Draft | Reg | Repro | |||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| ACOR | 0 | 1 | ||||||||||
| TPOC | 0 | 1 | ||||||||||
| Contractor format report to be used to verify and validate proper touch panel system operations. To also include other activities as required by the Government such as upgrades, patches etc. Shall be complete for each locally administered system, annually. | ATPOC | 0 | 1 | |||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 13 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A010-OEM SW UPG
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| xxxx | A | TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 7.2 IT Support Services | TBD | TBD | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A010 | OEM Software Upgrades | |||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| Contractor Format | PWS: 4.7 | 7.2 IT/CS Dept | ||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| N | ASREQ | ASREQ | b. COPIES | |||||||||
| 8. APP CODE | D | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| N/A | a. ADDRESSEE | Draft | Reg | Repro | ||||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| ACOR | 0 | 1 | ||||||||||
| TPOC | 0 | 1 | ||||||||||
| Provides OEM Software Upgrades per PWS Section 4.7 | ATPOC | 0 | 1 | |||||||||
| Contractor format is acceptable upon Government approval. | ||||||||||||
| Delivery shall be provided electronically in a format approved by the Government. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 4 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Melissa Harclerode | 26-Oct-2016 | Melissa Harclerode | 26-Oct-16 | |||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 12 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
A017
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | |||||||||||
| OMB No. 0704-0188 | ||||||||||||
| Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching | ||||||||||||
| existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this | ||||||||||||
| burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington | ||||||||||||
| Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the | ||||||||||||
| Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of | ||||||||||||
| these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | ||||||||||||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | ||||||||||
| TDP_____ TM_____ OTHER_x_ FNCL_______________ | ||||||||||||
| D. SYSTEM / ITEM | E. CONTRACT / PR NO. | F. CONTRACTOR | ||||||||||
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE | ||||||||||
| A017 | Incurred Cost and Progress Reporting for Services | Invoice Support Report | ||||||||||
| 4. AUTHORITY (Data Acquisition Doc. No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | ||||||||||
| 5252.232-9529 and SOW Par 5.6 | ||||||||||||
| 7. DD250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | ||||||||
| See BLK 16 | See BLK 16 | b. COPIES | ||||||||||
| 8. APP CODE | E | 11. AS OF DATE | 13. DATE OF SUBSEQUENT SUBMISSION | Final | ||||||||
| See BLK 16 | See BLK 16 | a. ADDRESSEE | Draft | Reg | Repro | |||||||
| 16. REMARKS | COR | 0 | 1 | |||||||||
| PCO | 0 | 1 | ||||||||||
| Block 4 - Tailored Content Requirements | ||||||||||||
| (DID requirements Paragraph 1(.Reports shall be submitted electronically. Data Tables shall be consistent with contract atatchment 5 and submitted in MS Excel format. | ||||||||||||
| (DID Requirements Paragraph 3): This report content shall be in accordance with the references included in Block 5. | ||||||||||||
| Block 9 - Disriubtion authorized to DoD components only; contractor proprietary information included. | ||||||||||||
| Blcoks 10, 12, and 13 - At a minimum, submit jointly with the invoice. | ||||||||||||
| * The Office of the COR is NOT to receive any CLASSIFIED material. ** | 15. TOTAL | 0 | 2 | |||||||||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | |||||||||
| Kevin Smith | 13-Nov-2012 | Melissa Furbee | ||||||||||
| DD Form 1423-2, JUN 90 | Previous editions are obsolete | Page 16 of 16 | ||||||||||
| 1059/183 | S/N 0102-LF-010-5600 |
File details come from the government source that posted it. Updated .