Att_P3_Fully_Burdened_Rates.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
AIR-4. 11 Special Communications Rapid Integration Facility (SCRIF)
Solicitation number
N00421-17-R-0004
Issued by

About this file

Attachment P3 - Fully Burdened Rates

View the file

Other files

File Type Posted
N00421-17-R-0004_SCRIF_Amendment_0001.pdf PDF
Att_P1_-_Past_Performance.pdf PDF
Att_6_-_ACOR_Desig_Ltr.docx DOCX document
Att_8_-_Authorized_Key_Personnel.doc DOC document
Att_2_-_Non-Navy_IT_Compliance_Form.doc DOC document
Att_3_-_OCI_List.docx DOCX document
Att_9_-_Data_Item_Transmittal_Form.docx DOCX document
Att_7_-_Wage_Determinations.docx DOCX document
Ex_A_-_CDRLS.pdf PDF
Att_P5_-_Reserved.docx DOCX document
Att_4_-_Authorized_Subcontractors.docx DOCX document
Att_1_-_DD254_BID_Signed.pdf PDF
Att_5_-_COR_Desig_Ltr.docx DOCX document
Att_P9_-_Sample_Task_2_Drawing.pdf PDF
Att_12_-_Financial_Progress_Report.docx DOCX document
Att_P2_-_Contractor_Performance.pdf PDF
Att_11_-_Small_Business_Subcontracting_Plan.docx DOCX document
N00421-17-R-0004_SCRIF_RFP.docx DOCX document
Att_13_-_Electronic_Transfer_of_Contractor_Exp.doc DOC document
Att_P8_-_Sample_Task_1_Drawing_2.pdf PDF
Att_15_-_SCMS_RDT&E_LAN_SOP.docx DOCX document
Att_P7_-_Sample_Task_1_Drawing_1.pdf PDF
Att_10_-_QASP-CSP.doc DOC document
Att_P4_-_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Att_14_-_Option_Closeout.doc DOC document
Att_P6_-_Prime_and_Sub_Cost_Summary_Sheet.xls XLS spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Instructions to Prime Contractors for completing Attachment P3 Annual Fully Burdened Labor

RFP # N00421-17-R-0004

COLUMN/AREACOLUMN HEADINGDESCRIPTION OF DATA UNDER THIS COLUMN HEADING
AOfferor NameEnter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies
CProposed Labor Category (Furnished by Government)Enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA".
DIndividual Designator*For each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number as found on Attachment XX.
E-IProposed Annual Fully-Burdened Labor per Labor Catergory, per Labor Individual DesignatorEnter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period.

Prime Burdened Labor Rates

Offeror NameATTACHMENT P3Individual Designator*Proposed Annual Fully-Burdened Labor
Proposed Labor CategoryYear 1Year 2Year 3Year 4Year 5
General and Operations Manager, Senior (KEY)
Industrial Production Manager, Senior (KEY)
Electrical Engineer, Journeyman (KEY)
Mechanical Engineer, Journeyman (KEY)
Management Analyst, Journeyman
Management Analyst, Junior
Logistician, Journeyman (KEY)
Acquisition Logistics Analyst, Junior
Electronics Technician Maintenance, III
Electronics Technician Maintenance, II
Electronics Technician Maintenance, I
Engineering Technician, III
Engineering Technician, II
Engineering Technician, I
Team Assembler, II (KEY)
Team Assembler, I
Technical Instructor/Course Developer
Sheet Metal Worker, Maintenance
Shipping/Receiving Clerk
Supply Technician
Drafter/CAD Operator, II
Administrative Assistant
General Clerk, II
Technical Writer, II
Truck Driver

Sheet1

File details come from the government source that posted it. Updated .