This is Amendment 0002 to Solicitation N0038326RA051, a Basic Ordering Agreement (BOA) issued by NAVSUP Weapon Systems Support in Philadelphia, PA with an effective date of March 30, 2026. The amendment updates the ordering period from July 1, 2026 through July 1, 2031 to July 1, 2026 through June 30, 2031, and removes SubCLIN 0002 for spares procurement. The BOA covers repairs and modifications of Government Furnished Property (GFP) for F-18, E-2/C-2, V-22, and FMS systems, along with spare parts support. The contractor must furnish all labor, materials, facilities, and effort required to return repairable assemblies to Ready For Issue (RFI) condition in accordance with applicable repair specifications and statements of work. The contractor is responsible for supplying all parts and materials unless specifically identified as Government Furnished Material on Attachment A, and must maintain control systems for purchased parts with receiving inspection requirements. All repairs must comply with approved drawings, specifications, and repair manuals, with Government approval required for any changes to repair sources or facilities. The BOA includes provisions for Beyond Physical Repair (BPR), Beyond Economical Repair (BER), Missing on Induction (MOI), and SRA swapping procedures, all requiring Defense Contract Management Agency (DCMA) concurrence and Government disposition instructions. Orders under the BOA are binding upon issuance with firm-fixed pricing, with unpriced orders subject to monetary limitation or ceiling-priced procedures under FAR and DFARS regulations. Government inspection and acceptance testing will be conducted by DCMA Quality Assurance Representatives in accordance with FAR 52.246-2. The contractor must submit qualified proposals for definitization within 30 days of receiving Government property for repair orders. The amendment also modifies sections addressing specifications, inspection provisions, contract administration, contract clauses, and representations and certifications, including updated requirements for ISO 9001 compliance, Wide Area WorkFlow (WAWF) payment instructions, contract definitization procedures, and annual representations and certifications. The contractor is classified as a large business based on the 1,250 employee size standard for NAICS code 336413.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Ordering Period updated from [July 1, 2026 - July 1, 2031] to [July 1, 2026 - June 30, 2031].

Block 14 (Description of Amendment/Modification): The purpose of this amendment is to update the following:

Section B - Supplies or Services & Prices or Costs Remove SubCLIN 0002 Section C - Description/Specifications/Statement of work

FAR 52.246-11

DFARS 252.232-7006

DFARS 252.217-7027

Section J

FAR 52.204-8

FAR 52.211-14

FAR 52.216-1

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Size Standard - Employees

N0038326RA0510002

Section B - Supplies or Services & Prices or Costs

Miscellaneous text in this section has been modified to:

This is a Basic Ordering Agreement (BOA) with TBD. The terms and conditions in this BOA apply to all orders issued hereunder. The Government may order, in the manner provided elsewhere herein, the following:

(a) :Repairs and/or Modifications of Government Property

(1) The Government may order, in the manner provided elsewhere herein, and the contractor shall furnish all effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of repairable assemblies (hereinafter repairable assemblies or items) in the F-18, E-2/C-2, V-22, FMS System. The repairable assemblies to be repaired and/or modified under this BOA are set forth by manufacturer's part number or National Stock Number (NSN) in Attachment "A" and constitute "Government Property" as defined in FAR 52.245-1 or 52.245-1 Alternate I, as applicable, of this BOA. Repair and/or modification of repairable assemblies will be accomplished in accordance with the Specifications for Repair/Modification/Statement of Work.

(2) Web-based Commercial Asset Visibility (WEBCAV) Reporting: The Contractor's effort on each Order for repair and/or modification of government property shall include furnishing all effort including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions.

(b) :Spares

(1) The Government may order, in the manner provided elsewhere herein, and the contractor shall furnish items as may be required to support the F-18, E-2/C-2, V-22, FMS System.

(a) Priced orders under this BOA shall be those in which the contractor submits a firm-fixed price quote, offer, or proposal, and delivery schedule in response to a Request for Quotation (RFQ) or Request for Proposal (RFP), and all terms and conditions have been agreed upon prior to issuance of the order, including: (i) with respect to Orders for repair, the pricing for Teardown and Evaluation (TD&E) and repair of government furnished property; and (ii) with respect to all Orders, delivery.

(a) Unpriced orders under this BOA shall be those in which urgency exists that does not allow the Contracting office to negotiate a definitive contract action in sufficient time to meet the Government's requirements; and it is in the Government's interest that contract performance can begin immediately.

(b) Unpriced Purchase Orders(also known as "Monetary Limitation Orders") shall be issued pursuant to the requirements of FAR Part 13 and Undefinitized Contractual Action Orders (also known as "Ceiling Priced Orders") shall be issued pursuant to the requirements of DFARS 217.74

(c) Unpriced Purchase Orders shall contain a Monetary Limitation price at the time of issuance. An Undefinitized Contractual Action Order shall contain a Not-To-Exceed price at the time of issuance.

(d) Failure to reach agreement on price for any order issued before its price is established is a dispute under the Disputes clause, FAR 52.233-1.

(e) When an RFQ is issued under Simplified Acquisition Procedures (FAR Part 13) and the Monetary Limitation Orders.

estimated contract price is under the Simplified Acquisition Threshold, a realistic monetary limitation shall be established for the order and the order shall be funded in the amount of the monetary limitation.

(1) All monetary limitation orders shall include the clause at FAR 52.216-24 with the fill-ins completed. Any modification of an order to adjust the monetary limitation shall make corresponding adjustments to FAR 52.216-24.

(f) When an RFQ or RFP is issued and the estimated contract price is at or above the Simplified Ceiling Priced Orders.

Acquisition Threshold, a Not-To-Exceed price shall be established for the order and the order shall initially be funded at not more than forty-nine percent (49%) of the Not-To-Exceed price. Prior to definitization and in the Government's discretion, a modification may be issued to increase the obligated amount to not more than seventy-five percent (75%) of the Not-To-Exceed price after receipt by the Government of the contractor's qualifying proposal for a firm-fixed-price order.

(1) All Ceiling Priced Orders shall include the clause at DFARS 252.217-7027 with all fill-ins completed.

(2) All Ceiling Priced Orders shall include the clause at FAR 52.216-24 with the fill-ins completed. Any modification to the obligated amount prior to definitization shall make corresponding adjustments to FAR 52.216-24.

(3) For any Ceiling Priced Order, the submission by the contractor of a qualifying proposal in accordance with the definitization schedule is a material element of the contract. The contractor shall submit its firm-fixed-price proposal for definitization to the PCO within thirty (30) days of its receipt of Government Property to be repaired under the Order, unless otherwise established in clause 252.217-7027, Contract Definitization in the Order. The contractor's proposal submission shall be in the form of a "qualifying proposal" as defined by DFARS 217.7401; and contractor shall include in its proposal a firm delivery schedule, if not already established, as well as cost or pricing data, as may be required in accordance with FAR subpart 15.4 and DFARS subpart 215.4.

(a) The induction period for repairs under each Order for repair shall be 365 days from the date of the order unless otherwise specified in the order.

(Or tailor to will be specified at the delivery order level)

(b) The contractor shall provide appropriate and adequate storage for all items received in accordance with an Order for repair under this BOA.

(c) All Orders, whether priced or unpriced, will be effective and binding upon issuance by the contracting officer, unless the Order specifically provides the Contractor an opportunity to reject the Order.

(d) Contractor shall not perform any work under this BOA that is not associated with a funded and executed Order.

(e) All contractor proposals and orders issued under this BOA shall include a reference to the Procurement Instrument Identifier for this BOA (Block 2 of the Standard Form 26).

The following changes to Limits have been made:

INFORMATION FROM TO CHANGED BY

Government Obligation to Order Maximum

USD 11,999,355.00 USD +11,999,355.00

The following CLIN(s) / SLIN(s) / ELIN(s) were deleted:

Item Supplies / Services Quantity Unit Unit Price Amount

Spares for 5-year ordering period:

See Attachment AProduct Service Code: 5985Pricing Arrangement: Firm Fixed Price.

Lot

Section C - Description/Specifications/Statement of Work

(a) Articles to be repaired and/or modified under this agreement, as shown on Attachment "A", will be shipped at the Government's expense to the plant of the contractor at:

TBD

The contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.

(b) Upon receipt of such articles, the contractor shall:

(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment; and further verify that the articles received are covered by the applicable Delivery Order;

(2) Segregate those assets that were improperly sent to the contractor, contact PCO for return shipping instructions, and return improperly sent items to the Government;

(3) Advise the Government PCO if any portion of the required repair is covered under a warranty; or is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished;

(4) Further advise the Government (PCO) of the results of the foregoing preliminary inspection, together with a list of the articles and quantities required to be repaired.

1.0 SCOPE

1.1. General. The items to be furnished hereunder are Government Furnished Property (GFP) and shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this BOA. Equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for on Attachment A. This limitation regarding the furnishing of equipment applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the BOA items.

1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see Attachment A for a list of these items) to a Ready For Issue (RFI) condition. RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The Contractor shall identify on Attachment th A e governing repair manual(s)/documents for each item covered by this BOA. On the same attachment, the Contractor must identify the facility for each item where repair, including final test and inspection, is completed.

1.2.1. Changes to repair manuals/documents and changes to drawings or specifications for the manufacture of parts utilized in these repairs require Procuring Contracting Officer (PCO) approval. In addition, as provided for in Section 2.3, requests for changes to a repair source or repair facility shall be submitted in writing to the PCO and must be approved prior to making any such change.

1.2.2. Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted.

1.2.3. The Contractor is not entitled to any equitable adjustment to the price or BOA terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

1.3. Beyond Physical Repair (BPR)

1.3.1. Scope. An item is BPR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.

1.3.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BPR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Inventory Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either requesting the submission of a proposal for BPR pricing, or ordering the disposal of the item. If asked to provide a BPR pricing proposal, the Contractor shall provide the proposal to the PCO within 30 days of receipt of the request. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor's approved Government property disposal procedures and the Contractor's approved Government property disposal procedures.

1.4. Beyond Economical Repair (BER)

1.4.1. Scope. An item is BER if the cost of the repair exceeds 80 of the replacement price for items identified on Attachment A. This % replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this BOA.

1.4.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BER.

All such determinations, including the basis for the determination, the repair required, the Contractor's proposed BER price to repair, and the DCMA written concurrence, shall be provided by the Contractor to the PCO, with a copy to the IM. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either providing contractual authority for repair of the item or ordering the disposal of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition disposal instructions, the contractor shall submit a proposal for disposal pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor's approved Government property disposal procedures.

The following additional procedures may apply, if authorized, for the replacement of a BER SRA (Shop Repairable Assembly) 1.4.3.

within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair [INSERT BOA/CONTRACT NUMBER], if any, or MILSTRIP the SRA (s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.

Missing on Induction (MOI).1.5.

1.5.1. Scope. A WRA is subject to this MOI provision if the item received by the Contractor for repair is missing one or more SRAs and the SRA is not a separately inducted item. Contractor replacement of MOI SRAs is not included in the contract price. Items received by the Contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the Contractor under this [INSERT BOA

/CONTRACT NUMBER].

1.5.2. Procedures. The Contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The Contractor shall provide written notice of all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the IM with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The Contractor shall not proceed with repair of WRAs with MOI SRAs until instructions on how to proceed are provided to the Contractor.

1.5.3. The following additional procedures may apply, if authorized, for the replacement of a MOI SRA within a WRA. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair [INSERT BOA/CONTRACT NUMBER], if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. If either of these options is not authorized, the Contractor shall contact the PCO for further instructions.

1.6. Swapping SRAs

1.6.1. Scope. On rare occasions the Contractor may request authority to replace a failed but repairable SRA (within an inducted WRA) that is not BPR, BER or MOI.

1.6.2. Procedures. The Contractor may request authorization to replace the failed SRA unit from the Contractor's production line, by MILSTRIP for an RFI item from Government stock, or with another repairable WRA, i.e. cannibalization. Permission from the PCO must be obtained and an equitable adjustment may be required. Authorization to ship in place from the Contractor's production line or MILSTRIP must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. Although permission from the PCO is required if the SRA is obtained from another repairable WRA (cannibalized), that transaction does not have to be input into CAV.

2.0 PARTS AND MATERIAL

2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this BOA unless parts or material are specifically identified on Attachment A as Government Furnished Material (GFM). All parts and material used in performance of this BOA shall be in accordance with the latest approved revision of applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this BOA to updated drawings and specifications for parts and material required for repairs performed under this BOA.

Any change to such parts/material drawings or specifications requires Government PCO approval.

2.2. All parts and material shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the PCO. Cannibalization of units that have not been inducted is not authorized and requires specific additional approval by the PCO. Cannibalization or swapping shall not , including any actions authorized under paragraphs 1.5 and 1.6, render an item BER or BPR.

2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval. However, if the Contractor has been delegated authority in writing by another Navy Command to approve a change in manufacturing source or a manufacturing facility, the Contractor may implement such a change after notifying the PCO, providing a copy of such delegation to the PCO, and receiving acknowledgment of such delegation from the PCO.

2.3.1. Where there has been a change to a manufacturing source, the Contractor shall complete all qualification testing that was required when that item or component was originally qualified. Any changes in such testing shall be submitted to the Contracting Officer for Government review and approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are not authorized. The Contractor is not authorized to deliver any items until such testing (including revised testing as properly approved) has been completed and the delivered items are repaired/manufactured in accordance with the qualification requirements package.

2.3.2. The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.

2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, ensure that the parts and material purchased are in compliance with the requirements of this BOA.

2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the Contractor upon receipt at the Contractor's facility to ensure conformance with all requirements of the applicable drawings and specifications. Alternatively, the Contractor shall submit, prior to contract award, evidence for Government review and approval of a purchased parts and material system which provides for adequate inspection to ensure parts and material conform with all requirements of the applicable drawings and specifications.

2.5.1. Evidence of such inspections shall be maintained by the Contractor or Subcontractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.

3.0 INSPECTION PROVISIONS

3.1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price incorporated by reference in Section E, at source by DCMA unless otherwise specified in the BOA or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this BOA.

The contractor shall furnish on an "as required" basis all parts required to complete servicing of repairable articles hereunder within established delivery schedules. Such parts shall be in accordance with applicable drawings and specifications.

The CAV Statement of Work (SOW) is located at: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support /Provisions-Instructions-and-Contract/; and incorporated herein by reference. The CAV SOW applies to all Orders for repair.

a) Deliver By dates for spares orders hereunder shall be specified on each delivery order.

b) Orders issued under the BOA shall be binding upon the date of issuance provided pricing and delivery schedule have been agreed to prior to issuance. The contractor shall, except as specified in paragraphs (a) and (b) below, immediately proceed with performance of the order.

a) The contractor shall stop performance immediately and notify the Contracting Officer within 30 days of the date of order when an item to be delivered cannot be identified by the given part number or when an item's configuration has been superseded as a result of an approved engineering change. After receipt of such notice, the Contracting Officer will advise the contractor of any actions to be taken, including whether performance is authorized.

N0038326RA0510002

https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/

b) The contractor shall not proceed with performance of any order when the contractor's applicable representations or certifications set forth in the BOA cannot be made by the contractor as to such order. Revised representations and/or certifications shall be provided to the Contracting Offer within ten days of the date of order issuance.

c) The PQDR process shall apply to any item received with a latent defect or in nonconforming condition.

Section E - Inspection and Acceptance

The following clauses were modified:

52.246-11 Higher-Level Contract Quality Requirement. Dec 2014 hereby reads as follows:

As prescribed in , insert the following clause:46.311

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

____ISO9001

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Section G - Contract Administration Data

Additional Information/Notes

The following clauses were modified:

252.232-7006 Wide Area WorkFlow Payment Instructions. Jan 2023 hereby reads as follows:

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Invoice and Receiving Report (Combo) Type

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC ____

Issue By DoDAAC ____

Admin DoDAAC ____

Inspect By DoDAAC ____

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section I - Contract Clauses

Additional Information/Notes

The following clauses were modified:

252.217-7027 Contract Definitization. May 2023 hereby reads as follows:

As prescribed in 217.7406(b), use the following clause:

CONTRACT DEFINITIZATION (MAY 2023)

(a) A Firm-Fixed Price is contemplated. The Contractor agrees to begin promptly negotiating with the Contracting Officer the terms of a ____ definitive contract that will include-

(1) All clauses required by the Federal Acquisition Regulation (FAR) on the date of execution of the undefinitized contract action;

(2) All clauses required by law on the date of execution of the definitive contract action; and

(3) Any other mutually agreeable clauses, terms, and conditions.

(b) The Contractor agrees to submit a firm-fixed price proposal and certified cost or pricing data supporting its proposal. Notwithstanding FAR 52.216-26, Payments of Allowable Costs Before Definitization, failure to meet the qualifying proposal date in the contract definitization schedule could result in the Contracting Officer withholding an amount up to 5 percent of all subsequent requests for financing until the Contracting Officer determines that a proposal is qualifying.

(c) The schedule for definitizing this contract action is as follows [insert target date for definitization of the contract action and dates for submission of proposal, beginning of negotiations, and, if appropriate, submission of the make-or-buy and subcontracting plans and certified cost or

:pricing data]

(d) If agreement on a definitive contract action to supersede this undefinitized contract action is not reached by the target date in paragraph (c) of this clause, or within any extension of it granted by the Contracting Officer, the Contracting Officer may, with the approval of the head of the contracting activity, determine a reasonable price or fee in accordance with FAR subpart 15.4 and part 31, subject to Contractor appeal as provided in the Disputes clause. In any event, the Contractor shall proceed with completion of the contract, subject only to the Limitation of Government Liability clause.

(1) After the Contracting Officer's determination of price or fee, the contract shall be governed by -

(i) All clauses required by the FAR on the date of execution of this undefinitized contract action for either fixed-price or cost-reimbursement contracts, as determined by the Contracting Officer under this paragraph (e);

(ii) All clauses required by law as of the date of the Contracting Officer's determination; and

(iii) Any other clauses, terms, and conditions mutually agreed upon.

(2) To the extent consistent with paragraph (d)(1) of this clause, all clauses, terms, and conditions included in this undefinitized contract action shall continue in effect, except those that by their nature apply only to an undefinitized contract action.

(e) The definitive contract resulting from this undefinitized contract action will include a negotiated firm-fixed price in no event to exceed not to exceed amount.

(End of clause)

Section J - List of Attachments

At a minimum, each order may include the following Attachments:

Attachment A - 1 - SPARES TO BE PROCURED

Attachment A - 2 - REPAIRS TO BE PERFORMED

Attachment B - PRICING SHEETS

Attachment C - PACKAGING

Attachment D - DD Form 1423 CONTRACT DATA REQUIREMENTS LIST (CDRL), AS APPLICABLE

Attachment E - SECURITY REQUIREMENTS (DD254), AS APPLICABLE

Attachment F - GOVERNMENT FURNISHED MATERIAL, AS APPLICABLE

Section K - Representations, Certification, & Other Statements

52.204-8 Annual Representations and Certifications. Oct 2025 hereby reads as follows:

Annual Representations and Certifications (Oct 2025)

(a)

(1) The North American Industry Classification System (NAICS) code for this acquisition is 336413.

(2) The small business size standard is 1,250.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519 if the acquisition-

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)

(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

(i) [ ] Paragraph (d) applies.

(ii) [ ] Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)

(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless-

(A) The acquisition is to be made under the simplified acquisition procedures in part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed .$200,000

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the provision at 52.204-7.

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $50,000, the basic provision applies.

(B) If the acquisition value is $50,000 or more but is less than $100,000, the provision with its Alternate II applies.

(C) If the acquisition value is $100,000 or more but is less than $102,280, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[ ]Contracting Officer check as appropriate.

(i)X 52.204-17, Ownership or Control of Offeror.

X 52.204-20, Predecessor of Offeror.(ii)

[ ] 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.(iii)

[ ] 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of (iv) Certain Equipment- Certification.

[ ] 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Certification.(v)

[ ] 52.227-6, Royalty Information.(vi)

[ ] Basic.(A)

[ ] Alternate I.(B)

[ ] 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.(vii)

(d) The offeror has completed the annual representations and certifications electronically in SAM website accessed through https://www.sam.gov.

After reviewing the SAM information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [

]. These amended representation(s) and/or certification(s) are also offeror to insert changes, identifying change by clause number, title, date incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

52.211-14 Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use.

Apr 2008 hereby reads as follows:

Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use (Apr 2008)

Any contract awarded as a result of this solicitation will be [ ] DX rated order; [ ] DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR700), and the Contractor will be required to follow all of the requirements of this regulation. [ .]Contracting Officer check appropriate box

(End of provision)

52.216-1 Type of Contract. Apr 1984 hereby reads as follows:

As prescribed in , complete and insert the following provision:16.105

Type of Contract (Apr 1984)

The Government contemplates award of a Basic Ordering Agreement (BOA) with Orders that are resulting from this solicitation.firm fixed price

(End of provision)

IDCode: J
Page: 1
Pages: 19
AmendNo: 0002
EffDate: 30 Mar 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N00383
AdmCode:
IssuedBy: NAVSUP WEAPON SYSTEMS SUPPORT

PHILADELPHIA, 700 ROBBINS AVENUE

PHILADELPHIA, PA 19111-5098

UNITED STATES

Meghan Gubicza, Email: meghan.e.gubicza.civ@us.navy.mil Telephone: 2156979270 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N0038326RA051
SolDate: 02 Mar 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Cathy Hughes
ContDate:
CODate: 30 Mar 2026