This is a Questions and Answers (Q&A) document addressing clarifications related to a furniture relocation contract at Naval Station Everett.
The solicitation concerns the relocation of furniture and appliances across 18 rooms within a four-story building at Naval Station Everett. Furniture items include Captains Beds, Headboards, Mattresses, Desks, and 4-Drawer Dressers, currently dispersed across all four floors within specified distances from elevators. The contractor must relocate 18 refrigerators (124 lbs each), 18 microwaves, and 36 writing desks (2 per room). The Government will provide shared use of two working elevators with interior cabin dimensions of W-60" x L-81" x H-84" and a 4,000 lb weight capacity. The relocation will occur in a single continuous phase rather than multiple phases. Hardware for headboard reattachment (4 screws) will be provided in a single bag, with the contractor responsible for replacing any missing or damaged hardware. The contractor must place and plug-in appliances, with refrigerators and microwaves kept separate. All waste materials must be hauled off-installation for disposal; on-base dumpsters are not available. A joint condition inspection between the Government and contractor can be requested and accommodated prior to moving furnishings. The contract will be awarded with sufficient time to allow contractor personnel to obtain base-access approval through the BAVR process. The start date is listed on page 9 of the solicitation, with exact dates to be coordinated with the customer post-award. No pre-bid site walkthrough will be hosted for prospective offerors; the PWS has been updated to reflect this change.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.1.1 N0040626Q0540 Amendment 01.pdf | ||
| ITEM PHOTOS.pdf | ||
| Solicitation N0040626Q0540.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Please confirm whether all furniture is currently staged in the identified 1st- and 2nd-floor storage locations.
Furniture is dispersed on all 4 floors, within 20ft of the elevator for floors 1, 3, 4, and within 50ft of the elevator on the 2nd floor. Items include Captains Beds, Headboards, Mattresses, Desks, and 4-Drawer Dresser. All other items are in the restrooms of their designated room.
2.Are the refrigerators/freezers empty, disconnected, and ready for relocation.
Yes. All are empty, disconnected and stowed within the bathroom of the room they belong in.
3.Will the government elevator be available for dedicated contractor use during the scheduled relocation period, or will it remain in shared use?
Shared use of (2) working elevators.
4.Will the move occur in a single continuous phase or multiple phased iterations?
Single phase.
5.PWS Section 4.5 notes that an elevator will be provided for contractor use. Could the
Government confirm the interior cabin dimensions and weight load capacity of this elevator.
W-60 x L-81” x H-84”, Load capacity 4000lbs
6.To ensure a clear baseline of responsibility, will a joint condition inspection be conducted between the Government and the contractor prior to moving furnishings from the 1st and 2nd deck holding areas?
A joint inspection can be requested and accommodated
7.Will all original assembly hardware currently be tagged or bagged with the staged items, or is the contractor expected to furnish replacement hardware if missing?
The only item requiring hardware is the headboard. It will need to be reattached to the bed with
4 screws. All hardware is the same and contained within one bag. Replacement by the contractor would be expected should hardware become damaged or missing during install.
8.Will the contractor be permitted to utilize on-base Government refuse/recycling dumpsters at
Naval Station Everett for the disposal of non-hazardous packing materials and temporary floor coverings (cardboard/wrapping), or must all waste materials be hauled off-installation for commercial disposal?
Must be hauled off-installation for disposal
9.Who disconnects, defrosts and reconnects appliances?
Contractor will place and plug-in the appliances: refrigerator, and microwave.
10.Please confirm refrigerator weight
124lbs
11.Please confirm chair dimensions; are dimensions in inches?
W-18” x L-18” x H-40”
12.Are the microwaves separate from the Refrigerator/Freezer? Please confirm QTY
Yes, they are separated. 18 refrigerators, 18 microwaves.
13.Please confirm QTY of writing desks
2 writing desks in each room, total of 36.
14.Since BAVR requests must be submitted approximately two weeks in advance, please confirm that the actual performance start date will allow adequate time after award for contractor personnel to receive base-access approval.
The contract will be awarded in time to obtain base access.
15.Period of Performance & Execution Window (PWS 5.0 & 5.1): PWS Section 5.0 states that the start date and period of performance will be determined based on the renovation award schedule. Could the Government provide an estimated target start date, total performance duration (e.g., total calendar or working days allocated for the relocation across all 18 rooms)
The current start date is listed on page 9 of the solicitation. Exact dates are to be coordinated with the customer after award.
1.Pre-Bid Site Walkthrough (PWS 5.0): PWS Section 5.0 recommends a site survey. Will the
Government host an organized site walkthrough for prospective offerors prior to the quotation submission deadline of September 14, 2026, or is this site survey strictly intended for post-award coordination?
There will not be a site survey. The PWS has been updated accordingly.