Solicitation Amendment - N0040626QS2460001.pdf

PDF 2 MB Posted

Attached to
Radiographic inspection of Sonar Dome Rubber Windows
Solicitation number
N0040626QS246
Issued by

About this file

This is a Request for Quote (RFQ) for radiographic inspection services of Sonar Dome Rubber Windows (SDRW) aboard the USS MUSTIN (DDG-89) at Yokosuka, Japan.

The contractor shall perform radiographic inspection of the SDRW in accordance with the Performance Work Statement, with a firm fixed price arrangement for one job. The work must be completed within the on-site performance window of September 4-14, 2026, with normal work hours of 8:00 AM to 4:45 PM Monday through Friday. The solicitation is set aside for Women-Owned Small Business (WOSB), with NAICS code 336611 and size standard of $26 million. The offer due date is April 7, 2026 at 11:00 PM. Inspection and acceptance occurs at both the source and destination (SRF and JRMC Yokosuka). The solicitation incorporates FAR 52.212-1, 52.212-4, 52.212-3, and 52.212-5 by reference. Evaluation criteria include technical factors (including delivery date), price, and past performance in no order of relative importance. All quoters must identify exceptions to the solicitation terms, conditions, and specifications. The Government anticipates awarding a firm fixed price contract under FAR Part 12, placing maximum risk on the contractor. Submission of invoices will be via WAWF, and the contractor must be registered in SAM to receive a government award. Key requirements include submission of radiography operations planning documentation 14 working days prior to commencing work, establishment of physical radiation safety boundaries, maintenance of boundary monitors, and compliance with NAVSEA, NRL, and NSI ionizing radiation hazard prevention requirements. The contractor is responsible for all travel, marine chemist services, equipment, signs, and communication radios. Documents required for base access include visit request letters, installation access forms, SPOT Letter of Authorization, SECNAV forms, and passport copies for contractors without CACs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Section A - Solicitation/Contract Form

Radiographic Inspection of Sonar Dome Rubber

Additional Regulation or Supplemental Clauses Incorporated by Full Text

FLCPS SRF 001 FLCPS_SRF_NOTICE_TO_OFFERORS (Aug 2025)

This Solicitation is a REQUIREMENT for a Radiographic Inspection of Sonar Dome Rubber

1. NOTICE TO ALL OFFERORS: The Government anticipates awarding a firm, fixed price contract in accordance with RFO Part 12in response to quotes/proposals received in response to this solicitation. A firm, fixed price contract places the maximum risk and full responsibility for all costs and resulting profit or loss on the contractor, offerors are advised to consider these risks when pricing their quotes/proposals.

2. See block 8 on page 1 of the solicitation for the closing date and time.

3. The deadline for submission of questions regarding the solicitation's terms, conditions, and performance work statement (PWS) is 2 day prior to the solicitation's closing date. Submit via email, to the Contracting Official:

Name: Sara Robinson Email: sara.e.robinson19.civ@us.navy.mil

4. In accordance with RFO 12.203, the Government will select the most advantageous offer based on the following evaluation factors: technical including delivery date, price, and past performance in no order of relative importance.

5. "EXCEPTIONS: All quoters MUST note all exceptions from the solicitation's terms, conditions, specifications, and/or the statement of work / performance work statement, if any. It will be assumed that any quote without mention of any exceptions will take no exception from all specifications, terms and conditions, clauses, or provisions within the solicitation."

6. SINGLE AWARD FOR ALL ITEMS: Due to the interrelationship of supplies and/or services to be provided hereunder, the Government reserves the right to make a single award to the quoter whose quote is considered in the best interest of the government, price and other factors considered. Therefore, quoters who quote less than the entire effort specified herein may be determined to be unacceptable.

7. Submission of invoices will be via WAWF; see Clause 252.232-7006.

PLEASE PROVIDE:

YOUR NAME:

YOUR SAM REGISTERED CAGE CODE NUMBER:

YOUR E-MAIL ADDRESS:

YOUR PHONE NUMBER:

LIST YOUR COMPANY SIZE: LARGE OR SMALL

YOUR COMPANY MUST BE REGISTERED WITH **SAM** SYSTEM AWARD FOR MANAGEMENT IN ORDER TO RECEIVE A

GOVERNMENT AWARD

THIS IS ALWAYS A FREE SITE TO REGISTER; SEE FOLLOWING LINK: HTTPS://WWW.SAM.GOV

FOR SERVICES:

Information for Contractor Employees Seeking to Enter Japan

1. The following is provided for the information of contractors to the U.S. Navy whose employees need to enter Japan to perform contract requirements. The information is current as of February 2023. While the information is believed to be accurate, policies and procedures are continuing to change on a regular basis.

2. See https://www.japan.travel/en/coronavirus/ for a list of the current restrictions and COVID entry procedures.

3. All contractor personnel arriving in Japan should utilize the process outlined in the USFJ Instruction to ensure they are recognized as members of the civilian component under Article 1.b. of the SOFA. The process requires that a contractor contact the contracting officer for the contract on which its employee will perform in Japan prior to the employee traveling to Japan. Contact is made through the Synchronized Pre-deployment and Operational Tracker (SPOT) system. The contractor will provide information to the contracting officer about the traveling employee. Following review, the contracting officer will issue the contractor a Letter of Authorization (LOA). The incoming contractor employee will hand carry a copy of the LOA and show it to the Japanese immigration authority at the port of entry as evidence of SOFA status. Contractors who do not have current access to SPOT should contact their contracting officer for information about accessing SPOT.

N0040626QS2460001

4. This memo is intended to provide current information for contractors whose employees need to enter Japan to perform contract requirements.

Nothing in the memo should be understood to change the terms or conditions of an existing contract. Any such changes must be made by an authorized contracting officer per 52.212-4.

The following attachments will be provided upon request:

1. USFJI 64-100, Contract Performance in Japan (25 Oct 2019)

Requirements for contractors to receive CFAY base access:

Documents that are required for contractors that don't have a CAC:

1. Visit request letter *1

2. Installation Access Request Form *2, 5

3. SPOT Letter of Authorization (LOA) *3

4. SECNAV 5512-1 *4

5. Color copy of passport

Notes:

1. Visit request letter should be on company letterhead

2. Dates on the installation access form must match the respective contractors LOA

3. LOA must be signed by contracting officer

4. SECNAV 5512-1 must have SSN listed, and initials/signature must be hand written. Block 24: POC will be provided at time of award.

Documents that are required for contractors that have a CAC:

1. Visit request letter *1

2. SPOT Letter of Authorization (LOA) *2

Notes: Visit request letter should be on company letterhead

All forms must be electronically filled out (except SECNAV Form page-2, blocks 28-29 for Initials and block-30 for Wet Signature and date).

- Ensure visit dates (DBIDS and Visit Request Letter) are the same

- Home address on DBIDS and SECNAV Forms must be the same

- DBIDS form, ID TYPE: Passport and provide passport number

- SECNAV Form, block-13, ensure FULL SSN, state ID/Drivers License and Passport Number and information are provided on block-14-18

- Forms not filled out correctly will be returned

NOTES:

1. These documents must be sent through DOD SAFE or ENCRYPTED email (due to PII) 14 days prior to scheduled visit.

2. Contractors will not enter Japan without a SPOT LOA, which shall present copy of SPOT LOA to the Japanese immigration official upon entry into Japan and keep a copy of the LOA in their possession while present in Japan. A copy does not need to be kept on the employee's person but should be in the employee's possession so they may produce the copy within a reasonable time as required for administrative processing and renewal purposes as per USFJINST 64-100.

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

The Contractor shall perform radiographic inspection of Sonar Dome Rubber Windows (SDRW) in accordance with the Performance Work Statement (PWS).

Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

PERFORMANCE WORK STATEMENT

1. GENERAL SCOPE OF WORK:

This performance work statement (PWS) defines the scope of the contract; identifies technical reference documents applicable to performance of this contract; and describes the general tasks that the Government will require under this contract onboard and in support of the USS MUSTIN (DDG-89) ship in SRF-JRMC

Yokosuka, Japan.

The periodic radiographic inspection of Sonar Dome Rubber Windows (SDRW) is required to be accomplished while the ship is waterborne. Inspections must be accomplished by NAVSEA approved contractors, per information in Section 7 of Reference B. RADIOGRAPHY OPERATIONS PLANNING WORK SHEET

(Attachment I) to be submitted at least 14 working days prior to commencement of work, per 3.4 listed below.

2. REFERENCES:

The following references are applicable and the contractor must comply with the references listed:

A) NAVSEA STANDARD ITEMS FY-26 CH-1 Naval Sea Systems Command > Home > RMC > CNRMC > Our Programs > SSRAC

B) Naval Research Laboratory; Technical Data Requirements for the Radiographic Inspection of Sonar Dome Rubber Windows (SDRW), Revision 10, March 30, 2022

C) NSI 009-112 FY : Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish-26 CH-1

3. WORK STATEMENT ITEM:

3.1. The contractor will perform the radiographic inspection on the SDRW in accordance with Reference B, NRL Technical Data Requirements for the Radiographic Inspection of Sonar Dome Rubber Windows (SDRW), Revision 9, January 2020, and in accordance with Reference C, NSI 009-112 : Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish.FY-26 CH-1

3.2. No radiography is to be performed without the SRF-JRMC RSO/ARSO specific permission. SRF-JRMC RSO/ARSO will be notified by the contractor and acquire said permission before commencing the radiographic inspection.

3.3. The Contractor must submit to SRF-JRMC (RSO) an illustration showing the 2 mR/hr boundary to being given permission prior to start radiography. The contractor will provide the calculations to prove the location of the 2mr/hr boundary.

3.4. The Contractor will submit written notification of intention to commence radiographic operations and illustration per 3.3, in hard copy or electronic media, to SRF-JRMC (C-106RSO) not later than working days to commencement of radiography operations. 14 prior Notification will identify the date, time, location, type of radiography performed (gamma, x-ray), and purpose of the radiography. The contractor's notification shall include the completion of RADIOGRAPHY OPERATIONS PLANNING WORK SHEET, (Attachment I).

The SRF-JRMC RSO/ARSO shall review and approve the Contractor's Attachment I and the diagram of the boundary.

3.5. The contractor shall establish a physical boundary at the 2 mr/hr (0.02 mSv/hr) boundary. The perimeter of the radiation area shall be a physical barrier established by an enclosure, or by stanchions and rope, as necessary. Post this boundary with "Radiation Area", "Radiography in Progress" "Keep Out" signs written in English & Japanese. The signs shall be visible to any person approaching the radiation area barrier from any accessible direction. Signs are to be provided by contractor.

N0040626QS2460001

https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/ https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/ https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

3.5.1. The Contractor is required to establish boundary guards around the 2 mR/hr boundary to prevent unauthorized access across the 2 mR/hr boundary and the guards must have direct communication with the Lead Radiographer. Note:

Waterborne Radiographic Inspection requirement:

3 EA - Radiographer (must be qualified to enter pressurized compartment)

2 EA - Boundary monitor-one inside the ship to prevent ships force from entering the dome and one outside to prevent personnel near the dome In dry dock Radiographic Inspection:

3 EA - Radiographer (must be qualified to enter the dome)

5 EA - Boundary monitor

3.6. The contractor radiographer shall maintain constant surveillance of the entire area boundary through direct observation or by positive communication with barrier monitors who are in a position to provide visual surveillance. The intent of this requirement is to enable the radiographer to immediately shut down x-ray production or retract the source if a person penetrates the radiation area boundary.

3.7. If an unauthorized individual crosses the boundary, the boundary monitor shall immediately notify the radiographer who will immediately stop radiography operations.

3.8. Any boundary violation shall be reported to the SRF Radiation Safety Officer (RSO) immediately. A follow-up report shall be submitted in writing 4 hours of the violation. The report shall include the time of violation, name of individual(s), the names of within the radiography crew, including boundary guards, the kVp, mA, and beam direction for the x-ray machine duration of actual exposure or if using source material, the value of the collimator and the beam direction at the time of violation. A diagram showing the half location of the violation and egress in relation to the source included. Any format that includes all data above is the path be shall acceptable.

3.9. The entire boundary shall be monitored using radiation detection equipment appropriate for the source of radiation during the first radiation exposure of the day. If the beam's orientation, kVp, mA, collimation, or shielding is changed between exposures the boundary , shall be re-surveyed and if necessary re-posted. The results of the monitoring shall be documented and include the time, date and location of the survey, the highest radiation level recorded, the kVp, mA, and beam direction of the x- ray machine or if using gamma source material, the halve value of the collimator and beam direction at the time of the exposure. A copy of the survey be provided shall to SRF-JRMC (C106) within 24 hours of completion of radiography operations. Any format that includes all data above is acceptable.

3.9.1. In addition to the above boundary reporting requirements, the contractor radiographer shall cease and make safe all radiographic operations and notify SRF'S RSO upon loss or theft of radioactive material or x-ray producing devices.

4. GOVERNMENT FURNISHED EQUIPMENT:

4.1. The Government will provide workspace onboard the ship/shop as required in the performance of the work in radiographic inspection.

4.2. General consumable supplies, including materials to erect the boundary, will also be provided as necessary.

4.3. Rigging assistance and trade support as needed.

5. CONTRACTOR FURNISHED PROPERTY:

The Contractor shall provide all management, labor, parts, signs, special test equipment, radios for communication throughout the radiographic inspection, and tools necessary to perform work outlined in the delivery order, except those listed in Government Furnished Property. In performance of this requirement, KTR to provide own MARINE CHEMIST SERVICES.

6. PLACE OF PERFORMANCE:

The worksite is onboard the SRF-JRMC Yokosuka, Japan, pier side.USS MUSTIN (DDG-89),

7. Points Of Contact (POCs)

*TO BE UPDATED AT TIME OF AWARD*

8. Radiation Safety Officer (RSO) C106R

*TO BE UPDATED AT TIME OF AWARD*

9. PERIOD OF PERFORMANCE:

Work must be accomplished within On-Site POP window: 04 SEP 2026 - 14 SEP 2026

10. ESTIMATED WORK HOURS:

Normal work is scheduled for accomplishment between the hours of 8:00AM to 4:45PM, with a 45-minute lunch break, Monday through Friday. Unless the offeror states otherwise in his proposal, the Contractor shall observe the same holidays as the Government and shall be open for business at all other times. The contractor may be required to work additional hours outside of the normal work schedule, as requested /directed from the project management.

11. TRAVEL REQUIREMENTS:

All travel requirements shall be the responsibility of the contractor.

Requirements for contractors to receive CFAY base access:

Documents that are required for contractors that don't have a CAC:

1. Visit request letter *1

2. Installation Access Request Form *2, 5

3. SPOT Letter of Authorization (LOA) *3

4. SECNAV 5512-1 *4

5. Color copy of passport

Notes:

1. Visit request letter should be on company letterhead

2. Dates on the installation access form must match the respective contractors LOA

3. LOA must be signed by contracting officer

4. SECNAV 5512-1 must have SSN listed, and initials/signature must be hand written. Block 24 should be: Brooklyn Patrocky | 243-7742

5. Section 4 information should be as follows: Patrocky | Brooklyn | T | SECURITY OFFICER | SRF- JRMC | 243-7742 | NA | Brooklyn.T.Patrocky.civ@us.navy.mil

Documents that are required for contractors that have a CAC:

1. Visit request letter *1

2. SPOT Letter of Authorization (LOA) *2

Notes:

1. Visit request letter should be on company letterhead

2. LOA must be signed by contracting officer

**When submitting contractor gate passes please state if the contractors do/don't have CACs.

**When submitting let us know if there are any non-US citizens as there will be more paper work to complete.

Security office email distro and individual email addresses:

Edward.d.harris3.civ@us.navy.mil brooklyn.t.patrocky.civ@us.navy.mil jose.m.rosa10.civ@us.navy.mil mark.j.gobeil.ctr@us.navy.mil

12. TRANSPORTATION OF THE EQUIPMENT/MATERIAL:

Shipping and handling of equipment and material to and from the contractor facility and SRF-JRMC Yokosuka, Japan, in support of the requirement shall be the responsibility of the contractor.

13. GENERAL INFORMATION:

13.1. Nothing contained in the performance work statement shall relieve the Contractor from complying with applicable Federal, state, and local Japanese laws, codes, ordinances, and regulations, including the obtaining of licenses and permits that may be required for the Contractor or Subcontractor(s) to perform a particular function, such as hazardous waste handling or disposal, or example.

13.2. Medical treatment. Government emergency vehicles and medical personnel shall only be used in emergency situations affecting contractor personnel whose life may be in danger or who are seriously injured. Government facilities may be used in these instances as the first point of treatment. Transfer to a non-Government medical treatment facility shall be made as soon as possible and as determined by attending medical authorities.

14. CONTRACTOR IN THE WORKPLACE:

14.1. Identification. All Contractor spaces/desks shall be clearly marked as contractor spaces only.

14.2. All e-mail addresses used by contractor personnel shall identify the company name.

14.3. All contractor correspondence shall be clearly marked with company name or letterhead.

14.4. Contractor personnel shall insure that when answering telephones that they identify themselves as contractor personnel.

14.5. Contractor personnel are not to handle/operate any lifting and handling equipment or other shop equipment, machines or tools without written consent from project superintendent prior to accomplishment of the task.

15. SAFETY AND ENVIRONMENTAL

15.1. Safety Requirements. The contractor shall establish, administer, and enforce safety rules that will meet the current requirements of the Occupational Safety and Health Administration (OSHA), and all applicable work item references. Work to be performed under this contract shall be accomplished using the guidelines identified Contractors and Subcontractors. When necessary, work shall be coordinated with the Safety Department to ensure all safety and health requirements are considered.

15.2. Safety Equipment. The contractor shall provide their employees with all necessary safety equipment during the performance of work on this contract. All contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (i.e. hard-hats, steel-toe safety shoes, safety glasses and hearing protection). If required, the Contractor shall provide all appropriate safety barricades, signs, and signal lights required to properly isolate the area of work.

15.3. Prior to commencing work, the Contractor representative(s) shall arrange with the Receiving Activity

Point of Contact, to meet in conference with the customer, shop supervision, and other necessary personnel to discuss and develop mutual understandings relative to the administration of the Safety Program.

15.4. Environmental Requirements. Work performed under this contract shall be in compliance with all Japanese, Navy, Federal, State and local regulations, and all work items references, pertaining to the environment at all times. When necessary, work shall be coordinated with the Environmental Department to ensure that regulations are considered.

15.5. Responsibilities. The contractor bears sole responsibility for the safety of his/her employees and compliance with environmental regulations. Naval safety personnel will monitor the safety of procedures, conduct inspections of the workplace, and perform safety related investigations, evaluations. The contractor shall conduct routine inspections of work and storage areas under his cognizance to maintain compliance with the cleanliness, material and waste management, air and water pollution controls, and provides general oversight on the environmental issues associated with this contract.

15.6. Situations that warrant corrective action will be brought to the attention of the contractor through the Contracting Officer Representative (COR). If violations could cause major damage or loss of life, Safety or Environmental personnel may contact contractor supervisory personnel on site and request corrective action or work stoppage. The COR will be notified immediately. The Commanding Officer has final authority for Station safety and environmental matters. He has delegated the Safety and Occupational Health Manager the authority to represent the Command in all safety matters and to resolve any disputes which may arise, and he has delegated the Environmental Manager the authority to represent the Command in all safety matters and to resolve any disputes, which may arise. Any interpretation of the various environmental regulations will be made by the Safety or Environmental Manager.

15.7. Accident Reporting. All accidents occurring on Station are reported to the Station Safety Department. If accidents occur after regular working hours the Command Duty Officer, shall be notified. Motor vehicle accidents occurring on Station are reported to both the Safety Department and Security Manager. In all cases, the accident scene must be preserved until the Government investigator has authorized movement of the materials and vehicles involved. Materials and equipment may be moved only as necessary to facilitate the removal of injured persons. The contractor shall forward a copy of all accident reports involving contractor employees to the COR. If Government property is involved, a copy of the accident report shall also be forwarded to the Government Property Administrator

(GPA).

16. SECURITY

16.1. Admittance to The Work: Upon contract award, employees or representatives of the Contractor may require access to the Receiving Activities Operations Area (OA) or Industrial Area (IA) and shall be admitted to the work site only after they have been issued a Security Pass/ID Badge.

16.2. Notice: Persons who are currently on probation or parole from a felony conviction cannot qualify for security clearances and will be denied access to the activity.

16.3. It shall be the Contractor's responsibility to collect and account for all identification passes issued to their personnel at the expiration of the contract or when access is no longer required.

16.4. Foreign Nationals or Affiliations - Foreign Nationals (non U.S. Citizens) or persons affiliated with, or employed by, a foreign owned company will not be granted access to a Naval Activity's OA/IA, without prior written approval from Commander, Naval Sea Systems Command.

17. PERFORMANCE REQUIREMENT STATEMENT SUMMARY

Primary Performance Standard Performance Standard/AQL

Performance Assessment

Method

Contractor performed in accordance with all NRL, SRF, and NAVSEA requirements.

Services performed met the requirements 100% of the time

The Surveillance Officer will evaluate basis and assess this on a task order by task order basis and assess compliance through review of the PWS and assess overall compliance

Reports required for illustrations, boundary violations and all other information Met the requirements 100% of the time

COR will retain copies of reports in a file for each job

Contractor met the performance requirements of each individual task order Services performed meet requirements 100% of the time

Review of performance by

Surveillance Officer

The contractor maintained close liaison and good communications with the Government

Any problems or q u e s t i o n s encountered by either party are addressed within 2 business days

Review of performance by Surveillance Officer

The contractor invoiced in a timely manner and in accordance with the contract

Invoices submitted with

COR/Surveillance Officer signature

Review of performance by

Surveillance Officer

Combating Trafficking in Persons - Using mindful observance and attentive listening the Surveillance Officer will monitor the contractor's performance regarding trafficking in persons such that non- compliance with FAR clause 52.222-50, Combating Trafficking in Persons, is brought to the immediate attention of the contracting officer.

100% compliance with FAR 52.222-

All times the Surveillance Officer interfaces with the contractor

AQL = Acceptable Quality Level

18. CONTRACTOR MANPOWER REPORTING

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for CFAO via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/

Contractors will notify the SRF-JRMC POCs identified in section 7 of this PWS via email identifying the contractor personnel who will be traveling to SRF-JRMC in support of this contract prior to arrival.

Upon arrival at SRF-JRMC contractors will contact PROJECT POCs identified in section 7 of this PWS to coordinate execution of the requirements identified in this contract.

Requirements Radiographic Inspection of Sonar Dome Rubber

Section D - Packaging and Marking

Additional Regulation or Supplemental Clauses Incorporated by Full Text

FLCPS SRF 007 FLCPS_SRF_DELIVERY (Aug 2025)

(a) shall be in accordance with ASTM-D-3951 (most current edition), "Standard for Commercial Packing." The Preservation, packaging, and packing unit pack quantity that applies to items under this contract is "Industry Standard".

(b) The use of asbestos, excelsior, loose fill polystyrene, newspaper or shredded paper (all types including waxed paper, Prohibited Packing Materials.

computer paper and similar hydroscopic or non-neutral material) is prohibited.

(c) All non-manufactured wood utilized in wood pallets and wood containers shall be heat treated to a minimum Non-Manufactured Wood Packing.

core temperature of 56 degrees centigrade for 30 minutes and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC). Refer to https://www.aphis.usda.gov/aphis/ourfocus/planthealth/import-information/wood-packaging-material for wood packing policy, enforcement regulations and accredited agencies. Non-coniferous (hardwood) and manufactured wood, such as particleboard and plywood, are exempt from this requirement.

(d) , such as particleboard and plywood, are exempt from this requirement.Manufactured wood

(e) Packing must be sufficient to ensure safe delivery to the final destination without the need for additional repackaging or repair.

(f) All materials shall be packed to withstand multiple modes of transport (truck, rail, sea, or air) and handling by forklifts or cranes.

(g) Heavy items must be crated or skid-mounted to distribute weight evenly and ensure lifting point are accessible and marked.

(h) Packages must be stable, not exceed safe stacking limits, and be secured against movement in transit.

MARKING OF SHIPMENTS (COMMERCIALLY PACKAGED ITEMS)

(i) Marking shall be in accordance with ASTM-D-3951 (most current edition) and with the information set forth in paragraph (ii) below. Unless specified elsewhere in this contract/order, bar coding is not required.

(ii) All unit and exterior containers/packs shall, as a minimum, be marked as follows:

1. National stock number (NSN), when available, or Federal stock number (FSN), when NSN is not available, or part number when neither NSN or FSN are available.

2. Noun nomenclature cited on contract or order.

3. Quantity and unit of issue.

4. Contract, or order number.

5. From:_______________________________________________ (Contractor's Name) (Address)

6. To: (See delivery address on page 3-4 or in Section F)

(iii) Markings may be applied by any means which provide legibility.

TRACEABLE FREIGHT

The Contractor shall assume all responsibility for shipment to the specified destination. Shipment must be via a fully traceable commercial freight method. Traceable freight means that the shipment is registered upon shipment with an identifying number. The number is for location of the shipment at any point in transit, including final destination, and verifies shipment arrival at the specified destination. If a shipping method does not provide traceability as defined above, it shall not be used.

INSPECTION AND ACCEPTANCE (DESTINATION)

Inspection and acceptance of the supplies or services to be furnished hereunder shall be made at destination by the receiving activity.

PROOF OF DELIVERY

If United Parcel Service (UPS) or Federal Express services are used for transportation, each package must have a unique package identification number. The Government will not consider the manifest as proof of delivery unless each package can be uniquely identified. Acceptance will occur only after the Government can verify actual receipt of the contract items--packaged, marked and labeled as required elsewhere in this contract.

Section E - Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Not applicable

DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Government Representative, Receiving Warehouse Email: TBD Telephone: TBD

Section F - Deliveries or Performance

Overall Contract Delivery Period

Government Destination

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

Delivery Period From 04 Sep 2026 to 14 Sep

1 Job Ship To DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Government Representative, Receiving Warehouse Email: TBD Telephone: TBD

FoB Details Government Origin (Shipping Point)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

FLCPS SRF 006 FLCPS_SRF_SHIPPING (Aug 2025)

IF FOB Destination:

*Information provided at time of Award.

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table* To be updated at time of award

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC ____

Issue By DoDAAC ____

Admin DoDAAC ____

Inspect By DoDAAC ____

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

To be updated at time of award

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation) Feb 2026 52.204-91 Contractor Identification. (Deviation) Feb 2026

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation)

Feb 2026

52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation) Feb 2026 52.219-6 Notice of Total Small Business Set-Aside. (Deviation) Feb 2026 52.219-8 Utilization of Small Business Concerns. (Deviation) Feb 2026 52.219-33 Nonmanufacturer Rule. (Deviation) Feb 2026 52.222-19 Child Labor-Cooperation with Authorities and Remedies. (Deviation) Feb 2026 52.222-35 Equal Opportunity for Veterans. (Deviation) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation) Feb 2026 52.222-37 Employment Reports on Veterans. (Deviation) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-90 Fast Payment Procedure. (Deviation) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation) Feb 2026

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information.

Jan 2023

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7014 Limitations on the Use or Disclosure of Information by Litigation Support Contractors. Jan 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.205-7000 Provision of Information to Cooperative Agreement Holders. Oct 2024 252.211-7008 Use of Government-Assigned Serial Numbers. Sep 2010 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7006 Acquisition of the American Flag. Dec 2022 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.232-7010 Levies on Contract Payments. Dec 2006 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.247-7023 Transportation of Supplies by Sea. Oct 2024

DFARS Clauses Incorporated by Full Text

252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirements.

(Nov 2025)

CONTRACTOR COMPLIANCE WITH THE CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)

(a) . As used in this clause- Definitions

"Controlled unclassified information" means information the Government creates or possesses, or information an entity creates or possesses for or on behalf of the Government, that a law, regulation, or Governmentwide policy requires or permits an agency to handle using safeguarding or dissemination controls (32 CFR 2002.4(h)).

"Current" means-

(1) With regard to Conditional Cybersecurity Maturity Model Certification (CMMC) Status-

(i) Not older than 180 days for Conditional Level 2 (Self) assessments and Conditional Level 2 (certified third-party assessment organization (C3PAO)) assessments, with-

(A) No changes in compliance with the requirements at 32 CFR part 170 since the Conditional CMMC Status date (see 32 CFR

170.16 and 170.17); and

(B) A corresponding affirmation of continuous compliance by an affirming official (see 32 CFR 170.4); and

(ii) Not older than 180 days for Conditional Level 3 (Defense Industrial Base Cybersecurity Assessment Center (DIBCAC)) assessments, with-

(A) No changes in compliance with the requirements at 32 CFR part 170 since the Conditional CMMC Status date (see 32 CFR 170.18); and

(B) A corresponding affirmation of continuous compliance by an affirming official;

(2) With regard to Final CMMC Status-

(i) Not older than 1 year for Final Level 1 (Self), with-

(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.15); and

(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official;

(ii) Not older than 3 years for Final Level 2 (Self) assessments and Final Level 2 (C3PAO) assessments, with-

(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.16 and 170.17); and

(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official; and

(iii) Not older than 3 years for Final Level 3 (DIBCAC) assessments, with-

(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.18); and

(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official; and

(3) With regard to affirmation of continuous compliance (32 CFR 170.22), not older than 1 year with no changes in compliance with the requirements at 32 CFR part 170.

"Cybersecurity Maturity Model Certification (CMMC) status" means the result of meeting or exceeding the minimum required score for the corresponding assessment. The potential statuses are as follows:

(1) Final Level 1 (Self).

(2) Conditional Level 2 (Self).

(3) Final Level 2 (Self).

(4) Conditional Level 2 (C3PAO).

(5) Final Level 2 (C3PAO).

(6) Conditional Level 3 (DIBCAC).

(7) Final Level 3 (DIBCAC).

"Cybersecurity Maturity Model Certification unique identifier (CMMC UID)" means 10 alpha-numeric characters assigned to each CMMC assessment and reflected in the Supplier Performance Risk System (SPRS) for each contractor information system.

"Federal contract information (FCI)" means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government. It does not include information provided by the Government to the public, such as on public websites, or simple transactional information, such as information necessary to process payments.

"Plan of action and milestones" means a document that identifies tasks to be accomplished. It details resources required to accomplish the elements of the plan, any milestones in meeting the tasks, and scheduled completion dates for the milestones, as defined in National Institute of Standards and Technology Special Publication 800-115 (32 CFR 170.21).

(b) . The Cybersecurity Maturity Model Certification (CMMC) is a framework for assessing a contractor's compliance with Framework applicable information security protections (see 32 CFR part 170).

(c) . The CMMC assessments will not duplicate efforts from any other comparable DoD assessment, except for rare circumstances Duplication when a reassessment may be necessary, for example, when there are indications of issues with cybersecurity and/or compliance with CMMC requirements.

(d) . The Contractor shall- Requirements

(1)(i) Have and maintain for the duration of the contract a current CMMC status at the following CMMC level, or higher: ____ for all information Contracting Officer insert: CMMC Level 1 (Self); CMMC Level 2 (Self); CMMC Level 2 (C3PAO); or CMMC Level 3 (DIBCAC) systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI; and

(ii) Consult 32 CFR 170.23 related to the flowdown of the CMMC requirements, and flow down the correct CMMC level to subcontracts and other contractual instruments;

(2) Only process, store, or transmit FCI or CUI on contractor information systems that have a CMMC status at the CMMC level required in paragraph (d)(1) of this clause, or higher;

(3) Complete on an annual basis, and maintain as current, an affirmation, by the affirming official (see 32 CFR 170.4), of continuous compliance with the requirements associated with the CMMC level required in paragraph (d)(1) of this clause in the Supplier Performance Risk System (SPRS) ( ) for each CMMC UID applicable to each of the contractor information systems that process, store, or transmit FCI https://piee.eb.mil or CUI and that are used in performance of the contract;

(4) Ensure all subcontractors and suppliers complete prior to subcontract award, and maintain on an annual basis, an affirmation, by the affirming official (see 32 CFR 170.4), of continuous compliance with the requirements associated with the CMMC level required for the subcontract or other contractual instrument for each of the subcontractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the subcontract; and

(5) If the Contractor has a CMMC Status of Conditional, successfully close out a valid plan of action and milestones (32 CFR 170.21) to achieve a CMMC Status of Final.

(e) . The Contractor shall- Reporting

(1) Submit to the Contracting Officer-

(i) The CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract; and

(ii) Any changes in the CMMC UIDs generated in SPRS throughout the life of the contract, task order, or delivery order, if applicable;

(2) Enter into SPRS the results of a current self-assessment for each CMMC UID, not covered by a C3PAO assessment or DIBCAC assessment, applicable to each of the contractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the contract; and

(3) Complete in SPRS on an annual basis and maintain as current an affirmation of continuous compliance by the affirming official (see 32 CFR 170.4) for each self-assessment, C3PAO assessment, or DIBCAC assessment required under the contract in SPRS.

(f) . The Contractor shall- Subcontracts

(1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e)(1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and

(2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor based on the requirements at 32 CFR 170.23.

(End of clause)

252.211-7003 Item Unique Identification and Valuation. (Jan 2023)

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(a) . As used in this clause- Definitions

"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

"Concatenated unique item identifier" means-

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.

"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards Organization (ISO)/International Electrotechnical Commission (IEC) 16022.

"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.

"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at . https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html

"DoD item unique identification" means a system of marking items delivered to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .