N0040623Q0306 RFQ RAFT SERVICE.pdf
PDF 1 MB Posted
- Attached to
- LIFE RAFT INSPECTION AND REPAIRS
- Solicitation number
- N0040623Q0306
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0040623Q0306-0001 RFQ AMD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0040623Q0306 10-Feb-2023
b. TELEPHONE NUMBER
360-476-0820
8. OFFER DUE DATE/LOCAL TIME
09:00 AM 16 Feb 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N004069. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
FRANCINE MEESTER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N6874223RC00F2C
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FL
ATTN: FRANCINE MEESTER
BREMERTON WA 98314
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
360-4761115FAX:
TEL: 360-476-0820 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$41,500,000
NAICS:
488390
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF37
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0040623Q0306
Section SF 1449 - CONTINUATION SHEET
NOTICE TO OFFERORS
THIS IS A 100% SMALL BUSINESS SET ASIDE
NOTICE TO ALL OFFERORS: The Government anticipates awarding a firm, fixed price contract in response to quotes/proposals received to this solicitation. As a result, the contract's pricing will not be subject to any adjustment on the basis of the contractor's increased costs due to COVID-19 and/or inflationary causes experienced during contract performance. Because a firm, fixed price contract places the maximum risk and full responsibility for all costs and resulting profit or loss on the contractor, offerors are advised to consider these risks when pricing their quotes/proposals.
1. This solicitation is for the procurement of LIFE RAFT INSPECTIONS AND CERTIFICATION in support of CNRNW PORT OPERATIONS It is anticipated that this solicitation will result in an award of a Firm, Fixed-Price Service type contract. Payment will be via Government Purchase Card.
2. The entire solicitation shall be filled out, signed, and returned as part of your quote. See block 8 on page 1 of the solicitation for the closing date and time.
3. The deadline for submission of questions regarding the solicitation’s terms, conditions, specifications, and/or the statement of work (SOW) / performance work statement (PWS) is 2 days prior to the solicitation’s closing date. All questions regarding this solicitation shall be submitted in writing via email to:
NAVSUP Fleet Logistics Center, Puget Sound Purchasing Agent, Francine Meester Regional Contracting Department E-Mail: francine.a.meester.civ@us.navy.mil
4. Award will be made to the quote/offer that represents the best value to the Government. Note: the Government reserves the right to consider the past performance of all quotes/offers, conduct a price, past performance tradeoff, and award to other than the lowest price quote/offer.
5. SINGLE AWARD FOR ALL ITEMS: Due to the interrelationship of supplies and/or services to be provided hereunder, the Government reserves the right to make a single award to the quoter whose quote is considered in the best interest of the government, price and other factors considered. Therefore, quoters who quote less than the entire effort specified herein may be determined to be unacceptable.
6. “EXCEPTIONS: All quoters MUST note all exceptions from the solicitation’s terms conditions, specifications, and/or the statement of work / performance work statement, if any. It will be assumed that any quote without mention of any exceptions will take no exception from all specifications, terms and conditions, clauses, or provisions within the solicitation.”
7. Place of Performance: Bremerton WA 98314
8. REQUIRED INFORMATION:
ADDITIONAL INFORMATION
Company Name:
POC:
Phone:
Email:
CAGE Code:
UEI:
Business Size:
Payment Terms:
For Services – Period of Performance:
9. Department of Labor Wage Determination for Awardee location will be incorporated by reference.
YOUR COMPANY MUST BE REGISTERED WITH **SAM** (SYSTEM AWARD FOR
MANAGEMENT** IN ORDER TO RECEIVE A GOVERNMENT AWARD
PERFORMANCE WORK STATEMENT
Performance Work Statement
Inspection & Certification of Life Rafts CNRNW Port Operations Department
Type of life rafts to be inspected: Commercial type, Manufacturer is Elliot, 25 man rafts are MKIII & MKIV both with the Solas “A” survival package and the 50 man rafts are MK I with the Solas “A” package and MK IV with the IBA survival package.
Age of the life rafts: 25 man life rafts range from September 2001 to April 2010. 50 man life rafts range from April 2002 to April 2010.
Number of life rafts to be inspected per year will be a minimum of 16. Seven (7) 50-man life rafts and nine (9) 25-man life rafts. There is a total of 21 life rafts on hand.
Inspection and Certification: The Vendor will need to comply with the following regulations in the inspection and certification of commercial life rafts. In accordance with 46 CFR Ch.1 (10-1- 97 edition), 160.151-35 Servicing, inspection and repair. Inflatable life rafts must be inspected by a facility approved by the US Coast guard. Life rafts may require an inspection, repairs, and repackaging, before the inspection/certification is deemed complete.
Requirements: The following is a condensed list of yearly servicing inspections as per 46 CFR Ch.1 (10-1-97 edition), 160.151-57, Servicing, inspecting and repair procedures.
1. The working pressure leakage test described in IMO Resolution A.689 (17), Paragraph 2/5.1.5, must be conducted.
2. Inflation hoses must be pressurized and checked for damage as part of the working-pressure leakage test, or in a separate test.
3. An inflatable floor must be inflated until it is firm, and let stand for one hour. The inflatable floor must still be firm at the end of the hour.
4. The seams connecting the floor to the buoyancy tube must be checked for Slippage, rupture, and lifting of seams.
5. Each item of survival equipment must be examined, and-
A. Replaced if its expiration date has passed and otherwise be replaced if it is damaged or unserviceable.
6. Each battery must be replaced with a fresh one if its expiration date has passed, if it has no expiration date, or its measured voltage is less than its rated voltage.
7. Each power cell for the top and inside canopy lights must be inspected and tested as prescribed in the servicing manual unless it is a battery serviced in accordance with item 6, above. Each cell that is tested and found satisfactory may be reinstalled. Each cell that is outdated, is not tested, or fails the test must be replaced.
8. Life rafts are not equipped with EPIRB’s or SART’s. So no inspection is required for those.
9. The manual inflation-pump must be tested for proper operation.
10. Damaged, faded, or incorrect instruction label or identification label on the life raft or its container must be replaced.
11. Each life raft must be examined to ensure that it is properly marked with retro reflective material. Damaged or missing retro reflective material must be replaced with Type I material approved under part 164, subpart 164.018, as complying with SOLAS.
12. Each inflatable cylinder must be weighed. If its weight loss exceeds five percent of the weight of the charge, it must be recharged.
A. When an inflation cylinder is recharged for any reason, the following inflation-head components must be renewed.
1. The poppet-pin assembly, if any
2. Each plastic, or elastomeric seal, and each other part that deteriorates with age
B. Each recharged inflation cylinder must be checked for leakage.
C. Each inflation cylinder that requires a hydrostatic test under 49 CFR 173.34 must be tested and marked in accordance with that section. Recommended to be changed yearly since it’s to be changed every 2 years from manufacture date.
D. Every second servicing of a davit-launched life raft, the launching load test must be conducted.
13. At every fifth annual servicing, each life raft must be removed from its container and, while still folded, inflated by the operation of its gas inflation system.
A. Each life raft showing minor leaks during the gas-inflation tested, maybe repaired.
B. Each life raft ten or more years past its date of manufacture must be condemned if it leaks extensively, or shows fabric damage other than minor porosity, during the gas inflation test conducted.
C. At each annual servicing of a life raft ten or more years past its date of manufacture during which the gas-inflation test is not conducted, a NAP test must be conducted.
D. At each annual servicing of a life raft ten or more years past its date of manufacture, the integrity of the seams connecting the floor to the buoyancy tube must be checked.
14. The servicing facility must complete the following for each life raft that passes these inspections and tests:
A. Permanently mark the life raft on its outside canopy, or on a servicing record panel on an interior portion of one of its buoyancy tubes near an entrance with:
1. The date of servicing
2. The identification and location of the servicing facility
3. If applicable, an indication that the special fifth year servicing was performed.
B. Permanently and legibly mark on the identification device provided, the name of vessel, or the name of the owner. (Navy Region Northwest)
C. Affix an inspection sticker to the life raft container. The sticker must be the type that can remain legible for at least 2 years when exposed to a marine environment, and that cannot be removed without being destroyed. The sticker must be 4 X 6 inches with the last digit of the year of expiration superimposed over a background color. The sticker must also contain the following:
1. The name of the manufacturer of the life raft
2. The year and month of expiration.
3. Identification of the servicing facility.
4. The expiration date of the servicing sticker is 12 months after the date the life raft was repacked.
15. The servicing facility must keep a record of each life raft approved by the Coast Guard that it services for at least five years and must make those records available to the Coast guard upon request. As life rafts get older, and especially after the five year point, more inspections maybe required and more materials connected with the life raft may need to be replaced due to their age.
Suggest calling out these items as separate line items that may need to be added to the task order.
Every year (Annual Requirements) all life rafts need to have the following:
Recertification inspection Re-inspection certificate Bursting straps, 8 each Do not cut tape, 8 each Repair cement, 1 each Flashlight batteries, 6 each Container labels Required materials to be added: The following materials pertaining to the life rafts will need to be replaced as per the Periodicity shown below.
Every two years all life rafts require:
A hydrostatic release, 1 each
25 Man Life Raft Requirements
Every three years, 25 man life rafts require:
Replace 6 red hand flares estimated Replace 4 each parachute flares Replace 2 each Orange smoke flares
Every four years, 25 man life rafts require:
Same as two year requirement
Every five years, 25 man life rafts require:
Service/Hydro, refill and leak test CO2 cylinder Brass burst disc, 1 each CO2 inflation hose, 1 each Lithium batteries, 3 each Food rations, 25 each Drinking water, 300 each of 125 ml package Replace all other dated items
Every six years, 25 man life rafts require:
Same as two and three year requirements
Every seven years, 25 man life rafts require:
Same as the annual requirements
Every eight years, 25 man life rafts require:
Same as the two year requirement
Every nine years, 25 man life rafts require:
Thanner DK88 operating head, 1 each Also include the three year requirements
Every ten years, 25 man life rafts require:
Same as two and five year requirements
Every eleven years, 25 man life rafts require:
Same as annual requirements
Every twelve years, 25 man life rafts require:
Same as two and three year requirements
Every thirteen years, 25 man life raft require:
Same as the annual requirements
Every fourteen years, 25 man life rafts require:
Same as the two year requirements
Every fifteen years, 25 man life rafts require:
Same as the three and five year requirements
Every sixteen years, 25 man life rafts require:
Same as the two year requirements
Every seventeen years, 25 man life raft require:
Same as the annual requirements
Every eighteen years, 25 man life rafts require:
Same as the two and three year requirements
50 Man Life Raft Requirements
Every three years, 50 man life rafts require:
Same as the annual requirements
Every four years, 50 man life rafts require:
Same as two year requirements
Every five years, 50 man life rafts require:
Service/Hydro, refill and leak test CO2 cylinder Brass burst disc, 2 each CO2 inflation hose, 2 each Lithium batteries, 2 each Replace all other dated items
Every six years, 50 man life rafts require:
Same as two and three year requirements
Every seven years, 50 man life rafts require:
Same as the annual requirements
Every eight years, 50 man life rafts require:
Same as the two year requirements Every nine years, 50 man life rafts require:
Thanner DK88 operating head, 2 each
Every ten years, 50 man life rafts require:
Same as the two and five year requirements
Every eleven years, 50 man life rafts require:
Same as the annual requirements
Every twelve years, 50 man life rafts require:
Same as the two year requirements
Every thirteen years, 50 man life raft require:
Same as the annual requirements
Every fourteen years, 50 man life rafts require:
Same as the two year requirements Every fifteen years, 50 man life rafts require:
Same as the three and five year requirements
Every sixteen years, 50 man life rafts require:
Same as the two year requirements
Every seventeen years, 50 man life raft require:
Same as the annual requirements
Period of performance: Required 14 day turn around for the servicing/repair.
Pick up & delivery of Life Rafts: Request vendor to pick up the life raft & deliver it back to Naval Base Kitsap upon completion of certification. Life rafts to be shipped as freight due to the CO2 bottles and flares installed in the life raft, as they are considered hazmat/explosives. Due to the hazmat involved with the life rafts they must be shipped as freight by a trucking company.
Request ability to add and subtract the life rafts (listed by serial number) as needed. In obtaining new Tugboats they will come with brand new life rafts which may cause us to delete some of the older ones from our boats.
LIFE RAFT NUMBERS
25 MAN RAFTS (10EA) 50 MAN RAFTS (9 EA)
LIFE RAFT NUMBERS MANUF YEAR LIFE RAFT NUMBERS MANUF YEAR
P-5001 APR 2002 MKIII P-9274 SEPT 2009 MK I
S-0229 AUG 2005 MKIII P-9340 APR 2010 MK I
S-2035 AUG 2006 MKIII
S-2030 JUL 2006 MKIII 5241310101503 APR 2020 MK4 IBA
B-01593 SEPT 2009 MKIII 5241310101507 APR 2020 MK4 IBA
5241310101453 APR 2020 MK4 IBA
5086310224979 JAN 2021 MK4 SOLAS A 5241310101535 APR 2020 MK4 IBA
5086310501013 JAN 2021 MK4 SOLAS A 5241310101496 APR 2020 MK4 IBA
5086310501417 OCT 2021 MK4 SOLAS A 5241310101630 APR 2020 MK4 IBA
5086310501414 OCT 2021 MK4 SOLAS A 5241310101609 APR 2021 MK4 IBA
5086310500938 OCT 2021 MK4 SOLAS A 1 MORE TBD MK4 IBA
1 MORE TBD MK4 SOLAS A
21 (PROJECTED) TOTAL RAFTS
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 7 Each
LIFE RAFT SERVICE 25 PERSON RAFTS
FFP
BASE YEAR 18 MAR 2023 TO 17 MAR 2024
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
FOB: Destination
MILSTRIP: N6874223RC00F2C
PURCHASE REQUEST NUMBER: N6874223RC00F2C
PSC CD: H319
NET AMT
0002 7 Each
LIFE RAFT SERVICE REPORT, 25 PERSON RAFT
FFP
BASE YEAR 18 MAR 2023 TO 17 MAR 2024
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(1 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
FOB: Destination
MILSTRIP: N6874223RC00F2C
0003 1 Group
LIFE RAFT SERVICE PARTS, 25 PERSON RAFTS
FFP
BASE YEAR 18 MAR 2023 TO 17 MAR 2024
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
FOB: Destination
MILSTRIP: N6874223RC00F2C
0004 4 Each
LIFE RAFT SERVICE, 50 PERSON RAFTS
FFP
BASE YEAR 18 MAR 2023 TO 17 MAR 2024
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
FOB: Destination
MILSTRIP: N6874223RC00F2C
0005 4 Each
LIFE RAFT SERVICE REPORT, 50 PERSON RAFT
FFP
BASE YEAR 18 MAR 2023 TO 17 MAR 2024
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(01 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
FOB: Destination
MILSTRIP: N6874223RC00F2C
0006 1 Group
LIFE RAFT SERVICE PARTS, 50 PERSON RAFTS
FFP
BASE YEAR 18 MAR 2023 TO 17 MAR 2024
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
FOB: Destination
MILSTRIP: N6874223RC00F2C
1001 7 Each
OPTION LIFE RAFT SERVICE, 25 PERSON RAFTS
FFP
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
FOB: Destination
1002 7 Each
OPTION LIFE RAFT SERVICE REPORT, 25 PERSON RAFT
FFP
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(1 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
1003 1 Group
OPTION LIFE RAFT SERVICE PARTS, 25 PERSON RAFTS
FFP
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
1004 4 Each
OPTION LIFE RAFT SERVICE, 50 PERSON RAFTS
FFP
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
1005 4 Each
OPTION LIFE RAFT SERVICE REPORT, 50 PERSON RAFT
FFP
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(01 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
1006 1 Group
OPTION LIFE RAFT SERVICE PARTS, 50 PERSON RAFTS
FFP
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
2001 7 Each
OPTION LIFE RAFT SERVICE, 25 PERSON RAFTS
FFP
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
2002 7 Each
OPTION LIFE RAFT SERVICE REPORT, 25 PERSON RAFT
FFP
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(1 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
2003 1 Group
OPTION LIFE RAFT SERVICE PARTS, 25 PERSON RAFTS
FFP
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
2004 4 Each
OPTION LIFE RAFT SERVICE, 50 PERSON RAFTS
FFP
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
2005 4 Each
OPTION LIFE RAFT SERVICE REPORT, 50 PERSON RAFT
FFP
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(01 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
2006 1 Group
OPTION LIFE RAFT SERVICE PARTS, 50 PERSON RAFTS
FFP
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
3001 7 Each
OPTION LIFE RAFT SERVICE, 25 PERSON RAFTS
FFP
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
3002 7 Each
OPTION LIFE RAFT SERVICE REPORT, 25 PERSON RAFT
FFP
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(1 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
3003 1 Group
OPTION LIFE RAFT SERVICE PARTS, 25 PERSON RAFTS
FFP
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
3004 4 Each
OPTION LIFE RAFT SERVICE, 50 PERSON RAFTS
FFP
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
3005 4 Each
OPTION LIFE RAFT SERVICE REPORT, 50 PERSON RAFT
FFP
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(01 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
3006 1 Group
OPTION LIFE RAFT SERVICE PARTS, 50 PERSON RAFTS
FFP
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
4001 7 Each
OPTION LIFE RAFT SERVICE, 25 PERSON RAFTS
FFP
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
4002 7 Each
OPTION LIFE RAFT SERVICE REPORT, 25 PERSON RAFT
FFP
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(1 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
4003 1 Group
OPTION LIFE RAFT SERVICE PARTS, 25 PERSON RAFTS
FFP
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
4004 4 Each
OPTION LIFE RAFT SERVICE, 50 PERSON RAFTS
FFP
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028
INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE
50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED),
160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE
PERFORMANCE WORK STATEMENT ABOVE.
4005 4 Each
OPTION LIFE RAFT SERVICE REPORT, 50 PERSON RAFT
FFP
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028
AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND REPORT
WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL
REQUIRED TO BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1
(01 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND
REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
4006 1 Group
OPTION LIFE RAFT SERVICE PARTS, 50 PERSON RAFTS
FFP
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028
BASED ON THE AS FOUND REPORT, THE REPAIR AND REPLACEMENT
PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50
PERSON LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97
ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR.
SEE PERFORMANCE WORK STATEMENT ABOVE.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 4001 Destination Government Destination Government
4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 18-MAR-2023 TO
17-MAR-2024
N/A N/A
0002 POP 18-MAR-2023 TO
17-MAR-2024
0003 POP 18-MAR-2023 TO
0004 POP 18-MAR-2023 TO
0005 POP 18-MAR-2023 TO
0006 POP 18-MAR-2023 TO
1001 POP 18-MAR-2024 TO
17-MAR-2025
1002 POP 18-MAR-2024 TO
1003 POP 18-MAR-2024 TO
1004 POP 18-MAR-2024 TO
1005 POP 18-MAR-2024 TO
1006 POP 18-MAR-2024 TO
2001 POP 18-MAR-2025 TO
17-MAR-2026
2002 POP 18-MAR-2025 TO
2003 POP 18-MAR-2025 TO
2004 POP 18-MAR-2025 TO
2005 POP 18-MAR-2025 TO
2006 POP 18-MAR-2025 TO
3001 POP 18-MAR-2026 TO
17-MAR-2027
3002 POP 18-MAR-2026 TO
3003 POP 18-MAR-2026 TO
3004 POP 18-MAR-2026 TO
3005 POP 18-MAR-2026 TO
3006 POP 18-MAR-2026 TO
4001 POP 18-MAR-2027 TO
17-MAR-2028
4002 POP 18-MAR-2027 TO
4003 POP 18-MAR-2027 TO
4004 POP 18-MAR-2027 TO
4005 POP 18-MAR-2027 TO
4006 POP 18-MAR-2027 TO
CLAUSES INCORPORATED BY REFERENCE
52.203-18 Prohibition on Contracting With Entities That Require Certain
Internal Confidentiality Agreements or Statements-- Representation
JAN 2017
52.204-2 Security Requirements MAR 2021 52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-17 Ownership or Control of Offeror AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
NOV 2021
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation
NOV 2015
52.212-1 Instructions to Offerors--Commercial Products and Commercial Services
NOV 2021
52.212-3 Alt I Offeror Representations and Certifications--Commercial Products and Commercial Services (DEC 2022) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
DEC 2022
52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
JUN 2020
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
NOV 2021
52.247-34 F.O.B. Destination NOV 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
SEP 2022
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.204-7020 NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.225-7048 Export-Controlled Items JUN 2013
252.225-7055 Representation Regarding Business Operations with the Maduro Regime
MAY 2022
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime
MAY 2022
252.232-7010 Levies on Contract Payments DEC 2006 252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
DEC 2022
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items DEC 2022 252.246-7003 Notification of Potential Safety Issues JUN 2013 252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2021)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
XXX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.
109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
XXX (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).
____ (ii) Alternate I (MAR 2020) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (MAR 2020) of 52.219-4.
____ (13) [Reserved]
XXX (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (JUN 2020) of 52.219-9.
____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
____ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).
XXX (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (NOV 2020) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).
____ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).
____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).
XX (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
XX (28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).
XX (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
XX (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
XX (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
XX (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
XX (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
XX (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
XX (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (48) 52.225-1, Buy American--Supplies (JAN 2021) (41 U.S.C. chapter 83).
____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (JAN 2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (JAN 2021) of 52.225-3.
____ (iii) Alternate II (JAN 2021) of 52.225-3.
____ (iv) Alternate III (JAN 2021) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
XX (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
____ (55) 52.229-12, Tax on Certain Foreign Procurements (JUN 2020).
____ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C. 3332).
____ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).
XX (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
____ (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
____ (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (APR 2003) of 52.247-64.
____ (iii) Alternate II (FEB 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
XX (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
XX (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67). Added separately in the contract due to the Option Years
_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
XX (7) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020) (E.O. 13658).
_____ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
(xi) 52.222-40,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .