Bldg 514 Re-insulate process water piping
Solicitation number
N0025324Q0079
Issued by

About this file

This document is an amendment to a solicitation for the re-insulation of process water pipes in Building 514 at the Naval Undersea Warfare Center (NUWC) in Keyport, Washington. The key details are:

The solicitation is for a firm-fixed-price construction contract to remove existing pipe insulation and heating cables, replace pipe heating cables, re-insulate chiller lines, and replace pressure reducing valves with freeze protection. All work must be coordinated through the Contracting Officer's Representative (COR). The solicitation is set aside for small businesses under NAICS code 238290, with a target award date of October 31, 2024. The government estimate is less than $25,000. This amendment provides answers to pre-proposal inquiries and extends the proposal due date from October 12, 2024 to October 16, 2024.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to provide answ ers to the Pre-Proposal Inquiries (PPIs) and to extend the proposal due date. Wage Determination WA 20240109 is updated to Mod 3 dated 27 September 2024. The point of contact for this amendment is Michelle Farrales at michelle.a.farrales.civ@us.navy.mil and James Wasson at james.k.w asson.civ@us.navy.mil.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Oct-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0025324Q0079

X 9B. DATED (SEE ITEM 11)

12-Sep-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Oct-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

ATTN: MICHELLE FARRALES

MICHELLE.A.FARRALES.CIV@US.NAVY.MIL

610 DOWELL STREET, BLDG 206

KEYPORT WA 98345

N00253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0025324Q0079

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 12-Oct-2024 01:00 PM to 16-Oct-2024 01:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Perform work in accordance with the Statement of Work. Wage determination WA20240109 applies to this CLIN.

To:

Perform work in accordance with the Statement of Work. Wage determination WA20240109 Mod 3 dated 27 September 2024 applies to this CLIN.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

PPI AND ANSWERS

INQUIRIES:

1. Section IX. work description item 5 states to remove a flanged bypass valve. A flanged bypass valve was not identified during the site visit and did not appear to be part of the piping system. Is this item to be removed from the SOW?

Yes, please see revised scope section IX, 15.

2. Section IX work description item 6 states remove bypass valve and install a new section of pipe. No bypass valve was identified during the site walk. Is item 6 to be removed from this SOW?

Yes, please see revised scope section IX, 16.

3. Section IX. work description item 7 states to remove a 6” 3-way valve and replace with a flanged spool. The piping system identified during the site visit was 1-1/2” and 2”. Is this item to be removed from the SOW?

Yes, see revised scope section IX, 17.

4. Section IX work description item 8 states that glycol in the piping system will need to be captured and pumped back into the system. Please confirm the piping system includes glycol.

There is no glycol used in the system.

5. Additional piping insulation on the northside of the pump enclosure was identified as being damaged during the site visit. Is the additional piping insulation identified during the site visit to be replaced?

Yes, see revised scope section IX, 5-6 in the work description.

6. The 2” line located below the pump enclosure appears to have damaged insulation. Is the insulation on this line to be replaced through the pump enclosure?

Yes, see section IX of work description, 4.

7. Due to the smaller magnitude and limited scope of this project, can the same person serve as Superintendent/QC/SSHO?

Confirmed, the same person can serve as Superintendent/QC/SSHO.

8. Section C. statement of work states to remove pressure reducing valves with freeze protection. This statement is also included in item IV products letter F; however, section IX work description does not mention pressure reducing valves. There were no pressure reducing valves identified during the site visit. The chilled water supply and return lines do include pressure relief valves. Are the pressure relief valves installed on the supply and return piping to be replaced with an automatic freeze protection device? If so this would not be the correct application for this type of system if it contains glycol.

This work was removed from the scope. No work is anticipated on any valves, pipe, or reducers.

9. Please confirm that item 10 in section IX work description can also be removed if no bypass valves or 3-way valves are being removed from the system.

Yes, see revised scope section IX, 17.

10. Is any record information available on the existing heat trace system currently installed?

No, see revised scope section IX, 7. Work related to removing heat tape was removed from the scope.

11. Are existing shielded insulation inserts and strut clamps to be replaced as part of the insulation replacement?

Yes, see revised scope section IX, 10.

12. Current project bid date is Saturday October 12th. Is this the correct bid date?

No, proposal due date will be extended to a business day.

13. Please confirm heat trace wire is only to be replaced on the 2” makeup water line.

Keyport does not want any heat trace tape replaced.

The following have been modified:

STATEMENT OF WORK

I. Statement of Work:

NAVSEA NUWC Division, Keyport has a requirement to remove and re-insulate remaining pipe insulation and heating cables on process water pipes. This work is located on the roof of Bldg. 514.

from doghouse to building entry point. Replace pipe heating cables. Re-insulate chiller lines. Replace pressure reducing valves with freeze protection. Wrap all chiller lines with aluminum-jacketing insulation as per the Unified Facilities Guide Specifications (UFGS). shielding, seal all joints and building penetrations.

Haul away all debris.

All work must be coordinated through the Contracting Officer’s Representative (COR)/Engineering Technician (ET). A preconstruction meeting will take place two weeks prior to the start of construction, the PM, Customer, Contractor and all required subs will attend at a minimum

II. References:

A. Naval Base Kitsap (NBK) Instruction 11300.1 Utilities and Facilities Outages B. EM-385-1-1 Safety and Heath Requirements Manual, March 15, 2024, available at https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and- Health-Requirements-Manual/

C. NAVFAC P307 Weight Handling Program Management Manual, June 2016, , (Available upon request)

D. Naval base Kitsap (NBK) Instruction 11210.1A Road Closure/Disruption Coordination, August 21, 2014, (Available upon request)

E. Unified Facilities Guide Specifications (UFGS) ) 23 81 00 Decentralized Unitary HVAC Equipment, May 2016 23 07 00.00 20 Basic Mechanical Materials and Methods, August 22, 2024 located at https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

F. Unified Facilities Guide Specifications (UFGS) 23 23 00 Refrigerant Piping, August 2021, located at https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

III. Submittals:

https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/ https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/ https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

1. Electronic copies of Product/Material Submittals & Construction/Production Schedule shall be submitted to the COR for approval in accordance with Deliverables and Performance Table under General Requirements. Allow minimum 10 working days for Government review of all submittals.

2. Proposed equipment specifications shall be submitted to the COR/ET for review and written approval prior to commitment to purchase.

3. Schedules: Post award, the Prime Contractor shall submit an electronic production schedule to the COR/ET three (3) weeks prior to schedule start dates. Production schedules shall include a three

(3) week projection of work.

4. Required outages shall adhere to Ref (A) and routed through the COR/ET for information on scheduling. The COR/ET is not responsible for outage coordination, obtaining signatures, or vetting outage requests, including Hot Work permits or Fire Alarm outages. Contractor pricing shall include all Contractor support and associated costs in their proposal.

5. All submittals requiring NUWC Keyport Environmental signature shall be routed through the

COR/ET for review. The COR/ET shall be copied on all correspondence with Environmental. No work shall begin until all required Environmental forms have been accepted by Environmental.

6. Approved/signed/accepted outages, excavation permits, Hot Work permits, environmental submittals, and all other accepted/approved submittals not mentioned herein shall be sent electronically to the COR/ET for project filing.

7. All contractors working this project are subject to labor interviews and shall provide the information requested per “Labor Standards Interview” form 1445 (Rev. 12-96). The COR/ET will conduct these interviews randomly during the performance of the work.

IV. Products:

1. All materials and products provided by the Contractor in the performance of this contract shall be newand manufactured and assembled in the United States of America and shall meet or exceed the manufacturer’s specifications.

2. The materials and/or products listed here are required for the completion and operation of this project, and not intended to be an all-inclusive list of materials required for the project.

A. Pipe insulation protective Jacketing, Aluminum B. Heat tracing for Plumbing Piping C. Power Kit w/1 end seal D. Splice kit E. End seal F. Pressure reducing valves to be replaced with Freeze Protection G. Blanket Insulation with Jackets H. Provide piping Insulation that meets or exceeds the requirements of ASHRAE 90.1 -

SIASHRAE 90.1 - IP[ASHRAE 90.2

I. Aluminum Fittings J. Aluminum Corner Angles K. Sealant or Caulk

V. Quality Control:

1. The Contractor shall comply with all applicable Washington State licensing requirements, from the time of proposal submission through the entire performance period. All components and services are to be installed per manufacturer’s specifications by trained technicians with a minimum of five (5) years’ experience or journeyman certificate, who specialize in the type of work indicated herein.

2. The Contractor shall perform all work according to accepted standards, safety procedures, and applicable laws, regulations, codes, and standards to include the Unified Facilities Guide Specifications (UFGS), Unified Facilities Criteria (UFC), International Building Code (IBC), International Mechanical Code (IMC), International Plumbing Code (IPC), National Electrical Code (NEC), National Electrical Safety Council (NESC), and National Fire Protection Association

(NFPA).

3. The Contractor shall be responsible for all quality control, inspections, and tests required in the completion of this project. The Contractor shall obtain all approvals except those required for field installations, field applications, and post-field tests, prior to delivery of materials and equipment to the project site unless otherwise specified. The Contractor shall arrange for tests and inspections where and when required as defined in the approved Quality Control Plan.

4. Contractor shall verify all dimensions of all equipment to ensure that all access clearances can be met.

5. The contractor is responsible for providing a complete and useable system including providing manufactures manuals, specifications, any field tests, wiring diagrams and as- built prints (red line drawings) as necessary.

VI. Execution: (general)

1. All approved project submittals and the contract shall be kept on the jobsite and all employees shall be aware of its contents. Current, up-to-date Site Specific Activity Hazard Analysis (AHA) forms shall be available for review, if applicable. The Contractor shall inform all employees prior to the start of performance as to the process for contacting Base Emergency Services in the event of an emergency.

2. Scheduling: The Contractor shall schedule work to cause the least amount of interference with station operations. The government will attempt to provide the Contractor 24 hours’ notice prior to work interruptions due to unscheduled/emergent operational requirements.

3. Protection of Government Property: The Contractor shall use every means at their disposal to prevent damage to government owned property during the execution of work. If government property is damaged, the Contractor shall contact the COR/ET immediately and stop work until the issue is resolved.

4. Delivery, handling, storage, and protection of products to, and at the project site: Inspect for damages, store in a clean dry place, and protect from construction traffic. Handle carefully to avoid damage to components, enclosures, and finish.

5. Access to Building 514 is limited to cleared personnel and vehicles. All contractors or employees of contractors shall have VARS submitted to PM.

6. Furnish the COR/ET with a list identifying personnel and vehicles requiring access.

7. Disposal of any material resulting from demolition shall be per applicable Environmental regulations, including all documentation (Waste Designation Tables, Waste Information Sheet (WIS) forms, Waste Generation Reports (WGR), etc.) and documented in accordance with Attachment 04.

8. Contractor shall locate all utilities prior to starting any excavation work.

9. Contractors performing a Weight Handling Evolution shall adhere to Ref (C) and Attachment 03.

10. Contractors utilizing lifting and handling equipment shall adhere to Ref (C) and Attachment 03.

VII. Bldg. 514 General

1. Safety and Security Brief

A. Bldg. 514 Safety and Security Brief is required for the contractor’s complete crew before any work can begin. The brief is approximately 60 minutes and is provided by NUWC Keyport personnel. It can be coordinated through the Engineering Technician with minimum of three (3) days advanced notice.

B. Compliance with the security directions of Security Force Personnel is mandatory.

C. Performance under this contract requires the contractor to adhere to Attachment 05, Operations Security (OPSEC) requirements, which are attached to this solicitation and will be incorporated into the subsequent award and are also available online at:

http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-Keyport/Resources; click on OPSEC Guide for Defense Contractors on the left-hand side.

2. Smoking

A. Smoking is only permitted in designated smoking areas.

3. Delays A. Contractor operations are subject to reasonable delays, suspensions, and/or restrictions because of emergencies, alerts, drills, equipment movements and other such activities.

4. Flame Producing Devices A. Matches, lighters, and other spark producing devices are not allowed without a Hot Work permit.

5. Portable Electronic Device(s) (PED) A. PED is defined as a portable electronic device having the capability to store, record, and/or transmit text, images/video, or audio data. Examples of PED include, but are not limited to pagers, laptops, cellular telephones, radios, compact disc and cassette players/recorders, portable digital assistants, audio devices, watches with input capability, reminder recorders, and mobile devices.

B. PEDs are not allowed inside of NUWC Keyport Buildings. PED use will be clarified and discussed at the site walk and pre-construction meeting

C. The Government COR/ET or Building POC will provide location of phone for emergency use.

D. For work inside the NUWC Keyport Annex, refer to the Keyport Annex Safety and

Physical Access Security Brief.

6. Photography A. Photography by the Contractor is prohibited. Construction progress photos, and all other necessary photo documentation, will be provided by authorized Government personnel only.

7. Coordination

A. The COR/ET shall be contacted to coordinate access to the buildings for job walks, site visits, and scheduling of the work.

8. Lock out Tag Out

A. Lock Out/Tag Out: Contractors must notify the (SECURE AREA NAME – POC) five

(5) working days before anything can be locked out. The notification should include:

what is being locked out, the tag number, the person on the tag and phone number shall also be provided to the (SECURE AREA NAME – POC) within 24 hours of removal.

9. Vehicle Access

A. All vehicles will be subject to inspection and search prior to entering and within NBK - Keyport. Avoid transporting sealed containers into NBK - Keyport. If such containers must be introduced, prior coordination with the COR/ET is required.

B. Parking stalls at NUWC Keyport are assigned to NUWC Keyport employees. If the contractor requires a lay down area, a Road Closure/Lane-Closure/Disruption request permit will need to be submitted through the NBK. Refer to Reference F for instructions.

VIII. Deliverables:

1. The Contractor is responsible for providing a complete and useable system.

2. The Contractor shall prepare and submit two (2) two (2) CD/DVDs of the Operations and

Maintenance (O&M) Manuals to the COR/ET. Each binder shall have the project contract number, Prime Contractor letterhead, project title, and building number on the spine and face of the binder. Each binder shall include Attachment (1) above, all product data, manufacturer’s manuals, warranty, specifications, field test results, wiring diagrams, and as-built prints (red line drawings), as necessary.

3. Before final payment will be approved, the Contractor shall provide all necessary training required on any and all new systems.

4. This project will not be accepted as complete until all project documentation and punch list items have been submitted to, and approved by the COR/ET in their entirety and the Customer provides their concurrence electronically to the COR/ET that the project is complete.

IX. Work Description:

1. Contact NUWC POC for coordination of equipment shut down via equipment maintenance provider. They will need to manipulate the control system for testing. Carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions.

2. Perform work in accordance with the manufacturer's published diagrams, recommendations, and equipment warranty requirements.

3. Remove and replace with new existing metal cladding and insulation from all supply and return condenser piping from building to Doghouse aluminum-jacketed insulation from all lines (2” and 1.5” 6 total) from south side of doghouse to the building entry point. All existing blanket insulation is to be removed.

4. Provide and install all new insulation and jacketing from south side of doghouse to the building entry point .Insulation and jacketing shall extend 2” into doghouse. Material to cover all 6 lines from south side of doghouse to piping entering building. Stopping point shall be where piping insulation transitions to PVC jacking.

5. Remove all insulation from the North side of the doghouse; including the 90-degree elbows that connect to the 80ft straight parallel run.

6. Re-insulate all piping from the North side of the doghouse; including the 90-degree elbows that connect to the 80ft straight parallel run.

7. Care should be taken when removing existing pipe insulation as existing heat tape is working and shall not be removed.

8. Re-secure heat tape along pipe where insulation was removed as needed.

9. Ensure all Joints are watertight. Remove and Replace with new insulation and heat trace tape on makeup water pipe from building to cooling tower.

10. Remove and re-install shielded insulation and strut clamps with new.

11. Apply insulation to the pipe with tight butt joints. Seal all butted joints and ends with joint sealant and seal with a vapor retarder coating, greater than 3-ply laminate jacket - less than

0.0000 perm adhesive tape or PVDC adhesive tape.

12. All penetrations; and openings that can be susceptible to water intrusion from the exterior elements to the interior facility/equipment, shall be sealed to prevent water intrusion. Insulate and/or seal all penetrations accordingly.

13. Label all pipe with description and direction of flow.

14. Upon completion, jacketing shall be water tight to prevent water instruction into insulation.

15. Remove flanged bypass valve. A larger section of pipe and balancing valve may need to be removed on the condenser water bypass. Install spool, cap off pneumatic airlines, insulate and seal new section.

16. Remove Bypass valve, install section of pipe and cap off pneumatic airline, Insulate and seal new section.

17. Remove 1-6” 3-way valve and replace with Flanged spooled fitting and return line flow valve will be removed and capped at flange. (contractor to verify size) Insulate and seal new section.

18. Systems are started and operating in a safe and normal condition.

19. Testing, Adjustment, and Balancing of Hydronic Systems

20. All field verification will be the contractor’s responsibility. Including but not limited load requirements and sizing.

21. Upon completion of the work, the Contractor shall inform the COR/ET to demonstrate operational tests.

X. Title to Materials:

1. All excess and/or discarded materials shall become property of the Contractor and shall be removed from government property, unless specifically noted. Title to the materials resulting from demolition is vested in the Contractor upon authorization of the Contracting Officer to begin demolition.

2. Recycling is preferred and recommended. A WIS is required for disposal and recycling is required for metal.

XI. Material/Equipment In-Place List:

1. The Contractor shall provide a list of significant equipment and materials removed, replaced, or installed under this contract with the required information below, including the warranty expiration date.

A. Types of equipment and materials:

I. Materials: Roofing products, floor coverings, windows, doors, lighting, and all material with a manufacturer’s warranty.

II. Equipment: Mechanical (pumps, backflow preventers, HVAC components, pressurized piping systems, panel boxes, emergency lights, street lighting, etc.); mechanized doors, elevators, conveying systems, all equipment with an O&M manual or manufacturer’s warranty.

2. Required format and information: The Contractor shall provide material and equipment data in the attached format (Attachment (1) – Material/Equipment In-Place List). All of the requested data shall be provided prior to final inspection or final acceptance.

XII. Cleanup:

1. Contractor shall not dispose of debris/rubble on NBK property or in NBK dumpsters.

XIII. Safety and Environmental:

1. Safety is everyone’s responsibility. All contractor personnel on site are responsible for their own actions and any person on the project site has the authority to stop work if an unsafe condition exists.

2. The Contractor shall perform all work according to accepted Industry Standards, Safety and Environmental Procedures, and regulations, including Ref (B) and the latest revision of OSHA regulations.

3. The Contractor is responsible for inspecting their worksite for any hazards at all times, no exceptions. If an unsafe condition exists, work to correct or mitigate the hazard and contact the COR/ET to assist in determining how to proceed, if needed.

4. Ensure all workers are wearing the proper PPE for the assigned task.

5. Environmental – The Contractor shall obtain approval of a site plan detailing methods of handling encountered waste and refuse, including spill response procedures, per Attachment 04 prior to the start of any site work.

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been modified:

G-242-H001 Government Contract Administration Points-of-Contact and Responsibilities (NAVSEA) (OCT 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: James Wasson

Address:

610 Dowell Street Keyport, WA 98345 Phone: (360) 396-2935 E-mail: James.k.wasson.civ@us.navy.mil

(ii) The Contract Specialist is:

Name: Michelle Farrales Address:

610 Dowell Street Keyport, WA 98345 Phone: (360) 315-1981 E-mail: michelle.a.farrales.civ@us.navy.mil

(d) The Contracting Officer’s Representative (COR) is the contracting officer’s appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

The Contracting Officer’s Representative (COR) is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(e) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government mailto:James.k.wasson.civ@us.navy.mil mailto:michelle.a.farrales.civ@us.navy.mil

Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Address: [ *Street ]

[ *City, State, Zip ]

(f) The Contractor's point of contact for performance under this contract is:

Title: [ * ] Address:

[ *Street ] [ *City, State, Zip ]

[ * ] To be completed at contract award

(End of Text)

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

252.201-7000 Contracting Officer's Representative DEC 1991

(End of Summary of Changes)

File details come from the government source that posted it. Updated .