26Q01390002 SF 30 Amendment.pdf

PDF 511 KB Posted

Attached to
Rubb Replacement Door and Install
Solicitation number
N0040626Q0139
Issued by

About this file

This is Standard Form 30 (SF 30), an Amendment of Solicitation/Modification of Contract document issued by the Naval Supply Fleet Logistics Center (NAVSUP FLT LOG CTR) Puget Sound, located in Bremerton, Washington. The amendment is numbered 0002 to solicitation N0040626Q00139, effective 08 May 2026, with an administered contracting office contact of Ashley Rollin (ashley.a.rollin.civ@us.navy.mil, 564-230-3001). The primary change extends the solicitation response due date from 11 May 2026 to 12 May 2026. The amendment also addresses questions and answers related to a door installation project, including site visit clarifications regarding door frame repairs, seal documentation, and operational usage.

The Questions and Answers section clarifies four key points: (1) regarding seal drawings or samples, the Government states it is currently unaware of the seal as it is not visible and references pictures; (2) concerning a damaged lower jamb observed during the site visit, the Government confirms it will be repaired prior to door installation; (3) regarding wall levelness and door operation impacts, the Government indicates the bottom left corner of the door frame was pushed in approximately 3 inches and will be repaired to bring the frame back to level; and (4) regarding door usage frequency, the Government states the door is opened 1 to 2 times per day maximum with an equal number of closures. Offerors must acknowledge receipt of this amendment prior to the extended deadline of 12 May 2026 by completing and returning the amendment, acknowledging receipt on offer copies, or submitting separate written communication referencing the solicitation and amendment numbers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On:

08 May 2026, 17:52 PM Greenwich Mean Time

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date 11 May 2026 12 May 2026

N0040626Q01390002

List of Contract Documents, Exhibits, or Attachments

Miscellaneous text in this section has been modified to:

Questions:

1) Can you provide the drawing or an existing sample of the seal, as is required for our procurement review and further processing?

a. Currently unaware of seal, as it is not visible - See pictures.

Site visit Q &A's:

2) During the site visit, I noticed that the lower jamb has been hit and is pushed in, making the opening not square. Is this something that will be fixed before we put the door in, or are we putting the door in with the jamb as is?

a. It will be fixed prior to install.

3) Has the wall been pushed out? Is it level? Will this affect the operation of the door?

a. The bottom left corner of the door frame was pushed in approx. 3 inches. When repaired it will bring back to level.

4) How many times is the door opened each day?

a. Door is opened 1 to 2 times per day max with same number of closures.

N0040626Q01390002

IDCode: J
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 08 May 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N00406
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR PUGET SOUND

PUGET SOUND (FISCPS), 467 W STREET

BREMERTON, WA 98314-5100

UNITED STATES

Ashley Rollin, Email: ashley.a.rollin.civ@us.navy.mil Telephone: 564-230-3001 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N0040626Q0139
SolDate: 29 Apr 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Continuation
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: This amendment has been issued to address questions and answers and extend the solicitation close date.