DRAFT Exhibits A through AN.pdf
PDF 2 MB Posted
- Solicitation number
- N0025319R0015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT N0025319R0015 A through K (3NOV2020).docx | DOCX document | |
| DRAFT Attachments 1 and 2 and 4 through 13.pdf | ||
| DRAFT QUESTIONS and RESPONSES (1 to 8).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DRAFT Exhibit U
Exhibit Line Item Number (ELIN) Part / Drawing Number1 Nomenclature Minimum Quantity2 Maximum Quantity2 Step 1 Unit Price Step 1 Maximum Quantity Price Minimum Quantity2 Maximum Quantity2 Step 2 Unit Price Step 2 Maximum Quantity Price Minimum Quantity2 Maximum Quantity2 Step 3 Unit Price Step 3 Maximum Quantity Price Minimum Quantity2 Maximum Quantity2 Step 4 Unit Price Step 4 Maximum Quantity Price
U001 7265866 SHELL, FUEL TANK, SHORT 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
U002 6300766 32 SCREW,CAP,SOCKET HEAD,ALLOY,UNF-3A (Qty 2) 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
U003 7265888 BRACKET, GROUNDING, W6 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
U004 7265889 BRACKET, CLAMP - W6 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
U005 7608206 WASHER, FLAT (Qty 2) 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
U006 7608757 RING, RETAINING 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
U007 8290680 HOLDER CYLINDER 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
U008 8290355 PRESSURE LINE, C02 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
Maximum Quantity Total Price $ - Maximum Quantity Total Price $ - Maximum Quantity Total Price $ - Maximum Quantity Total Price $ -
NOTES
1. Part numbers are initially listed for ease of reference to the Technical Data Package (TDP) and will be updated with the appropriate Contractor assigned part numbers.
2. The Government's notional steps are shown for illustrative purposes only. Offeror must propose its steps and quantities in accordance with Section B Note B.
| &"Times New Roman,Regular"&12&A | &"Times New Roman,Bold"&12DRAFT&"Times New Roman,Regular" |
| PRODUCTION MK54 LWT EXERCISE FUEL TANKS | &"Times New Roman,Regular"&12N0025319R0015 |
CLIN / SLIN 2006
&"Times New Roman,Regular"&12Page &P &"Times New Roman,Bold"DRAFT
DRAFT Exhibit V
Exhibit Line Item Number (ELIN) Part / Drawing Number1 Nomenclature Minimum Quantity2 Maximum Quantity2 Step 1 Unit Price Step 1 Maximum Quantity Price Minimum Quantity2 Maximum Quantity2 Step 2 Unit Price Step 2 Maximum Quantity Price Minimum Quantity2 Maximum Quantity2 Step 3 Unit Price Step 3 Maximum Quantity Price Minimum Quantity2 Maximum Quantity2 Step 4 Unit Price Step 4 Maximum Quantity Price
V001 7265866 SHELL, FUEL TANK, SHORT 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
V002 6300766 32 SCREW,CAP,SOCKET HEAD,ALLOY,UNF-3A (Qty 2) 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
V003 7265888 BRACKET, GROUNDING, W6 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
V004 7265889 BRACKET, CLAMP - W6 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
V005 7608206 WASHER, FLAT (Qty 2) 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
V006 7608757 RING, RETAINING 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
V007 8290680 HOLDER CYLINDER 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
V008 8290355 PRESSURE LINE, C02 1 50 $ - $ - 51 100 $ - $ - $ - $ - $ - $ -
Maximum Quantity Total Price $ - Maximum Quantity Total Price $ - Maximum Quantity Total Price $ - Maximum Quantity Total Price $ -
NOTES
1. Part numbers are initially listed for ease of reference to the Technical Data Package (TDP) and will be updated with the appropriate Contractor assigned part numbers.
2. The Government's notional steps are shown for illustrative purposes only. Offeror must propose its steps and quantities in accordance with Section B Note B.
| &"Times New Roman,Regular"&12&A | &"Times New Roman,Bold"&12DRAFT&"Times New Roman,Regular" |
| PRODUCTION MK54 LWT EXERCISE FUEL TANKS | &"Times New Roman,Regular"&12N0025319R0015 |
CLIN / SLIN 3006
&"Times New Roman,Regular"&12Page &P &"Times New Roman,Bold"DRAFT
Exhibit A CDRLs CDRL Title DID REV.
A001 First Article Qualification Test Plan and Procedures
DI-NDTI-81307A &
DI-NDTI-80603A
P00000
A002 First Article Test Report DI-NDTI-80809B P00000
A003 First Article/POM, Warranty, FAT, & Periodic Failures DI-SESS-81927 P00000
A004 Corrective Action Plan DI-MGMT-80501 P00000
A005 Contractor's Progress and Status Report DI-MGMT-81928 P00000
A006 Pre-Factory Acceptance Test, HASS Failures DI-SESS-81927 P00000
A007 HASS & FAT Test Plans & Test Procedures DI-SESS-81704 P00000
A008 Hardware Analysis or Repair Form DI-MGMT-81868 P00000
A009 As Built Configuration List DI-CMAN-80874 P00000
A010 Solder Impact Analysis Report/Engineering Analysis DI-MISC-80508B P00000
A011 Program Management Plan DI-MGMT-81797 P00000
A012 Parts Management Plan DI-SDMP-81748 P00000
A013 System Engineering Management Plan (SEMP) DI-SESS-81785A P00000
A014 IBR,PRR,PMR, & IPT Minutes DI-ADMN-81505 P00000
A015 Workshop, PRR, PMR, IPT, & Safety Presentations DI-ADMN-81373 P00000
A016 Additional Workshop Materials DI-SESS-82168 P00000
A017 IBR Meeting Agenda DI-ADMN-81249B P00000
A018 SETR Design Review Information Package (DRIP) DI-SESS-81757A P00000
A019 Minimum Sustaining Rate (MSR) and Economic Order Quantity (EOQ) Report
DI-MGMT-82105 P00000
A020 Small Business Utilization Report DI-MGMT-82041B P00000
A021 Cost Data Summary Report (DD Form 1921) DI-FNCL-81565C P00000
A022 Functional Cost-Hour Report (DD Form 1921-1) DI-FNCL-81566C P00000
A023 Progress Curve Report (DD Form 1921-2) DI-FNCL-81567C P00000
A024 System Trouble Report DI-MISC-81807 P00000
A025 Data Accession List (DAL) DI-MGMT-81453B P00000
A026 Configuration Data Item Status List DI-SESS-81253E P00000
A027 Contractor's Configuration Management Plan DI-SESS-81875 P00000
A028 Engineering Change Proposal (ECP) DI-SESS-80639E P00000
A029 Notice of Revision (NOR) DI-SESS-80642E P00000
A030 Request for Variance (RFV) DI-SESS-80640E P00000
A031 Reliability and Maintainability Predictions Report DI-SESS-81497B P00000
A032 Test Verification Matrix DI-MISC-81283 P00000
A033 Software Development Methodology DI-IPSC-81427B P00000
A034 Safety Assessment Report (SAR) DI-SAFT-80102C P00000
A035 Quality Program Plan (QPP) DI-QCIC-81722 P00000
A036 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Metric Data
DI-MGMT-82275 P00000
A037 Calibration and Measurement Requirements Summary
(CMRS)
DI-QCIC-80278C P00000
A038 Factory Test Equipment Certification Plan DI-QCIC-81960 P00000
A039 Factory Test Equipment Validation Report DI-SESS-80792B P00000
A040 System Safety Management Plan DI-SAFT-81626 P00000 Page 1 of 4510/15/2020
CDRL Title DID REV.
A041 HMMP and P2 Plan DI-MGMT-81398C P00000
A042 Government Property Report DI-MGMT-80441D P00000
A043 Program Protection Implementation Plan (PPIP) DI-ADMN-81306 P00000
Page 2 of 4510/15/2020
Exhibit A CDRLs (cont.)
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0017 A TDP ____ TM ____ OTHER _NDTI_
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MK 54 COMMON PARTS N00253-20-R-TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 First Article Qualification Test Plan and
Procedures
SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-81307A, DI-NDTI-80603A SEE BLK 16 PMS 404
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
D (SEE BLK 16)
ASREQ (SEE BLK 16) SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE final
A N/A SEE BLK 16 draft reg repr
16. REMARKS NUWCDIVKPT 1 1 0
BLOCKS 3 & 5:
(a) PGA First Article Qualification and Procedures - SOW 3.1, 3.3.1, 3.6.1
(b) AB Upgrade Items Qualification and Procedure - SOW 3.1, 3.6, 3.6.1, 3.6.1.3
(c) CGA First Article Qualification and Procedures - SOW 3.1, 3.6, 3.6.1, 3.6.1.1
(d) IMU First Article Qualification and Procedures - SOW 3.1, 3.6, 3.6.1, 3.6.1.2
(e) W-6 Cable First Article Qualification and Procedures – SOW 3.1, 3.6, 3.6.1, 3.6.1.4
(f) Warshot Fuel Tank First Article Qualification and Procedures - SOW 3.1, 3.6, 3.6.1, 3.6.1.5
(g) Exercise Fuel Tank First Article Qualification and Procedures - SOW 3.1, 3.6, 3.6.1
BLOCK 4: DI-NDTI-81307A Paragraph 3.d. is deleted and replaced by DI-NDTI-80603A
BLOCK 8: Each draft First Article Qualification and Procedures document shall be submitted for government review NLT 45 days prior to each test event. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 30 days for government review.
BLOCK 9:
(a) DISTRIBUTION STATEMENT D - Distribution authorized to the U.S. Department of Defense, and
U.S. DoD contractors only. Critical Technology: (1 OCT 2020). Other requests for this document shall be referred to PEO SUB (PMS 404) or higher authorities.
(b) EXPORT CONTROL ACT WARNING: WARNING - This document contains tethnlcal data whose export is restricted by the Arms Export Conlrol Act (Title 22, U.S.C . Sec 2751. et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C. App. 2401 et seq.), as amended Violations of these export laws are subject to severe criminal penalties. Disseminate In aocordance with provisions at DoD Directive 5230.25.
(c) CLASSIFIED DOCUMENTS - Follow the procedures In DoD 5220.22-M, lndustrial Security Manual or DoD 5200.01, DoD lnformation Security Program. For unclassified, limited documents, destroy by any method that wil prevent disclosure of contents or reconstruction of the document
BLOCKS 10,12 & 13: Each First Article Qualification Test Plan and Procedures shall be submitted NLT 15 days after receipt of government comments on each respective draft First Article Qualification and Procedures.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data delivery to the addressess marked with ' * '. See Contract Section F, Item 0007.
NUWCDIVNPT 1 1 0
PMS 404 1 1 0
DCMA 1 1 0
PCO 0 1 0
CM-Pro 1 1 0
15. TOTAL - -> 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Andrea Hinds Package signature ELIN A043 page 45
OCT 15 2020
Gary Hall
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
0017 A TDP ____ TM ____ OTHER _NDTI_
A002 Test/Inspection Report SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
N/A N/A SEE BLK 16 draft reg repr
16. REMARKS NUWCDIVKPT 0 1 0
(a) PGA First Article Test Report - SOW 3.1, 3.3.1
(b) AB Upgrade Items First Article Test Report - SOW 3.1, 3.6, 3.6.1.3
(c) CGA First Article Test Report - SOW 3.1, 3.6, 3.6.1.1
(d) IMU First Article Test Report - SOW 3.1, 3.6, 3.6.1.2
(e) W-6 Cable First Article Test Report - SOW 3.1, 3.6, 3.6.1.4
(f) Warshot Fuel Tank First Article Test Report - SOW 3.1, 3.6, 3.6.1.5
(g) Exercise Fuel Tank First Article Test Report - SOW 3.1, 3.6
BLOCKS 10,12 & 13: Each Test/Inspection Report shall be submitted NLT 30 days following the successful completion of each test event in accordance with the SOW.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
NUWCDIVNPT 0 1 0
PMS 404 0 1 0
DCMA 0 1 0
CM-Pro 0 1 0
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
0017 A TDP ____ TM ____ OTHER _SESS_
A003 Failure Analysis and Corrective Action Report
(FACAR) (Navy)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81927 SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
(a) POM/First Article Failure Analysis – SOW 3.1.1, 3.36.4
(b) Warranty/GFE Failure Analysis - SOW 3.18.1, 3.36.4
(c) Factory Acceptance Test Failure Analysis - SOW 3.36.4, 3.36.8, 3.36.9
(d) Periodic Failure Analysis - SOW 3.5, 3.36.4
(e) Calibration Failure Analysis – SOW 3.36.12
BLOCK 4:
3.D. delete the word “Start” 3.N. delete “and phase” 3.O., 3.R.. 3.S., 3.V., 3.W., 3.X., 3.Z., 3.EE.(1) and 3.MM. are deleted 3.R. delete “, Developer’s Analysis of Problem (ref: TIR block 106)”
BLOCK 8: A Preliminary FACAR shall be submitted NLT 14 days after any BLKs 3 & 5 failed hardware event and does not require Government approved. A draft Final FACAR shall be submitted for government review NLT 60 days after each respective BLKs 3 & 5 (a) and (c) failure event or receipt of respective BLKs 3 & 5 (b) failed hardware. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 30 days for government review.
BLOCKS 10,12 & 13: Each Final FACAR addressing Government comments to draft shall be submitted NLT 14 days after reciept of comments (DARC) on each draft FACAR document.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Native Format;
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
15. TOTAL - -> 5 6 0
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
0017 A TDP ____ TM ____ OTHER _MGMT_
A004 Contractor's Corrective Action Plan SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80501 SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
(a) POM/First Article Corrective Action Plan - SOW 3.1.1, 3.38
(b) Systemic In-factory/HASS Corrective Action Plan - SOW 3.36.7, 3.38
(c) Factory Acceptance Corrective Action Plan - SOW 3.22.1, 3.36.8, 3.38
(d) Contractual Non-compliance/QASP Corrective Action Plan - SOW 3.38
(e) Periodic Test Corrective Action Plan - SOW 3.5, 3.38
BLOCK 8: Each draft Corective Action Plan shall be submitted for government review NLT 30 days after the related failure event occurence. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 30 days for government review.
BLOCKS 10,12 & 13: Each Corrective Action Plan shall be submitted NLT 15 days after receipt of government comments on each respective draft Corrective Action Plan.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A005 Contractor's Progress and Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81928 SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
MTHLY (SEE BLK 16) SEE BLK 16 b. COPIES
N/A SEE BLK 16 SEE BLK 16 draft reg repr
BLOCK 5: SOW 3.12, 3.25.1, 3.25.2, 3.25.4, 3.25.6, 3.25.7, 3.26.1, 3.26.7, 3.32
BLOCK 10,11,12 & 13: The first Contractor’s Progress, Status and Management Report submission shall be provided NLT 15 days after the end of the month in which the Program Baseline Review is conducted. Subsequent Contractor's Progress, Status and Management Reports shall be submitted NLT 15 days after each month thereafter.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A006 Failure Analysis and Corrective Action Report
(FACAR) (Navy)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81927 SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
MTHLY (SEE BLK 16) SEE BLK 16 b. COPIES
(a) Pre-Factory Acceptance Test Failure Analysis - SOW 3.22.1, 3.36.4, 3.36.6
(b) HASS Failure Analysis - SOW 3.22.2, 3.36.4, 3.36.6
BLOCK 4:
3.D. delete the word “Start” 3.N. delete “and phase” 3.O., 3.S., 3.Z., 3.EE.(1) and 3.MM. are deleted 3.R. delete “, Developer’s Analysis of Problem (ref: TIR block 106)”
BLOCKS 10,11,12 & 13: The first Final Failure Analysis and Corrective Action Report shall be submitted NLT 30 days after first BLK 3 & 5 item (a) or (b) test failure event and report can include multiple test failure events defined by BLOCKS 3 & 5 items (a) and (b). Subsequent reports shall be submitted monthly thereafter.
BLOCK 14: Electronic deliverables shall be delivered in the following media unless otherwise approved by the Government.
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A007 Test Plans/Test Procedures SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81704 SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
(a) HASS (Production Screening) Test - SOW 3.22.2
(b) Factory Acceptance Test - SOW 3.36.9.2
(c) Proof of Design Test – SOW 3.2
BLOCK 8: Each draft Test Plans/Test Procedures shall be submitted for government review NLT 45 days prior to test event. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 30 days for government review.
BLOCKS 10,12 & 13: Each Test Plans/Test Procedures shall be submitted NLT 14 days after reciept of government comments on each draft document.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Native Format;
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A008 Repair Parts Report Hardware Analysis or Repair Form
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81868 SOW 3.18.1, 3.36.11 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
BLOCKS 10,12 & 13: Hardware Analysis or Repair Forms shall be submitted in accordance with SOW 3.18.1, 3.34.11.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
---- SUBMISSION SHALL BE CLASSIFIED "SECRET//REL US ONLY" OR HIGHER, REGARDLESS OF CONTENT. Contact COR for direction.
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A009 CONFIGURATION DATA LISTS (CDLs) AS BUILT CONFIGURATION LIST (ABCL)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-80874 SOW 3.18.1, 3.28.10 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
BLOCKS 10,12 & 13: As Built Configuration List (ABCL) shall be submitted upon delivery of each unit of torpedo hardware and software from the Contractor’s facility.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
SEP 18 2020
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
0017 A TDP ____ TM ____ OTHER _MISC_
A010 Technical Report - Study/Services SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
(a) Solder Impact Analysis Report - SOW 3.24
(b) Environmental Engineering Analysis Report - SOW 3.28.8
(c) Hasardous Waste Generator Analysis Report - SOW 3.39
BLOCK 8: A draft Technical Report shall be submitted for government review NLT 30 days after to each BLK 3 & 5 requirement in accordance with the SOW. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 20 days for government review.
BLOCKS 10,12 & 13: Each Technical Report shall be submitted NLT 15 days after receipt of government comments to each draft Technical Report per BLKS 3 & 5.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
SEP18 2020
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A011 Program Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81797 SOW 3.25.1, 3.26.4, 3.26.4.2, 3.26.4.3 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
BLOCK 8: A draft Program Management Plan (PMP) shall be submitted for government review NLT 45 days before Integrated Baseline Review (IBR) and draft revisions to the PMP shall be submitted annually (if required). PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 30 days for government review.
BLOCKS 10,12 & 13: Program Management Plan (PMP) and revisions to the PMP shall be submitted NLT 15 days after receipt of government comments to draft PMP and draft PMP revisions. Subsequent draft revisions to the PMP shall be provided no more often than annually (if required).
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
- Schedule [Microsoft Project];
- See Blk 4 DID
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
0017 A TDP ____ TM ____ OTHER _STDZ_
A012 Parts Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SDMP-81748 SOW 3.25.2, 3.25.3 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
BLOCK 8: A draft Parts Management Plan shall be submitted for government review NLT 90 days after contract (DAC) and draft revisions to the Plan shall be submitted annually (if any changes required).
PMS 404 is the approving activity and approval will be for technical content and contractual acceptance.
Allow 30 days for government review.
BLOCKS 10,12 & 13: Parts Management Plan and revisions to the Parts Management Plan shall be submitted NLT 15 days after receipt of government comments to draft Parts Management Plan and its revisions. Subsequent draft revisions to the Parts Management Plan shall be provided no more often than annually (if changes required).
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A013 Systems Engineering Management Plan
(SEMP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81785A SOW 3.25.8 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
BLOCK 8: A draft Systems Engineering Management Plan (SEMP) shall be submitted for government review NLT 75 days after contract (DAC) and draft revisions to the SEMP shall be submitted annually (if changes required). PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 30 days for government review.
BLOCKS 10,12 & 13: Systems Engineering Management Plan (SEMP) and revisions to the SEMP shall be submitted NLT 10 days after receipt of government comments to draft SEMP and draft SEMP revisions. Subsequent draft revisions to the SEMP shall be provided no more often than annually (if required).
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
0017 A TDP ____ TM ____ OTHER _ADMN_
A014 Report, Record of Meeting/Minutes SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81505 SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
(a) IBR Meeting - SOW 3.26.1, 3.26.4.1
(b) TRR Meeting – SOW 3.26.1, 3.26.4.7
(c) PRR Meeting - SOW 3.26.1, 3.26.5
(d) PMR Meeting - SOW 3.26.1, 3.26.6.3
(e) IPT Meeting - SOW 3.26.1, 3.26.7
BLOCKS 10,12 & 13: Meeting Minutes shall be submitted NLT 15 days after each meeting event in accordance with BLKS 3 & 5.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A015 Presentation Material SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81373 SEE BLK 16 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
(a) Post Award Workshop Presentation - SOW 3.26.3.1
(b) TRR Presentation – SOW 3.26.4.7
(c) PRR Presentation - SOW 3.26.5
(c) PMR Presentation - SOW 3.26.6.2
(d) IPT Presentation - SOW 3.26.7*
(e) Safety Presentation - SOW 3.39.2
* IPTs are exempt from BLOCK 8 requirements.
BLOCK 8: A draft Presentation Material shall be submitted for government review NLT 30 days prior to each BLK 3 & 5 review. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 14 days for government review.
BLOCKS 10,12 & 13: Each Presentation Material (except IPT Presentation) shall be submitted addressing Government comments to the draft NLT 7 days after receipt of comments (DARC).
IPT Presentation Materials shall be provided no later than 2 days following each event.
Any substantive changes made to each Presentation Materials after the previious submittal shall cause for updated Presentation Material to be resubmitted NLT 7 days after each covered event.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A016 Technical Review Presentation Package
(TRPP)
Post Award Conference Materials
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-82168 SOW 3.26.3.1 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
ONE/R (SEE BLK 16) SEE BLK 16 b. COPIES
BLOCK 8: A draft Post Award Conference Materials shall be submitted for government review NLT 20 days prior to the event. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 10 days for government review.
BLOCKS 10,12 & 13: Additional Workshop Materials shall be submitted NLT 5 days after receipt of government comments to draft Additional Workshop Materials. If changes incorporated into materials after final submittal, updated Additional Workshop Materials shall be submitted NLT 10 days after post award conference event.
BLOCK 14: Electronic deliverables shall be delivered in the following media unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A017 Conference Agenda IBR Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81249B SOW 3.26.4.1 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
BLOCK 8: A draft IBR Meeting Agenda shall be submitted for government review NLT 30 days prior to each IBR event. PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 15 days for government review.
BLOCKS 10,12 & 13: IBR Meeting Agenda shall be submitted NLT 7 days after receipt of government comments to the draft IBR Meeting Agenda.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A018 Design Review Information Package (DRIP) SETR Design Review Information Package (DRIP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81757A SOW 3.26.4.4 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
BLOCK 8: A draft SETR Design Review Information Package (DRIP) shall be submitted for government review NLT 30 days prior to each SETR event (see BLK 5). PMS 404 is the approving activity and approval will be for technical content and contractual acceptance. Allow 20 days for government review.
BLOCKS 10, 12 & 13: SETR Design Review Information Package (DRIP) shall be submitted NLT 7 days after receipt of government comments on each draft DRIP.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Text Document [Searchable Adobe PDF or Microsoft Word];
- Presentation [Searchable Adobe PDF or Microsoft PowerPoint];
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A019 Minimum Sustaining Rate (MSR) and Economic
Order Quantity (EOQ) Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-82105 SOW 3.26.9.1 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
ANNLY (SEE BLK 16) SEE BLK 16 b. COPIES
BLOCKS 10,11,12 & 13: The first Minimum Sustaining Rate (MSR) and Economic Order Quantity (EOQ) Report shall be submitted NLT 20 days prior to IBR and subsequent MSR and EOQs shall be submitted annually thereafter throughout the contract period of performance.
BLOCK 14: Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.
- Spreadsheet [Microsoft Excel];
* For data submitted thru CM-Pro or delivered via other methods, only send email notification of the data
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A020 SMALL BUSINESS UTILIZATION REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-82041B SOW 3.26.9.2 PMS 404
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
ANNLY (SEE BLK 16) SEE BLK 16 b. COPIES
BLOCK 4: Delete “missile defense” in paragraph 3.b).
Delete “missile” in last sentence of paragraph 3.c).
BLOCKS 10,11,12 & 13: First Report shall be submitted no later than 10 months after contract award.
Subsequent Reports shall be submitted NLT 12 months from each precedent submittal throughout the period of performance of the contract.
BLOCK 14: Electronic deliverables shall be delivered in the following media…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .