N0040623Q0306-0001 RFQ AMD.pdf
PDF 443 KB Posted
- Attached to
- LIFE RAFT INSPECTION AND REPAIRS
- Solicitation number
- N0040623Q0306
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0040623Q0306 RFQ RAFT SERVICE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6874223RC00F2C
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to update the quantities and descriptions on all CLINS, update page 1 of the Performance Work Statement and to extend the closing date to 22 February 2023 . No other changes have been made.
NAVSUP FLC Puget Sound POc for contract administration:
Ms. Frankie Meesterm francine.a.meester.civ@us.navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 18
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Feb-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040623Q0306
X 9B. DATED (SEE ITEM 11)
10-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Feb-2023
CODE
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FL
ATTN: FRANCINE MEESTER
BREMERTON WA 98314
N00406 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0040623Q0306
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-Feb-2023 09:00 AM to 22-Feb-2023 09:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
BASE YEAR 18 MAR 2023 TO 17 MAR 2024INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED), 160.151 35
AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE PERFORMANCE WORK STATEMENT
ABOVE.
To:
BASE YEAR 18 MAR 2023 TO 17 MAR 2024SEE PERFORMANCE WORK STATEMENT ABOVE.
The pricing detail quantity has increased by 2.00 from 7.00 to 9.00.
CLIN 0002
BASE YEAR 18 MAR 2023 TO 17 MAR 2024AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND
REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO BRING
THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1 (1 OCT 97 ED), 160.151 35 AND 160.151 57 SERVICING, INSPECTION AND REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
CLIN 0003
BASE YEAR 18 MAR 2023 TO 17 MAR 2024BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25 PERSON
LIFE RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED), 160.151 35 AND 160.151 57
SERVICING, INSPECTION AND REPAIR. SEE PERFORMANCE WORK STATEMENT ABOVE.
CLIN 0004
The pricing detail quantity has increased by 3.00 from 4.00 to 7.00.
CLIN 0005
BASE YEAR 18 MAR 2023 TO 17 MAR 2024AS A RESULT OF THE INSPECTIONS DONE, AN AS FOUND
REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO BRING
THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1 (01 OCT 97 ED), 160.151 35 AND 160.151 57
CLIN 0006
BASE YEAR 18 MAR 2023 TO 17 MAR 2024BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50 PERSON
CLIN 1001
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED), 160.151 35
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025ISEE PERFORMANCE WORK STATEMENT ABOVE.
CLIN 1002
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1 (1 OCT 97 ED), 160.151 35 AND 160.151 57
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025SEE PERFORMANCE WORK STATEMENT ABOVE.
CLIN 1003
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25 PERSON
CLIN 1004
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED), 160.151 35
CLIN 1005
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
BRING THE RAFTS IN COMPLIANCE WITH 46 CFR CH. 1 (01 OCT 97 ED), 160.151 35 AND 160.151 57
CLIN 1006
OPTION YEAR 1 18 MAR 2024 TO 17 MAR 2025BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50 PERSON
CLIN 2001
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED), 160.151 35
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026SEE PERFORMANCE WORK STATEMENT ABOVE.
CLIN 2002
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
CLIN 2003
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25 PERSON
CLIN 2004
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED), 160.151 35
CLIN 2005
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
CLIN 2006
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50 PERSON
CLIN 3001
OPTION YEAR 2 18 MAR 2025 TO 17 MAR 2026INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED), 160.151 35
CLIN 3002
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027SEE PERFORMANCE WORK STATEMENT ABOVE.
CLIN 3003
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25 PERSON
CLIN 3004
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED), 160.151 35
CLIN 3005
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
CLIN 3006
OPTION YEAR 3 18 MAR 2026 TO 17 MAR 2027BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50 PERSON
CLIN 4001
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 25 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (1 OCT 97 ED), 160.151 35
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028SEE PERFORMANCE WORK STATEMENT ABOVE.
CLIN 4002
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
CLIN 4003
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 25 PERSON
CLIN 4004
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028INSPECT, RECERTIFICATION AND REPACK OF ELLIOT SOLAS A TYPE 50 PERSON RAFTS IN ACCORDANCE WITH 46 CFR CH. 1 (01 OCT 97 ED), 160.151 35
CLIN 4005
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028AS A RESULT OF THE INSPECTIONS DONE, AN AS
FOUND REPORT WILL BE PREPARED THAT ITEMIZES THE PARTS AND MATERIAL REQUIRED TO
CLIN 4006
OPTION YEAR 4 18 MAR 2027 TO 17 MAR 2028BASED ON THE AS FOUND REPORT, THE REPAIR AND
REPLACEMENT PARTS AND MATERIALS REQUIRED FOR RECERTIFICATION OF THE 50 PERSON
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
N/A N/A
FOB: Destination
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
The following Delivery Schedule item for CLIN 0004 has been changed from:
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
The following Delivery Schedule item for CLIN 0005 has been changed from:
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
CAGE
POP 18-MAR-2023 TO
17-MAR-2024
The following have been modified:
PERFORMANCE WORK STATEMENT
Performance Work Statement
Inspection & Certification of Life Rafts CNRNW Port Operations Department
Type of life rafts to be inspected: Commercial type, Manufacturer is Elliot, 25 man rafts are MKIII & MKIV both with the Solas “A” survival package and the 50 man rafts are MK I with the Solas “A” package and MK IV with the IBA survival package.
Age of the life rafts: 25 man life rafts range from September 2001 to April 2010. 50 man life rafts range from April 2002 to April 2010.
Number of life rafts to be inspected per year will be a minimum of 16. Seven (7) 50-man life rafts and nine (9) 25-man life rafts. There is a total of 21 life rafts on hand but not all rafts may be serviced.
Inspection and Certification: The Vendor will need to comply with the following regulations in the inspection and certification of commercial life rafts. In accordance with 46 CFR Ch.1 (10-1- 97 edition), 160.151-35 Servicing, inspection and repair. Inflatable life rafts must be inspected by a facility approved by the US Coast guard. Life rafts may require an inspection, repairs, and repackaging, before the inspection/certification is deemed complete.
Requirements: The following is a condensed list of yearly servicing inspections as per 46 CFR Ch.1 (10-1-97 edition), 160.151-57, Servicing, inspecting and repair procedures.
1. The working pressure leakage test described in IMO Resolution A.689 (17), Paragraph 2/5.1.5, must be conducted.
2. Inflation hoses must be pressurized and checked for damage as part of the working-pressure leakage test, or in a separate test.
3. An inflatable floor must be inflated until it is firm, and let stand for one hour. The inflatable floor must still be firm at the end of the hour.
4. The seams connecting the floor to the buoyancy tube must be checked for Slippage, rupture, and lifting of seams.
5. Each item of survival equipment must be examined, and-
A. Replaced if its expiration date has passed and otherwise be replaced if it is damaged or unserviceable.
6. Each battery must be replaced with a fresh one if its expiration date has passed, if it has no expiration date, or its measured voltage is less than its rated voltage.
7. Each power cell for the top and inside canopy lights must be inspected and tested as prescribed in the servicing manual unless it is a battery serviced in accordance with item 6, above. Each cell that is tested and found satisfactory may be reinstalled. Each cell that is outdated, is not tested, or fails the test must be replaced.
8. Life rafts are not equipped with EPIRB’s or SART’s. So no inspection is required for those.
9. The manual inflation-pump must be tested for proper operation.
10. Damaged, faded, or incorrect instruction label or identification label on the life raft or its container must be replaced.
11. Each life raft must be examined to ensure that it is properly marked with retro reflective material. Damaged or missing retro reflective material must be replaced with Type I material approved under part 164, subpart 164.018, as complying with SOLAS.
12. Each inflatable cylinder must be weighed. If its weight loss exceeds five percent of the weight of the charge, it must be recharged.
A. When an inflation cylinder is recharged for any reason, the following inflation-head components must be renewed.
1. The poppet-pin assembly, if any
2. Each plastic, or elastomeric seal, and each other part that deteriorates with age
B. Each recharged inflation cylinder must be checked for leakage.
C. Each inflation cylinder that requires a hydrostatic test under 49 CFR 173.34 must be tested and marked in accordance with that section. Recommended to be changed yearly since it’s to be changed every 2 years from manufacture date.
D. Every second servicing of a davit-launched life raft, the launching load test must be conducted.
13. At every fifth annual servicing, each life raft must be removed from its container and, while still folded, inflated by the operation of its gas inflation system.
A. Each life raft showing minor leaks during the gas-inflation tested, maybe repaired.
B. Each life raft ten or more years past its date of manufacture must be condemned if it leaks extensively, or shows fabric damage other than minor porosity, during the gas inflation test conducted.
C. At each annual servicing of a life raft ten or more years past its date of manufacture during which the gas-inflation test is not conducted, a NAP test must be conducted.
D. At each annual servicing of a life raft ten or more years past its date of manufacture, the integrity of the seams connecting the floor to the buoyancy tube must be checked.
14. The servicing facility must complete the following for each life raft that passes these inspections and tests:
A. Permanently mark the life raft on its outside canopy, or on a servicing record panel on an interior portion of one of its buoyancy tubes near an entrance with:
1. The date of servicing
2. The identification and location of the servicing facility
3. If applicable, an indication that the special fifth year servicing was performed.
B. Permanently and legibly mark on the identification device provided, the name of vessel, or the name of the owner. (Navy Region Northwest)
C. Affix an inspection sticker to the life raft container. The sticker must be the type that can remain legible for at least 2 years when exposed to a marine environment, and that cannot be removed without being destroyed. The sticker must be 4 X 6 inches with the last digit of the year of expiration superimposed over a background color. The sticker must also contain the following:
1. The name of the manufacturer of the life raft
2. The year and month of expiration.
3. Identification of the servicing facility.
4. The expiration date of the servicing sticker is 12 months after the date the life raft was repacked.
15. The servicing facility must keep a record of each life raft approved by the Coast Guard that it services for at least five years and must make those records available to the Coast guard upon request. As life rafts get older, and especially after the five year point, more inspections maybe required and more materials connected with the life raft may need to be replaced due to their age.
Suggest calling out these items as separate line items that may need to be added to the task order.
Every year (Annual Requirements) all life rafts need to have the following:
Recertification inspection Re-inspection certificate
Bursting straps, 8 each Do not cut tape, 8 each Repair cement, 1 each Flashlight batteries, 6 each Container labels Required materials to be added: The following materials pertaining to the life rafts will need to be replaced as per the Periodicity shown below.
Every two years all life rafts require:
A hydrostatic release, 1 each
25 Man Life Raft Requirements
Every three years, 25 man life rafts require:
Replace 6 red hand flares estimated Replace 4 each parachute flares Replace 2 each Orange smoke flares
Every four years, 25 man life rafts require:
Same as two year requirement
Every five years, 25 man life rafts require:
Service/Hydro, refill and leak test CO2 cylinder Brass burst disc, 1 each CO2 inflation hose, 1 each Lithium batteries, 3 each Food rations, 25 each Drinking water, 300 each of 125 ml package Replace all other dated items
Every six years, 25 man life rafts require:
Same as two and three year requirements
Every seven years, 25 man life rafts require:
Same as the annual requirements
Every eight years, 25 man life rafts require:
Same as the two year requirement
Every nine years, 25 man life rafts require:
Thanner DK88 operating head, 1 each Also include the three year requirements
Every ten years, 25 man life rafts require:
Same as two and five year requirements
Every eleven years, 25 man life rafts require:
Same as annual requirements
Every twelve years, 25 man life rafts require:
Same as two and three year requirements
Every thirteen years, 25 man life raft require:
Same as the annual requirements
Every fourteen years, 25 man life rafts require:
Same as the two year requirements
Every fifteen years, 25 man life rafts require:
Same as the three and five year requirements
Every sixteen years, 25 man life rafts require:
Same as the two year requirements
Every seventeen years, 25 man life raft require:
Same as the annual requirements
Every eighteen years, 25 man life rafts require:
Same as the two and three year requirements
50 Man Life Raft Requirements
Every three years, 50 man life rafts require:
Same as the annual requirements
Every four years, 50 man life rafts require:
Same as two year requirements
Every five years, 50 man life rafts require:
Service/Hydro, refill and leak test CO2 cylinder Brass burst disc, 2 each CO2 inflation hose, 2 each Lithium batteries, 2 each Replace all other dated items
Every six years, 50 man life rafts require:
Same as two and three year requirements
Every seven years, 50 man life rafts require:
Same as the annual requirements
Every eight years, 50 man life rafts require:
Same as the two year requirements Every nine years, 50 man life rafts require:
Thanner DK88 operating head, 2 each
Every ten years, 50 man life rafts require:
Same as the two and five year requirements
Every eleven years, 50 man life rafts require:
Same as the annual requirements
Every twelve years, 50 man life rafts require:
Same as the two year requirements
Every thirteen years, 50 man life raft require:
Same as the annual requirements
Every fourteen years, 50 man life rafts require:
Same as the two year requirements Every fifteen years, 50 man life rafts require:
Same as the three and five year requirements
Every sixteen years, 50 man life rafts require:
Same as the two year requirements
Every seventeen years, 50 man life raft require:
Same as the annual requirements
Period of performance: Required 14 day turn around for the servicing/repair.
Pick up & delivery of Life Rafts: Request vendor to pick up the life raft & deliver it back to Naval Base Kitsap upon completion of certification. Life rafts to be shipped as freight due to the CO2 bottles and flares installed in the life raft, as they are considered hazmat/explosives. Due to the hazmat involved with the life rafts they must be shipped as freight by a trucking company.
Request ability to add and subtract the life rafts (listed by serial number) as needed. In obtaining new Tugboats they will come with brand new life rafts which may cause us to delete some of the older ones from our boats.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .