Attachment_P6C_CPFF_Breakout_spreadsheet.xls

XLS spreadsheet 2 MB Posted

Attached to
Research, Development, Test and Evaluation (RDT&E) Infrastructure Division NAVAIR 5. 4. 1
Solicitation number
N00421-15-R-0003
Issued by

About this file

P6C_CPFF_Breakout_spreadsheet

View the file

Other files

File Type Posted
N00421-15-R-0003_October_4_2016_Revision.docx DOCX document
RFP_Industry_Question_39_APR_13_2016.xls XLS spreadsheet
RFP_Industry_Question_38.xls XLS spreadsheet
RFP_Questions_Amendment_0003.xls XLS spreadsheet
N00421-15-R-0003-0003_RFP_Conformed.docx DOCX document
N00421-15-R-0003_AMENDMENT_0003.docx DOCX document
RFP_Questions_Amendment_0002.xls XLS spreadsheet
Amendment_0002_RFP_N00421-15-R-0003.docx DOCX document
Amendment_0001_RFP_N00421-15-R-0003.docx DOCX document
AMENDED_Attachment_P007_Breakout_Subcontractor.xls XLS spreadsheet
AMENDED_Attachment_P006_Breakout_PRIME.xls XLS spreadsheet
Attachment_P001_Workforce_Qualifications.xls XLS spreadsheet
RFP_Industry_Questions_and_Government_Responses.xls XLS spreadsheet
N00421-15-R-0003_RFP_Released.docx DOCX document
Attachment_001_DD254.pdf PDF
Attachment_002_SAAR_N_Form.pdf PDF
Attachment_004_QASP.doc DOC document
N00421-15-R-0003_5.4.1_FAM_RFP_(FINAL)_23_FEB_2016.docx DOCX document
Attachment_P004_Past_Performance_Matrix.doc DOC document
Attachment_P006_Breakout_PRIME.xls XLS spreadsheet
Exhibit_A_CDRLS.pdf PDF
Attachment_003_OCI_List.doc DOC document
Attachment_P007_Breakout_Subcontractor.xls XLS spreadsheet
Attachment_P008_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Attachment_P005_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Point_of_Contract.docx DOCX document
AIR_5.4.1.2_Industry_Day_Brief_6-4-2015.pptx PPTX presentation
Attachment_05_Incurred_Cost_and_Progress_Reporting.xls XLS spreadsheet
Attachment_P8__Initial_Task_Order_Spreadsheet.xls XLS spreadsheet
Attachment_P2_Workforce_Hour_Matrix.xls XLS spreadsheet
Attachment_P7C_Sub_CPFF_Breakout.xls XLS spreadsheet
N00421-15-R-0003_Draft.doc DOC document
Attachment_P6F_FFP_Breakout_spreadsheet.xls XLS spreadsheet
Initial_Task_Order.docx.rtf RTF text file
Attachment_P7F_Sub_FFP_Breakout.xls XLS spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
(Please note that the cells referenced below correspond to the Cost Type sheet. The Fixed Price sheet is numbered slightly differently due to the absence of the Capacity Increase CLIN. For example, cell I417 on the Cost Type sheet is cell I409 on the Fixed Price sheet.)
Government:
AOn Footer Tab for the worksheet, insert the RFP number after the colon.
BInsert the Contract Line Item Numbers (CLINs) at Cells I2, K2, M2, O2, Q2, S2, U2, W2, Y2 and AA2 for the services and at I415, i425, K415, K425, M415, M425, O415,O425, Q415, Q425, S415, S425, U415, U425, W415, W425, Y415, Y425, AA415 and AA425 for ODCs.
CInsert the CLIN description at Cells I4, K4, M4, O4, Q4, S4, U4, W4, Y4 and AA4. It can be color of money such as APN, OM&N, RDT&E, etc; or it may be specific tasks areas or locations, depending on how the Performance Based Statement of Work is written. (Once these cells are filled in, they will automatically populate cells I417, I427,K417, K427, M417, M427, O417, O427, Q417, Q427, S417, S427, U417, U427, W417, W427, Y417, Y427, AA417, and AA427 with the same information.
DIn column A starting at row 5, insert the Government Labor Categories from the Historical Information being provided in the solicitation. List each category only once regardless of the number of estimated support hours. Once A5 through A40 are filled in, they will automatically populate the corresponding cells for the subcontractors 1 through 8.
EIf Capacity Increase CLIN (CIC) is not being utilized in the solicitation, change the "10%" in cells G407, G408, G409 and G436 to "zero" and hide the rows 406-410, 435 and 436. If utilized, CIC is to be used for all Cost Type CLINs for each period.
Contractor:
1On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated.
2On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in.
3A worksheet should be prepared for each period of performance. The tab should be renamed to match the period of performance. A SUMMARY SHEET OF ALL PERIODS NEEDS TO BE COMPLETED AS A SEPARATE TAB.
4Every worksheet should have items 1 through 3 completed.
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6Within the work sheet any cell colored "blue" contains a formula and should not be edited.
7All dollar figures shall be carried out no further than two decimal places.
8The worksheet is arranged that the workforce being proposed for an entire period of performance is shown together, even though it will separated by individual CLINS in Section B. When the numbers are carried to Section B, they will be the same as shown on the worksheet.
9In Cell B2, enter the period of performance calendar dates. (ex: 1 Jan 09 - 31 Dec 09)
10In column A, starting at row 5 to 40, the Government Labor Categories from the Historical Information should have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. However, if it is not comparable, utilize the "not comparable" row. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. The Offeror is not required to utilize the Government's labor categories. However, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. The Offeror does not insert any subcontractor information in this section. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
11In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces.
12In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the prime contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) For the subcontractors, their fields are in yellow. No input is required by the Offeror in this column. Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforces, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
14In column F, enter the name of the proposed individual for that position.
15In column G:
(a) for the prime contractor, enter the unburdened labor rate for each individual (e.g. rows 5-44)
(b) In Cell G46 the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell G47 the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank.
(d) In Cell G50, the prime contractor should insert its overhead rate for work performed at the contractor's facility.
(e) In Cell G51, the prime contractor should insert its overhead rate for work performed at the Client/Government's facility.
(f) In Cell G53, the prime contractor should insert its G&A rate being applied.
(g) for the subcontractor enter the fully burden cost including fixed fee associated with individual labor category for CLIN XX00 (e.g., rows 59-98, 101-140, 143-182, 185-224, 227-266, 269-308, 311-350, and 353-392)
(h) In Cell G395, the prime should insert the subcontractor handling charge, if any.
(i) In Cell G398, the prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
(j) In Cell G399, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16In column H, and then similarly for Columns J, L, N, P, R, T, V, X and Z:
(a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for CLIN XX00 (e.g., rows 5-44, 59-98, 101-140, 143-182, 185-224, 227-266, 269-308, 311-350, and 353-392). Also make sure you plug in the hours for columns J, L, N and so on.
(b) In Cell H46, the prime contractor should insert the "labor base" its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell H47, the prime contractor should insert the "labor base" its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(d) In Cell H50, the prime contractor should insert the "labor s base" its overhead rate is being applied to for work performed at the contractor's facility.
(e) In Cell H51, the prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the Client/Government's facility.
(f) In Cell H53, the prime contractor should insert the base its G&A rate is being applied to.
(g) In Cell H398, the prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor).
(h) In Cell H399, the prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any.
(i) Under Other Direct Costs, the prime contractor should insert the Travel, Material and NMCI by CLIN.
17Insert the CLIN number for the specific period of performance as identified in Section B of the Solicitation in cells I2, K2, M2, O2, Q2, S2, U2, W2, Y2 and AA2 when creating the additional sheets for the option periods.
18Column AE automatically calculated the total hours for all the CLINS.
19Column AG is a summation of the costs.
20In cells I418, K418, M418, O418, Q418, S418, U418, W418, Y418, and AA418 enter the amount for travel
21In cells I419, K419, M419, O419, Q419, S419, U419, W419, Y419, and AA419 enter the amount for material.
22In cell G421 enter the rate for material handling if it is being applied to Travel and Material. If not applying a material handling, cell should be left blank.
23In cell G422 enter the rate for G&A if it is being applied to Travel and Material. If not applying a G&A rate, cell should be left blank.
24In cells I428, K428, M428, O428 Q428, S428, U428, W428, Y428, and AA428 enter the amount for NMCI
25In cell G430 enter the rate for material handling if it is being applied to Travel and Material.
26In cell G431 enter the rate for G&A if it is being applied to NMCI.
27If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the prime is only utilizing two subcontractors, then the rows concerning sub 3 through 8 (which are rows 142 through 393) would be hidden.
28When submitting this file, the instructions may be deleted.

Year 1

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:CLIN0001CLIN0001CLIN0001CLIN0001CLIN0001CLIN0001CLIN0001CLIN0001CLIN0001CLIN0001CLINXX09CLINXX10CLINXX11
ServicesContractorhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalHrs
Government Labor CategoryProposed Categorysitesubf/pEmployee NameRatePAX RiverOrlandoJaxCherry PtSan DiegoLakehurstPt. MuguChina LakeWhidbeySt. Inigoes(description)(description)(description)SUMTotal
Computer Systems Analyst I$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst II$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst III$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst I$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst II$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Information Assurance Analyst$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Senior$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Junior$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Scientist, Sr$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst, Sr$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
subtotal0$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
fringe fulltime0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
OverheadBaseBaseBaseBaseBaseBaseBaseBaseBaseBaseBaseBaseBase
Contractor site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Client site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
COM0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor$ - 0
Subcontractors
Sub: 1:
Computer Systems Analyst I1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst II1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst III1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst I1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst II1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Information Assurance Analyst1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Senior1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Junior1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Scientist, Sr1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst, Sr1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 1- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 2:
Computer Systems Analyst I2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst II2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst III2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst I2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst II2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Information Assurance Analyst2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Senior2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Junior2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Scientist, Sr2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst, Sr2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 2- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 3
Computer Systems Analyst I3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst II3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst III3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst I3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst II3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Information Assurance Analyst3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Senior3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Junior3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Scientist, Sr3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst, Sr3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 3- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 4:
Computer Systems Analyst I4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst II4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst III4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst I4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst II4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Information Assurance Analyst4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Senior4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Junior4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Scientist, Sr4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst, Sr4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 4- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 5:
Computer Systems Analyst I5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst II5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst III5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst I5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst II5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Information Assurance Analyst5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Senior5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Junior5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Scientist, Sr5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst, Sr5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 6:
Computer Systems Analyst I6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst II6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Systems Analyst III6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst I6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Management Analyst II6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Information Assurance Analyst6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Senior6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Admin, Junior6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Computer Scientist, Sr6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
System Analyst, Sr6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .