AttchF_Copy_of_V-22_ECS__VFG_LTC_RDT.xls
XLS spreadsheet 82 KB Posted
- Solicitation number
- N0038318R008D
About this file
This synopsis announces a solicitation to award a five-year base requirements long-term contract to Honeywell International Inc. located in Tempe, Arizona for repair of seven V-22 aircraft components. The Naval Supply Systems Command intends to solicit and negotiate solely with Honeywell under the authority provided in FAR 6.302-1. Repairs will be for shaft driven compressor, emission air valve, air heat exchanger, air cycle machine, air conditioner, and two variable generators. One or more items are subject to World Trade Organization Government Procurement Agreement or Buy American Act requirements. Orders issued under the long-term contract will be pursuant to 10 U.S.C. 2304(c)(1) as the flight critical components require prior government source approval. Only previously approved sources for repair of the items will be solicited.
AttchF_Copy_of_V-22_ECS__VFG_LTC_RDT.xls
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0038318R008D-0003.pdf | ||
| AttchG_CDRLs_CWBS_1921_1921-5.pdf | ||
| N0038318R008D-0002.pdf | ||
| AttchE_Copy_of_V-22_ECS__VFG_LTC_CSDR_Plan.xls | XLS spreadsheet | |
| N0038318R008D_Amend0001.pdf | ||
| N0038318R008D.PDF | ||
| N0038318R008D_N0038318R008D_1102607213_EXHIBIT_A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RDT
| Resource Distribution Table (RDT) | ||||||||||||
| Sustainment WBS Template - TBD | ||||||||||||
| Prime Contractor | Subcontractors | |||||||||||
| Prime Contractor or Sub-Contractor | Total | In-House | Total | Sub | Sub | |||||||
| Description | ||||||||||||
| Contractor/Organization Name | TBD | |||||||||||
| Contractor/Organization Location | ||||||||||||
| Contract Number | ||||||||||||
| Total Program Office or Contract/Effort Value (Estimated), TY$M | ||||||||||||
| Subtotal Software Contract Value (Estimated), TY$M | ||||||||||||
| Government Organization or PARM | ||||||||||||
| CSDR Direct Reporting per CWIPT (Yes/No) | ||||||||||||
| SRDR Direct Reporting per CWIPT (Yes/No) | ||||||||||||
| WBS NUMBERS | WBS Element Name | |||||||||||
| L1 | L2 | L3 | L4 | L5 | L6 | L7 | ||||||
| 1.0 | Environmental Control System (ECS) and Variable Frequency Generator (VFG) Long-Term Contract (LTC) | X | ||||||||||
| 1.1 | Unit-Level Manpower | |||||||||||
| 1.2 | Unit Operations | |||||||||||
| 1.3 | Maintenance | X | ||||||||||
| 1.3.1 | Consumables and Repair Parts | |||||||||||
| 1.3.2 | Depot Level Reparables (DLRs) / Repair of Reparables (RORs) | X | ||||||||||
| 1.3.2.1 | Airframe/Hull/Vehicle DLRs | |||||||||||
| 1.3.2.2 | Propulsion DLRs | |||||||||||
| 1.3.2.3 | Electronics/Avionics DLRs | X | ||||||||||
| 1.3.2.3.1 | Shaft Driven Compressor (NIIN 014873403) | X | ||||||||||
| 1.3.2.3.2 | Emission Air Valve (NIIN 014180832) | X | ||||||||||
| 1.3.2.3.3 | Air Heat Exchanger (NIIN 014180686) | X | ||||||||||
| 1.3.2.3.4 | Air Cycle Machine (NIIN 015571867) | X | ||||||||||
| 1.3.2.3.5 | Air Conditioner (NIIN 015785137) | X | ||||||||||
| 1.3.2.3.6 | Variable Generator (NIIN 016578001) | X | ||||||||||
| 1.3.2.3.7 | Variable Generator (NIIN 015215190) | X | ||||||||||
| 1.3.3 | Intermediate Maintenance | |||||||||||
| 1.3.4 | Depot Maintenance | |||||||||||
| 1.3.5 | Packing, Handling, Shipping and Transportation | X | ||||||||||
| 1.4 | Sustaining Support | X | ||||||||||
| 1.4.1 | System Specific Training | |||||||||||
| 1.4.2 | Support Equipment Replacement and Repair | |||||||||||
| 1.4.3 | Sustaining / Systems Engineering | |||||||||||
| 1.4.4 | Program Management | X | ||||||||||
| 1.4.4.1 | Long-Term Contact (LTC) Management | X | ||||||||||
| 1.4.4.2 | LTC Supply Management | |||||||||||
| 1.4.4.3 | Financial / Schedule Planning and Reporting | X | ||||||||||
| 1.4.4.4 | Transition to Lead Service | |||||||||||
| 1.4.4.5 | Quality Assurance | X | ||||||||||
| 1.4.4.6 | Administrative Security | X | ||||||||||
| 1.4.4.7 | Transition to Performance Based Logistics (PBL) | |||||||||||
| 1.4.4.8 | Risk Mitigation | |||||||||||
| 1.4.4.9 | Contracts | X | ||||||||||
| 1.4.4.10 | Commercial Asset Visibility (CAV) Reporting | X | ||||||||||
| 1.4.4.11 | Contract Data Requirements List (CDRL) Reporting | |||||||||||
| 1.4.4.12 | Travel | |||||||||||
| 1.4.5 | Information Systems | |||||||||||
| 1.4.6 | Data and Technical Publications | |||||||||||
| 1.4.7 | Simulator/Training Device Operations and Repair | |||||||||||
| 1.5 | Continuing System Improvements | |||||||||||
| 1.6 | Installation and Personnel Support (System Level Only) | |||||||||||
| 1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the | ||||||||||||
| Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform | ||||||||||||
| to the applicable rules established for the Program Plan RDT | ||||||||||||
| 2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included. |