Amendment 0002.pdf

PDF 580 KB Posted

Attached to
Bulk Liquid Nitrogen Tank Replacement Federal contract opportunity
Solicitation number
N0025324Q0028
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is an amendment to a solicitation for a federal contract opportunity. The purpose of this amendment is to provide answers to vendor questions related to the requirement to remove, replace, and install a bulk liquid nitrogen storage tank at the Naval Undersea Warfare Center Division (NUWC) in Keyport, Washington.

The key details are:

  • The original solicitation number is N0025324Q0028.
  • The current contract is not actively being worked on by another vendor, and the requirement has not yet been awarded.
  • The government will not be reviewing additional evaluation criteria beyond what is already outlined in the solicitation.
  • The required Maximum Allowed Working Pressure (MAWP) for the new 3000-gallon tank is 100 psi, typically operated at 40-50 psi.
  • The vendor will need to cut and reconnect the existing copper trailer fill connection.
  • Nitrogen from the onsite LN2 tank can be used to perform leak checks on the new tank connections.

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Liquid Nitrogen Tank Replacement, newest first.
File Type Posted
Amendment 0001.pdf PDF
CDRL A002_Redacted.pdf PDF
CDRL A001_Redacted.pdf PDF
CDRL A007_Redacted.pdf PDF
Material In Place List.pdf PDF
CDRL A008_Redacted.pdf PDF
CDRL A005_Redacted.pdf PDF
14172903(1).pdf PDF
14190870_Rev_F.pdf PDF
N0025324Q0028.pdf PDF
Security Requirements.docx DOCX document
CDRL A003_Redacted.pdf PDF
Kitsap County Wage Determination.txt TXT text file
14177000.pdf PDF
CDRL A004_Redacted.pdf PDF
CDRL A006_Redacted.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er vendor questions, found on page tw o (2).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0025324Q0028

X 9B. DATED (SEE ITEM 11)

07-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Mar-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

ATTN: NAOMI MCKENZIE

NAOMI.MCKENZIE@NAVY.MIL

610 DOWELL STREET, BLDG 206

KEYPORT WA 98345

N00253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0025324Q0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

VENDOR QUESTIONS

Question One (1): Could you please provide the name of the company currently providing this service?

Answer: This requirement is not actively being worked on by another vendor.

Question Two (2): Would you be able to share the existing contract number and its total value?

Answer: This requirement is not currently awareded.

Question Three (3): Beyond the requirements outlined in the solicitation, are there other key factors or priorities that NUWC Keyport will heavily consider during the evaluation process?

Answer: The government will not be reviewing additional evaluation criteria, that is not already outlined in the solicitation.

Question Four (4): What is the required Maximum Allowed Working Pressure (MAWP) of the new 3000 gallon tank?

Answer: MAWP is 100psi, typically we operate at 40-50psi.

Question Five (5): Replacing the existing tank looks like it will require cutting the copper trailer fill connection.

Should vendor expect to reconnect this piping?

Answer: Yes, the vendor will need to cut the fill connection. And yes, the vendor will need to remake that connection.

Question Six (6): Can nitrogen from the onsite LN2 tank be used to perform leak checks on the new tank connections?

Answer: Yes, nitrogen from the other tank can be used to check for leaks and such.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .