This is an amendment to a solicitation for submersible pumps and switch boxes. The Navy is procuring these products to support its operations. The amendment extends the response deadline to August 16th, 2023 and pushes out the delivery dates for all contract line items to September 30th, 2024. It also removes clause 52.211-9. The solicitation seeks a firm fixed price contract awarded based on technical acceptability, delivery date, past performance, and price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.1.1 23R0031 0001 SOL Amend.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This post-close amendment is issued to remove clause 52.211-9 and update the delivery schedule.
Administrative POC: Cassandra Allen cassandra.j.allen6.civ@us.navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040623R0031
X 9B. DATED (SEE ITEM 11)
15-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Aug-2023
CODE
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FLR
ATTN: CASSANDRA ALLEN
BREMERTON WA 98314
N00406 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0040623R0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION SF30 - CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Jul-2023 03:00 PM to 16-Aug-2023 03:00 PM.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
30-SEP-2023 12 N/A
FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
30-SEP-2024 12 N/A
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
CAGE
The following Delivery Schedule item for CLIN 0003 has been changed from:
CAGE
CAGE
The following Delivery Schedule item for CLIN 0004 has been changed from:
CAGE
30-SEP-2023 1 N/A
CAGE
30-SEP-2024 1 N/A
The following Delivery Schedule item for CLIN 0005 has been changed from:
CAGE
30-SEP-2023 1 N/A
CAGE
30-SEP-2024 1 N/A
The following have been deleted:
52.211-9 Desired and Required Time of Delivery JUN 1997
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
OFFER EVALUATION
Quotes will be evaluated under FAR 13.106-2 using comparative evaluation of price and other factors to determine which response represents the best value as a whole.
a. Quotes will be evaluated by performing a direct comparison of one offer with another in a uniform manner to determine which quote provides the government with its needs, as identified in the RFP. The government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the government. The Government has the discretion to accept other than the lowest priced quote that provides additional benefits.
b. The Government will award a firm fixed-price purchase order resulting from this solicitation to the vendor whose quote provides the best benefit to the government price and other factors considered. The following factors shall be used to evaluate quotes equally. No factor outweighs another factor for the evaluation methods.