This amendment modifies a solicitation for an event production contractor to provide rental equipment, setup, and teardown support for the 2023 Naval Innovation Science and Engineering Technical Exchange Meeting. The contractor shall setup five tents, lighting, audiovisual equipment, tables, chairs, and fencing between September 6-16, 2023 at the Naval Undersea Museum in Keyport, Washington. Three presentation tents sized at 30x50 feet, one collaboration tent at 30x50 feet, and one poster session tent at 50x100 feet are required. Specific equipment and services include high bay and decorative lighting, portable power, exit signs, fire extinguishers, trash cans, ceiling fans, portable audio equipment, elevated TV monitors, tables, chairs, fencing and other items as detailed in the amended statement of work diagrams and requirements. The solicitation number is N0025323Q0086 and was issued by the Department of the Navy Naval Sea Systems Command for this event production support. The response due date and award date are not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23Q0086 - Amendment 0004.pdf | ||
| 23Q0086 - Amendment 0003.pdf | ||
| 23Q0086 - Amendment 0002.pdf | ||
| 23Q0086 - Amendment 0001.pdf | ||
| N0025323Q0086.pdf | ||
| 23Q0086 - Security Requirments.docx | DOCX document | |
| 23Q0086 - Wage Determiantion.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er vendor questions, found on page tw o (2). And to revise the follow ing sections of the statement of w ork (SOW): 1, 2.1.5.c., 2.1.7 and 2.3.1.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0025323Q0086
X 9B. DATED (SEE ITEM 11)
11-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2023
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: NAOMI MCKENZIE
NAOMI.MCKENZIE@NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0025323Q0086
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
ANSWER TO VENDOR QUESTIONS
Question:
1. There is no mention of conference management or F&B requirements, so can we assume the Navy will be organizing/managing the event and this RFP is just for someone to deliver/setup/remove 5 venue tents with the necessary lighting, staging, poster boards, tables, and chairs indicated?
These items are mentioned but I didn’t see a breakdown of what the needs are:
2. Communications - perhaps sound system(s) for the presenters and techs to run them?
3. Generator Power – again no mention of what needs to be powered unless you are referring to the lighting and sound system?
4. While it may be covered in the Jargon, is there a need for security clearances or other requirements for the various sub-contractors & personnel while they are on base?
Answer:
5. Correct. Navy will conduct all event management as described. Vendor to provide all rental equipment, set‐up, teardown as described in the SOW.
6. PA requirements are to support presentations, No tech support is expected. Each tent is assigned an
Ambassador to assist with presentation needs including sound support.
7. Lighting, plug strips, sound system (if not battery powered), ceiling fans, exit signs,
8. Event set up will be at the Naval Undersea Museum. Access to the site does not require security clearance.
Question:
1. Please provide the specs for the PAs in each of the presentation tents. It appears there are tables on the stage for
4 panelists & discussions, but will you want a podium too?
What about handheld wireless for audience questions?
Will there be lecturers who need lapel mics?
Will the setup in each tent will be identical?
2. Is there any land power available? If not, we can quote with generators and/or batteries but this will mean we will need to have someone on site for the duration to refuel or recharge.
Are there commercial hotels nearby?
Answer:
1. Podiums are not necessary.
Yes, wireless hand held audience mics would be preferable for tents 1, 2, and 3.
Yes, Topic Session Chairperson will have lapel mics.
Similar but not identical, refer to diagrams.
2. Land power will not be available. Generator power is required to run all five tents.
Nearest commercial hotel is in Silverdale, Wa. Approx 5 miles away.
Question:
1. Could we install the PA, Video screens and uplighting on September 9th?
2. We may need to drive in 8’ grounding rods for the generator depending on final setup.
3. Will there be a “bone yard” available where we can park trucks and or leave equipment boxes somewhere on the base?
4. We recommend large screen TV’s (75”) would be better than projectors which tend to wash out... which will happen in white tents on a bright sunny day. Would (2) 75” large screen TVs per presentation tent satisfy your needs?
5. You have requested 1 upplight per tent... what is being unlit?
6. Yes, that would be sufficient.
7. Portable generator system should support bounded/grounded so as not to require 8’ grounding rods.
8. No. Designated event parking is limited. Bone yard area is not available.
9. Yes, 2 large screen TV monitors per tent would satisfy need.
10. Uplighting is for accent lighting on wall behind stages.
Question:
1. In the requirements, it lists “white walled tents with non‐flapping sidewalls.” (page 3 #2.1.1, page 4 #2.2.1 and
2.3.1) Is this intended to mean vinyl soft sidewalls that are secured at the base from flapping, or does this indicate a hard structure wall being necessary? The hard structure wall is possible, just more expensive.
2. Outside of the lighting and AV that is listed in the requirements (page 3 and 4), is there any additional power required? E.g. client laptops, lighting, equipment that must be included in the overall power specifications?
3. The requirements list Decor lighting (page 3 #2.1.4) in addition to the high bay lighting. Is this for stage presenters, general ambient around the tent, or is there a specific decor piece being developed for this area?
4. Can ceiling fans be pole mounted fans with cages, or do these need to be peak mounted? (page 4 #2.1.12 and
#2.2.11 and #2.3.14)
5. Is there a requirement for ramps or ADA access to the stages? (page 6 diagrams)
6. Do the stage tables require skirting? (page 6 diagrams)
7. Is the requirement for only one microphone per stage? We see four chairs, should this be four microphones on table stands? (page 3, #2.1.6).
8. We do see a requirement for a 120” projector screen but no requirement for projector, video source, switcher or technician. Is this being provided by the government? If not, please list specifications and what content will be necessary (video, powerpoint, IMAG, audio from presentations, etc). (Page 3, #2.1.7)
9. Have you given thought to a LED screen for these areas? Typically projection outdoors does not meet our minimum standard for viewing during the daylight hours. (Page 3, #2.1.7)
10. Will the government provide trash removal from the receptacle? Do we need to include staffing for trash removal? Is there a large dumpster onsite, or is a roll‐off dumpster required? (Page 4, #2.1.10, #2.2.6, #2.3.7)
11. Can barrier fencing be bike rack, or is 8’ fence necessary? Does this need to be anti‐scale fence? (Page 4, #2.3.15) Bike rack (style) interlocking fencing is preferred.
12. Can you detail the first aid station needs. Does this need to be an enclosed tent? Does it need pipe and drape for privacy areas? What sizing? Any need for AC or HVAC in this tent? Power needs? (Page 3, Section 1 Scope, Paragraph 4)
13. Please elaborate on the “space needle style” ceiling view. Is this simply a clear ceiling for a view? (Page 4, #2.3.1)
14. Is flooring required for any tent? (page 6 diagrams)
15. Do you have a High Wind Action Plan, or will the client agree to a mutually defined Hight Wind Action Plan for safety in the outdoor environment?
16. The diagrams do not show egress around the outside of the chairs per Fire Marshall compliance. Can the tents be larger to accommodate the required egress?
17. In the diagrams, where do you envision your projectors to be placed? We want to ensure a viable location without losing seating. (page 6 diagrams)
18. Will we have parking for setup staff, semi and box truck deliveries, forklift parking, as well as an area for generator placement that has access to ground rod staking? (page 5 map)
19. Will you allow tent stakes to be placed in the asphalt, or will the ballast need to be concrete or water ballast?
(page 5 map)
20. Will we have access to a boneyard for placement of spare equipment during the run of show? (page 5 map)
21. Will we have access to a covered HQ or office for the duration of the event? If not, is there an area for us to set an additional staff tent or staff office trailer? (page 5 map)
22. The average September temperature in Seattle is a high of 67° and a low of 55° ‐ will you require heating or
HVAC in any of the tents?
23. Is there a requirement for Internet access?
24. Is there a requirement for restrooms?
25. We see the Solicitation and response form for the pricing, but do not see information on how to submit past performance or any additional technical volumes. Are there requirements or information for those additional volumes?
1. Vinyl sidewalls secured at base from flapping.
2. Laptops may need to be plugged in A/V circuit. Collaboration tent to have a coffee pot but should be supported by the A/V circuit. The Poster Tent to have uplighting circuits and may need to support one or two laptops.
3. No.
4. Prefer peak mounted (low noise).
5. No. ADA stage access not required.
6. Yes. Tables should include skirting. (see update)
7. No. Tents are small. Microphones are to support speaker if needed.
8. Amendment 003 changed the projector screen requirement to TV monitors.
9. Amendment 003 changed screens to TV monitors
10. Government will provide trash removal
11. Not intended to be an anti‐scalable fence.
12. Disregard First Aid station. No longer a tent requirement. See attached for amended statement.
13. Disregard, no clear ceiling necessary.
14. No.
15. Will work with vendor on mutually defined HWA plan, if necessary.
16. No. Tent plan has been approved by local FM and complies with NRNW Fire & Emergency Service
Requirements.
17. Amendment 003 changes projectors to elevated TV monitors with stands.
18. Parking will be available during set‐up and tear down only. Trucks and forklifts will not be able to remain during the event. Work with event coordinator for generator plan/requirements.
19. No tent stakes to the asphalt will be allowed. All tents to be secured using ballast, preferably concrete.
20. No boneyard space available for spare equipment.
21. No. Additional space for staff support not available.
22. No.
23. Internet access support by vendor not required.
24. Restroom support being provided by local facilities vendor.
25. Providing past performance is not required at this time
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
STATEMENT OF WORK
STATEMENT OF WORK FOR
2023 N AVAL INNOVATION SCIENCE AND ENGINEERING (NISE)
TECHNICAL EXCHANGE MEETING (TEM)
1. Scope Naval Undersea Warfare Center Weapons Division Keyport has a requirement to host a Three-day Department of Defense (DoD) sponsored technical event occurring September 12th, 13th, and 14th 2023 from 0700 (7:00 am) to 1600 (4:00 pm) PDT.
The event will be held at the Naval Undersea Museum and Parking Lot #5, Naval Undersea Warfare Center Division Keyport.
The contractor shall set up the event area no later than 1700 (5:00 pm), Wednesday, September 6th, 2023.
The contractor shall tear down all material/equipment used for the event by 1700 (5:00pm) Saturday, September 16th, 2023.
The contractor shall set up/tear down for the event and configure furniture for each of the following areas: Three Technical Presentations Tents, One Collaboration Tent, Poster Board Tent, and setup for Poster Board Session. All tents shall be spaced a minimum of 10’ from each other (reference diagram 1). Note: Tables and chairs not to scale in diagrams 2-4, 5-6.
2. Requirements
2.1. Breakout/Presenter Tents (reference diagram 2 and 3)
1. Three 30’x 50’ white walled tents with non-flapping sidewalls with two 3’ entry/exit points.
2. Portable 120V power supply and cabling to accommodate illumination and audio/visual needs.
3. High Bay Lighting, 100W, 120V to illuminate entire interior
4. Décor lighting, Sixpar Uplight, 1ea. per tent (Tents 1-3)
5. Stage: 6’ X 12’ X 2’
a. Skirting
b. Steps w/railing, and stage floor covering
c. 2 Tables w/skirting (Classroom 6’ X 18”)
d. 4 Non-Metal, Light Colored Chairs
6. Public Address (PA) Audio, battery or 120V with wireless lapel or handheld microphone
7. Elevated TV monitors (72in) computer interface capable, on rolling stand (5’-6’) in height. One per tent.
8. Two Powered Exit Signs
9. Two Secured Fire Extinguishers
10. Two 32 Gallon Trash cans
11. 100 Non-Metal, Light Colored Chairs, lecture style setup (300 total)
12. Ceiling fans, appropriate 1500 sq.ft. area
13. Barrier Fencing (crowd control/safety) 130 ft.
2.2. Collaboration Tent (reference diagram 3)
1. One 30’x 50’ white walled, window view tent with non-flapping, bay window sidewalls with two 3’ entry/exit points
2. Portable 120V power supply and cabling to accommodate illumination and audio/visual needs.
3. High Bay Lighting, 100W, 120V to illuminate entire interior
4. Two Powered Exit Sign
5. Two Secured Fire Extinguishers
6. Two 32 Gallon Trash cans
7. 32 Non-Metal, Light Colored Chairs
8. Four – 60” Round Tables w/Linen Drape Black
9. Four – 36” Round Bar Height Tables w/Linen Drape Black
10. 48 Non-Metal, Light Colored Chairs, (12 per 60” round table)
11. Ceiling fans, appropriate 1500 sq.ft. area
2.3. Poster Board Session Tent (reference diagram 4)
1. One 50’ x 100’ x 8’ white walled, window view tent with non-flatting sidewalls, with two 3’ entry/exit points.
2. Portable 120V power supply and cabling to accommodate illumination
3. High Bay Lighting, 100W, 120V to illuminate entire interior
4. Décor Sixpar Uplights, 8ea. (4 per long walls)
5. Two Powered Exit Sign
6. Two Fire Extinguisher
7. Two 32 gal. Trash Can
8. 12 – 36” Round Bar Height Tables w/Linen Drape Black (6 interior tables, 6 exterior tables)
9. Five – 60” Round Tables w/Linen Drape Black
10. 60 Non-Metal, Light Colored Chairs, (12 per 60” round table)
11. Two Tables (1ea. Classroom 6’ X 18”, 1ea. Classroom 3’ X 18”)
12. 10’ Pipe and Drape Black (stage back drop)
13. 80’ Pipe and Drape Black
14. Ceiling fans, appropriate 5,000 sq.ft. area
15. Barrier Fencing (crowd control/safety) 90 ft.
2.4. Subcontractors and Consultants: Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this contract. All applicable provisions of this SOW and contract shall flow down to subcontractors providing support under this contract.
2.5. Management of Contractor Personnel: The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, individual contractor employees. The contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services.
3. Security:
3.1. Contractor shall not have access to any CUI data or access to restricted facilities.
Diagram 1
Diagram 2
Diagram 3
Diagram 4
(End of Summary of Changes)
File details come from the government source that posted it. Updated .