N00253-15-T-0400.pdf
PDF 288 KB Posted
- Attached to
- Metal Finishing Tanks
- Solicitation number
- N00253-15-T-0400
About this file
Request For Quote
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00253-15-T-0400-04.pdf | ||
| N00253-15-T-0400-0003.pdf | ||
| N00253-15-T-0400-0002.pdf | ||
| N00253-15-T-0400-01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL UNDERSEA WARFARE CENTER
ATTN: JAMI TAYLOR
JAMI.TAYLOR@NAVY.MIL
610 DOWELL ST, BLDG 206
KEYPORT WA 98345-7610
360-396-5150
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
X
C9E
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
N00253-15-T-0400 23-Jun-2015
b. TELEPHONE NUMBER
360-396-5150
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 02 Jul 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
N00253
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE N00253 16. ADMINISTERED BY
NAVAL UNDERSEA WARFARE CENTER
RECEIVING OFFICER
ATTN: DIVISION KEYPORT SUPPLY OFFICER
BLDG 893
610 DOWELL STREET
KEYPORT WA 98345-7610
TEL: 360 396-2760 FAX:
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JAMI L. TAYLOR
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
332420
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
2 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
N00253-15-T-0400
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SOLICITATION INFORMATION
NOTE 1: Government Point of Contact for this Solicitation/Request for Quote (RFQ) is: Jami Taylor, Purchasing Agent, Phone: 360-396-5150, Fax: 360-396-7036, Email: jami.taylor@navy.mil
NOTE 2: All questions regarding this solicitation should be submitted in writing as soon as practicable after receipt of solicitation. Email questions to jami.taylor@navy.mil. Questions received after a reasonable time may not be entertained.
NOTE 3: Utilize the pages in this solicitation to list all unit prices, extended prices, manufacturers and their part numbers, along with description changes (if any). Each Item No. or “CLIN” must be filled out. Company quote forms may be used, but not substituted for a completed solicitation/amendment pages.
NOTE 4: If you cannot meet the requested delivery date/Period of Performance (POP), line through and replace with your availability. All line items must state the unit price and extended price. Quote quantities as stated in this
RFQ.
NOTE 5: Military Specification (MILSPEC) can be accessed on line at: http://assist.daps.dla.mil and offer electronic copies.
NOTE 6: Offers shall be FOB Destination in accordance with FAR Clause 52.247-34.
NOTE 7: Offeror shall supply Manufacturer and/or Service Provider’s information as requested in provision C.108. Supply city/state if in the United States and/or the country of origin if outside the United States.
NOTE 8: The government prefers submission of this RFQ by email or fax.
NOTE 9: Constructive Acceptance Timeframe is 28 days after receipt of material.
NOTE 10: On-site contractors must comply with NUWC Division, Keyport publication “Safety Requirements for Contractors and Subcontractors” and NUWC Division, Keyport publication “Contractor’s Guide to Environmental Compliance”. Both documents are incorporated in full by reference and are available at the following links:
http://www.navsea.navy.mil/nuwc/keyport/default.aspx and http://www.navsea.navy.mil/nuwc/keyport/Environmental/Policy.aspx.
NOTE 11: Performance under this contract requires the contractor to adhere to Operations Security (OPSEC) requirements. Explanation of these requirements is detailed in Section I of the Operations Security Guide for Defense Contractors available online at: http://www.navsea.navy.mil/nuwc/keyport/default.aspx; click on OPSEC Guide For Defense Contractors on the left-hand side.
NOTE 12: COMPLIANCE WITH SPECIFICATIONS
The offer must be determined to be technically acceptable before further consideration will be given.
As a part of the response to this Solicitation, Offerors must ensure that any product requirements called out for in the Statement of Work (SOW) are identified by manufacturer name and have descriptive commercial literature to demonstrate the capabilities. In the technical proposal there must be a determination written by the offeror that the supplied material meets or exceeds the Government’s performance requirements as set forth in the SOW, RFP, and any subsequent amendments.
If product literature does not clearly demonstrate compliance with the requirements of the SOW, the offeror must submit a Compliance/Exception document that clearly explains how the proposed product meets the SOW requirements. On a separate sheet of paper state: whether the offer complies or does not comply with the specifications; identify any “exceptions” to the specifications; and how the offered supplies/services differ from the applicable specification paragraph above. Failure to comply with this requirement may result in rejection of the offer.
It shall be the obligation of the contractor to exercise due diligence to discover and to bring to the attention of the contracting officer at the earliest possible time, in writing, any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other
NOTE 13: STANDARD WARRANTY
The Contractor shall extend to the Government the full coverage of any standard warranty normally offered in a similar sale, provided such warranty is available at no additional cost to the Government. Acceptance of the standard warranty does not waive the Government's rights under any "Inspection" clause that may be in the contract nor does it limit the Government's rights with regard to the other terms and conditions of this contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard warranty. The standard warranty period shall begin upon final acceptance of the applicable material and/or services listed in the Schedule.
The Contractor shall provide a copy of its standard warranty (if applicable) with its offer. The warranty covers a period of ____________ months (offeror is to insert number).
NOTE 14: Failure to provide all required information from this solicitation and any subsequent amendment(s) may deem your company to be considered non-responsive.
STATEMENT OF WORK
1. SCOPE
This specification reflects those salient characteristics that are essential to the minimum requirements of the Government for Modular Metal Finishing production lines. These systems are to include the installation and testing of the new equipment and the training of operators and maintenance personnel as specified herein. It is the Government’s intent that a single (primary) contractor be awarded this contract and be responsible for the accomplishment of all work detailed by this specification.
The systems are to be manual processing lines with a modular design concept, manufactured in sections to minimize installation time and materials. It shall consist of tanks, heaters, thermostats, and exhaust hoods integrated into two modular systems with electrical controls pre-wired and water lines and drains pre-plumbed to termination and inlet points. The systems shall be fabricated with single-point connections for utilities, waste water, and fume exhaust ducts.
This specification details two separate lines: one with four process tanks and the other with three process tanks.
Appendix A identifies the process tanks associated with each of these lines. These lines will be integrated with an existing metal finishing line at installation. For reference, these are manual lines – no hoist system is required – parts and racks will be handled manually by an operator or via an existing bridge crane. The majority of parts processed will be less than 1 cubic foot, with some parts up to 2’ x 2’ x 1’. The lines will be in operation for a single-shift each working day.
2. APPLICABLE DOCUMENTS
The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of an invitation for bids or a request for proposals shall apply.
2.1. THE CODE OF FEDERAL REGULATIONS
29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1926 Safety and Health Regulations for Construction
(Application for copies should be addressed to Superintendent of Documents, Government Printing Office, Washington, DC 20402)
2.2. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 National Electric Code NFPA 79 Electrical Standards for Industrial Equipment
(Application for copies should be addressed to National Fire Protection Association, 470 Atlantic Ave., Boston, MA 02210)
2.3. NATIONAL ELECTRICAL MANUFACTURERS’ ASSOCIATION (NEMA)
ICS Industrial Controls and Systems MGI Motors and Generators
(Application for copies should be addressed to the National Electrical Manufacturers’ Association, 2101 L Street, NW, Washington, DC 20037)
2.4 APPENDIXES
Appendix A: Tank Schedule
Appendix B: Installation Area Schematic
3. REQUIREMENTS:
3.1. GENERAL DESCRIPTION OF SYSTEM - This specification covers the minimum Government requirements for two manual Modular Metal Finishing production lines. One line is to be used for aluminum anodizing (Hardcoat or Type III), rinse, aluminum anodize dye and anodize seal; the second line is for anodize strip and cold and hot rinse. The modular finishing production lines shall be self-contained consoles, housing tanks, ancillary components and spill containment. The systems shall be designed and fabricated with single-point connections for utilities and services on each line.
3.2. WORK INCLUDED - The Contractor shall be responsible for the following:
Design, manufacture, test and configure all equipment required to provide a complete system as specified herein.
Supply, equip, and configure the anodize process tank with all the ancillary equipment specified herein.
The operational testing and configuration of the system, in accordance with the requirements specified herein.
Complete documentation and organization of all technical data which applies to the operation, maintenance, repair, and testing of the specific equipment.
Installation of the machine and all identified accessories/options at the Naval Undersea Warfare Center (NUWC), Division Keyport facility. Installation location within the facility shall be as shown in Appendix B.
Connection of all utilities and services (including electricity, water, air, ventilation, and drains) from the modular lines to Government furnished mains located within 20 feet of the lines.
Demonstrate operational performance of the installed systems and all ancillary equipment.
Provide training to personnel on the proper operation and maintenance of the installed equipment and its component parts.
3.3. WORK NOT INCLUDED - The activity (NUWC, Division Keyport) will provide:
Utility services (to within 20 feet of the installation site) as required for the proper operation of the equipment, unless otherwise stated herein. The Government will supply the following utilities:
Shop Air (90 PSI minimum)
Industrial Water (150 GPM minimum)
Electrical (120V, single phase, 100 Amps; 208V, 3 phase, 100 Amps; 480V, 3 phase, 200 Amps)
Exhaust Ductwork to Fan/Scrubber
Wastewater Drain (3” Line nominal)
It is the vendor’s responsibility to make final connections to these utilities at the time of installation.
The vendor shall provide the Government with a list of system utility requirements within 4 weeks after contract award and no less than 12 weeks prior to delivery of the system. The vendor shall identify requirements for each utility (e.g., electrical voltage and amperage, ventilation CFM, water GPM, air pressure, and piping sizes). Vendor shall identify approximate locations of service requirements. The Government will provide the services within 20 feet of the identified location.
3.4. CONDITIONS OF SERVICE AND PERFORMANCE: - The following service and operational conditions shall apply to the equipment delivered under this specification.
3.4.1. The proposed system will be operated in an industrial environment and shall be capable of continuous operation over an extended period of time with minimal maintenance and upkeep.
3.4.2. The proposed systems shall be installed in an industrial manufacturing facility. The building layout, monuments, and utilities require that each proposed line fit within the following site dimensions.
3.4.2.1. Line 1: Anodize, Rinse, Dye, Seal:
Maximum Overall System Length (Left-to-Right): 16 Feet Maximum Overall System Width (Front-to-Back): 6 Feet Maximum Overall System Height: 10 Feet Maximum Work Height (Grated Floor-to-Tank Lip) 3.25 Feet
3.4.2.2. Line 2: Anodize Strip, Rinse:
Maximum Overall System Length (Left-to-Right): 14 Feet Maximum Overall System Width (Front-to-Back): 6 Feet Maximum Overall System Height: 10 Feet Maximum Work Height (Grated Floor-to-Tank Lip) 3.25 Feet
Access to Facility: The facility is accessed via a loading dock (4’ elevation from street). Entrance to the facility where the equipment is to be located is through a roll-up door with the following dimensions: 10’ Wide x 11’ High.
The supplied finishing lines (and any material movement equipment) must be able to pass through this access.
Siting Equipment: The modular units will be placed on top of an existing grated floor in the facility. The floor is rated for: 250 lbs./sq. ft total floor capacity and a point load (or concentrated load) of 3000 lbs/20 in. square.
Note: Forklifts are NOT permitted in the facility; vendor will have to supply appropriate material handling equipment to move and position the modular lines.
Maximum Working Height: The maximum working height (distance between grated floor and tank lip) is 39” (minimum working height is 36”).
Utilities and Services: All utilities and services are located under the grated floor in a utility area below the installation site for the modular line. This utility area has a height of 8 to 9 feet between the grated shop floor and the concrete subfloor).
3.4.3. Pre-Production Drawings – Prior to the start of manufacture, the vendor shall supply a drawing and description of the general arrangement of the module and proposed equipment for Government review and approval.
NOTE: The Government acceptance of the general arrangement drawing does not relieve vendor of responsibilities noted elsewhere in this specification. Vendor shall ensure compliance with the system features and descriptions contained herein.
3.4.4. Environmental Conditions - The unit shall be designed to operate in a non-air conditioned manufacturing building in an industrial environment.
3.4.5. Electrical - The proposed system shall not require more than 120V, single phase, 100 Amps; 208V, 3 phase, 100 Amps; and 480V, 3 phase, 200 Amps, of electrical power in its fully configured and operational state.
3.4.6. Water - The proposed system shall not require more than 150 GPM of water in its fully configured and operational state.
3.4.7. Drains - The proposed system shall not require more than a 3” drain line for discharge of wastewater in its fully configured and operational state.
3.4.8. Ventilation - The proposed system shall not require more than 10,000 CFM of ventilation in its fully configured and operational state.
3.4.9. Compressed Air - Compressed air available is 90 PSIG and 100 cubic feet per minute (nominal). If the proposed system requires more air than indicated above, the excess capacity shall be provided as part of the equipment. Any proposed compressed air system shall include a regulator(s) and a filter(s) with an automatic drain.
3.5. GENERAL EQUIPMENT REQUIREMENTS:
3.5.1. Standard, Off-the-Shelf Components - All materials and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service except as required for factory testing.
Standard, off-the-shelf components with proven reliability shall be used wherever possible to increase performance reliability and reduce costs. This requirement applies to components installed on the new equipment and replacement parts needed for future repairs and maintenance. The equipment shall be complete, so that when connected to the utilities identified herein, it can be used for the function for which it is designed and constructed.
3.5.2. Personnel Safety And Health Requirements - All parts, components, mechanisms, and assemblies furnished on the unit shall comply with all specific requirements of “OSHA Safety and Health Standard (29 CFR 1910), General Industry” that are applicable to the equipment itself. Covers, platforms, guardrails, and other safety devices shall be provided for all parts of the equipment that present a safety hazard. The safety devices shall prevent unintentional contact with the guarded part. Additional safety and health requirements shall be as specified in other paragraphs of this specification.
3.5.3. OSHA Approved - The equipment specified herein shall be in compliance with the applicable OSHA regulations and be listed by one of the OSHA accredited laboratories or approved in accordance with CFR Title 29, Chapter XVII, Part 1910 and installed in accordance with applicable NEC/NFPA requirements.
3.5.4. Energy Isolating Devices - Equipment provided by the contract shall provide energy isolating devices (e.g., safety switches, valves, etc.), to protect personnel from hazardous energy. The Contractor shall ensure that all energy-isolating devices installed or modified are capable of being locked. This includes both mechanical and electrical devices. An energy-isolating device shall be installed as the first energy control device on all major components of the system such that the component can be isolated at the component level.
3.5.5. Environmental Protection - The unit shall be designed and constructed so that during the operation, service, transportation and storage conditions described herein including final disposal, the equipment will comply with all applicable Environmental Protection Agency (EPA) and Occupational Safety and Health Agency (OSHA) and State of Washington Department Of Ecology (WDOE) restrictions for materials classified as hazardous to the environment in effect on the date of the contract.
3.5.6. Hazardous Material Exclusions - Hazardous materials shall not be brought on site without prior approval of the Contracting Officer. Hazardous materials not needed for this project are prohibited. Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of Federal Standard No. 313.
3.5.6.1. Notwithstanding any other hazardous material usage permitted in this contract, radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, cadmium, lithium, methylene chloride, lead (= or >0.06%), or polychlorinated biphenyls (PCB’s) are prohibited.
3.5.6.2. Class I Ozone Depleting Substances as defined in 40 CFR Part 82 shall not be used in the performance of this contract, or be provided as part of the equipment.
3.5.6.3. Exceptions to the prohibition of these materials must be referred to the Contracting Officer in writing, for consideration prior to contract award.
3.5.6.4. Material Safety Data Sheets (MSDS) - In accordance with FAR 23.3, offerors and contractors are required to submit Material Safety Data Sheets (MSDS’s) whenever the supplies being acquired or supplies used during performance are identified as hazardous materials. Hazardous Materials shall include any material which, by virtue of its potentially dangerous nature (e.g., toxic, flammable, corrosive, oxidizing, irritating, sensitizing, reactive), requires controls in its use, packaging, handling, storage, or stowage, to assure adequate safety to life and property. This definition is intended to apply to proprietary industrial, commercial, or locally prepared blends, mixtures, formulations, or compounds of gases, liquids, and solids intended for use at the job site. Any other material that has been designated by a Government technical representative as potentially hazardous and requiring safety controls shall also be supplied with an MSDS. MSDS’s are to be available at work sites where materials are being used.
3.5.7. Painting - All surfaces shall be painted in conformance with the manufacturer’s standard practices and good workmanship. Painting shall result in a highly wear- and corrosion-resistant finish which guarantees continued protection to the surfaces covered against the specified environment under all service conditions. The manufacturer’s standard color shall be provided. Lead-based or chromium-based paints are prohibited.
3.5.8. Caution - Warning Plates - Corrosion resistant “Caution” or “Warning” plates shall be securely attached to the equipment in visible locations, with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the plates.
3.5.9. Identification Plate - An identification plate shall be furnished with the equipment. A nameplate shall be affixed to the system showing the manufacturer’s name, year of manufacture, and any other pertinent information for identifying the system.
3.5.10. All Electrical Components including motors, starters, relays, switches, and wiring shall conform to and be located in accordance with the applicable NFPA, NEMA, and ANSI standards for the intended application.
3.5.10.1. Power Disconnect - A supply circuit disconnect device, either a fusible motor circuit switch or circuit breaker, shall be provided and installed on the equipment.
3.5.10.2. Control Circuits - Main and auxiliary control circuits shall operate on a circuit of 120 volts or less derived from isolation transformers integral with the equipment.
3.6 EQUIPMENT AND SERVICES TO BE PROVIDED:
Two Modular Metal Finishing production lines to include the tanks described in the Tank Schedule table (see Appendix A). The modular lines shall have the following minimum features:
3.6.1 Anodizing Line, includes anodize (Type III), rinse, anodize dye and anodize seal.
3.6.1.1 Tank Construction
3.6.1.1.1 Tanks shall be constructed of material compatible with the solution they are to contain. Materials shall be as described on the Tank Schedule table. All tanks are to be supported to minimize deflection and buckling when filled with solution and heated to operating temperature. Heated and chilled tanks are to be insulated
(2” rigid, minimum) to minimize heat loss and shall have a PVC exterior shell outer jacket to protect the insulation.
3.6.1.1.2 All tank materials shall be selected for compatibility with the solution and operating parameters. Minimum material thicknesses shall be as follows:
Stainless Steel: 3/16” Type 316 Steel: 1/4” mild steel Polypropylene: ½” sidewalls, ¾” bottom PVC Liner: 3/32 sidewalls, 3/16” bottom, appropriately bonded to tank
Tanks shall be supported to prevent deflection while filled with solution. Supports shall be corrosion-resistant materials or otherwise coated to prevent deterioration and corrosion.
3.6.1.1.3 Rinse tank shall have overflow weirs and 2” drain outlets capable of accommodating 30 gallons per hour (minimum) overflow rate.
3.6.1.2 Electrical
3.6.1.2.1 All wiring shall meet the standards of the NEC. Safety interlock switches shall be installed as necessary.
Wiring is to be installed in PVC conduit. All junction boxes are to be NEMA 4X construction. Console is to be pre-wired for a single point connection at the installation facility.
3.6.1.3 Plumbing
3.6.1.3.1 Inlets and drains shall be hard plumbed with Schedule 80 PVC except where temperature and chemical composition of solutions dictates other materials to be more appropriate (refer to Tank Schedule table for operating temperatures and solution constituents).
3.6.1.3.2 Process feed water lines shall be ½” Schedule 80 PVC. A PVC ball valve flow control shall be installed at each process tank. Process lines shall terminate above the solution level and shall be secured with a PVC clamp. Cold Water Rinse feed lines shall be ½” Schedule 80 PVC. The Anodize Dye Seal feed lines shall be ½” PVDF (e.g., Kynar). All rinse tanks shall have a PVC ball valve flow control shall be installed at each rinse tank. Rinse water lines shall extend to the bottom of the tanks, terminating in a 90-degree elbow facing the opposite side of the tank. Rinse water lines shall be secured with a PVC clamp at the top of the tank.
3.6.1.3.3 Hose bibs with valves and 3/4” threaded outlets shall be plumbed at two locations on the line –the left-side and right-side. The hose bibs shall be accessible from the front (operator) side of the console.
3.6.1.3.4 Bottom drains shall be installed on the Cold Water Rinse tanks. Rinse tanks shall also have overflow outlets at the top of the tank (as described 3.6.1.1.3).
3.6.1.3.5 Inlets and drains shall be pre-plumbed for single-point connection at the installation facility.
3.6.1.4 Ventilation
3.6.1.4.1 Exhaust hoods, plenums, and slots shall be designed IAW the standards of the ACGIH. All ventilation duct components to be fabricated of PVC Type I, Grade I (dark gray) and/or PVC Type II, Grade I (light gray) fire-retardant material or of solid fiberglass construction. Exhaust ventilation shall be provided on all tanks except for Cold Water Rinses. Hoods may be push/pull or pull/pull as recommended in the standard practices of the ACGIH. All tanks (other than Cold Water Rinse) shall have minimum ventilation as recommended by ACGIH practices for the contents, operating temperature and surface area of the tank.
The ductwork shall include balancing dampers at every drop. All hoods shall have a downward draw.
Ducting shall be interconnected into a main trunk line that is to exhaust through the floor below the unit.
Ducting is to be designed for a single point connection under the facility support floor to a Government supplied duct connected to a scrubber and fan.
3.6.1.4.2 Push Blower: If vendor designs ventilation system to be push/pull, a push air blower shall be supplied by the manufacturer and appropriately sized for the application.
3.6.1.5 Heating
3.6.1.5.1 All heated tanks are to be supplied with electric immersion heaters capable of heating the given solution to the specified temperature (IAW Tank Schedule table) within 4 hours. Immersion heaters may be either bottom or over-the-side style. Immersion heaters shall be constructed of materials compatible with the solution identified for the specified tank. A liquid level controller shall also be installed on each heated tank and integrated with the immersion heater to turn off power to the heater when solution reaches a low level. Digital temperature controllers shall be installed on all heated tanks. Digital temperature indicators shall be mounted on each heated tank. Single point connections shall be provided for connection to installation facility’s electrical power.
3.6.1.6 Air Agitation
3.6.1.6.1 All tanks identified on the Tank Schedule to have air agitation shall be supplied with air agitation spargers and control valve. Materials shall be compatible with the process solution and operating temperatures. The Anodize Dye Seal and the Anodize Strip tank in-solution lines shall be constructed of PVDF (e.g., Kynar).
Spargers shall be positioned along the bottom of the identified tanks and held down with plastisol coated weights or bottom mounted clips. A PVC ball valve shall be installed to regulate airflow to each station.
Each air agitated tank shall be supplied with an agitation flow rate of 20 CFM minimum.
3.6.1.6.2 Air Agitation Blower - The vendor shall connect the tank line agitation air lines to an existing Government air supply system, excepted as noted in 3.4.9.
3.6.1.7 Superstructure
3.6.1.7.1 Rails, skids, mounting, and supporting structure of the modular finishing line shall be fabricated of corrosion resistant steel coated with a chemical-resistant epoxy material, or encapsulated steel. Materials must be resistant to the process chemicals and operating environment. All module interconnections and mounting shall be accomplished with stainless steel Type 316 fasteners and hardware.
3.6.1.8 Catch Pan (Secondary Containment)
3.6.1.8.1 An integral polypropylene catch basin shall be provided for each module. Catch basin shall have a minimum capacity of 110% of the largest tank volume.
3.6.1.9 Tank Covers
3.6.1.9.1 All tanks shall be supplied with tank covers to cover the solutions during periods of inactivity. Covers shall be constructed of materials compatible with the solution in the tank. Lids shall weigh no more than 25 lbs.
each.
3.6.1.10 Signage – Tank Labels
3.6.1.10.1 Each tank shall be labeled to identify the solution. Solution nomenclature is noted on the Tank Schedule. Signs shall be engraved plastic with a minimum of 1-1/2” high lettering. Signs shall be securely affixed to the module/tank and mounted so as to be visible to the operator from the working side (front) of the modular line.
3.6.1.11 Type III (Hardcoat) Anodize Tank Ancillary Equipment
As a part of this specification, vendors shall supply and equip the identified Type III Anodize tank (Tank No. 1 on the Tank Schedule – see Appendix A) as a fully-functional, turn-key, anodize system. This shall include providing the necessary equipment (identified below) and integrating it into the fabrication and installation of the Modular Metal Finishing Line.
3.6.1.11.1 Equipment: This anodize system shall include the following components:
Chiller System - Government Supplied Equipment; Contractor shall connect the modular line to this system.
Rectifier – Government Supplied Equipment; Contractor shall connect the modular line to this system.
Buss Bars – Copper rods, 1.5” diameter (minimum); three buss bars are required: two to support the cathodes; one to support the anode (work piece). The anode bar shall have a short copper plate brazed to each end of the bar – allowing it to slide along the Copper Plate (described below) that is mounted on the tank lip Saddles – Bronze saddles shall be provided to support the two cathode copper rods, 1.5” diameter (minimum);
Copper Plate – A copper plate shall be mounted to the tank lip and electrically connected to the rectifier.
The plate must be electrically isolated from the tank. The anode copper rod (supporting the work piece) Copper rods, 1.5” diameter (minimum); three buss bars are required: two to support the cathodes; one to support the work piece
Cathodes – Government Supplied Equipment Control Panel Government Supplied Equipment; Contractor shall connect the modular line to this system.
3.6.1.11.2 Installation: Cathode Buss Bars and saddles shall be mounted on tank with electrical connection to control panel and rectifier. Cathode Buss Bars shall rest on the bronze saddles. A central buss bar to suspend the work pieces shall be removable and supported by copper plate. Buss bars shall be electrically connected to the rectifier with appropriately sized cables to support the electrical load. Buss bars shall be orientated in a Left-to- Right configuration (i.e., along the 30-inch width of the tank). The heat exchanger shall be plumbed by the Contractor to the Government supplied chiller system.
3.6.2 Anodize Strip Line, includes anodize strip and cold and hot rinse tanks.
3.6.2.1 Tank Construction
3.6.2.1.1 Tanks shall be constructed of material compatible with the solution they are to contain. Materials shall be as described on the Tank Schedule table (Appendix A). All tanks are to be supported to minimize deflection and buckling when filled with solution and heated to operating temperature. Heated and chilled tanks are to be insulated (2” rigid, minimum) to minimize heat loss and shall have a PVC exterior shell outer jacket to protect the insulation.
3.6.2.1.2 All tank materials shall be selected for compatibility with the solution and operating parameters. Minimum material thicknesses shall be as follows:
Stainless Steel: 3/16” Type 316 Polypropylene: ½” sidewalls, ¾” bottom
Tanks shall be supported to prevent deflection while filled with solution. Supports shall be corrosion-resistant materials or otherwise coated to prevent deterioration and corrosion.
3.6.2.1.3 Rinse tanks shall have overflow weirs and 2” drain outlets capable of accommodating 30 gallons per hour (minimum) overflow rate.
3.6.2.2 Electrical
3.6.2.2.1 All wiring shall meet the standards of the NEC. Safety interlock switches shall be installed as necessary.
Wiring is to be installed in PVC conduit. All junction boxes are to be NEMA 4X construction. Console is to be pre-wired for a single point connection at the installation facility.
3.6.2.3 Plumbing
3.6.2.3.1 Inlets and drains shall be hard plumbed with Schedule 80 PVC except where temperature and chemical composition of solutions dictates other materials to be more appropriate (refer to Tank Schedule table for operating temperatures and solution constituents).
3.6.2.3.2 Process feed water lines shall be ½” Schedule 80 PVC. A PVC ball valve flow control shall be installed at each process tank. Process lines shall terminate above the solution level and shall be secured with a PVC clamp. Cold Water Rinse feed lines shall be ½” Schedule 80 PVC. The Anodize Strip and hot water rinse feed lines shall be ½” PVDF (e.g., Kynar). All rinse tanks shall have a PVC ball valve flow control shall be installed at each rinse tank. Rinse water lines shall extend to the bottom of the tanks, terminating in a 90-degree elbow facing the opposite side of the tank. Rinse water lines shall be secured with a PVC clamp at the top of the tank.
3.6.2.3.3 Hose bibs with valves and 3/4” threaded outlets shall be plumbed at two locations on the line –the left-side and right-side. The hose bibs shall be accessible from the front (operator) side of the console.
3.6.2.3.4 Bottom drains shall be installed on the Cold Water Rinse tanks. Rinse tanks shall also have overflow outlets at the top of the tank (as described 3.6.2.1.3).
3.6.2.3.5 Inlets and drains shall be pre-plumbed for single-point connection at the installation facility.
3.6.2.4 Ventilation
3.6.2.4.1 Exhaust hoods, plenums, and slots shall be designed IAW the standards of the ACGIH. All ventilation duct components to be fabricated of PVC Type I, Grade I (dark gray) and/or PVC Type II, Grade I (light gray) fire-retardant material or of solid fiberglass construction. Exhaust ventilation shall be provided on all tanks except for Cold Water Rinses. Hoods may be push/pull or pull/pull as recommended in the standard practices of the ACGIH. All tanks (other than Cold Water Rinse) shall have minimum ventilation as recommended by ACGIH practices for the contents, operating temperature and surface area of the tank.
The ductwork shall include balancing dampers at every drop. All hoods shall have a downward draw.
Ducting shall be interconnected into a main trunk line that is to exhaust through the floor below the unit.
Ducting is to be designed for a single point connection under the facility support floor to a Government supplied duct connected to a scrubber and fan.
3.6.2.4.2 Push Blower: If vendor designs ventilation system to be push/pull, a push air blower shall be supplied by the manufacturer and appropriately sized for the application.
3.6.2.5 Heating
3.6.2.5.1 All heated tanks are to be supplied with electric immersion heaters capable of heating the given solution to the specified temperature (IAW Tank Schedule table – Appendix A) within 4 hours. Immersion heaters may be either bottom or over-the-side style. Immersion heaters shall be constructed of materials compatible with the solution identified for the specified tank. A liquid level controller shall also be installed on each heated tank and integrated with the immersion heater to turn off power to the heater when solution reaches a low level. Digital temperature controllers shall be installed on all heated tanks. Digital temperature indicators shall be mounted on each heated tank. Single point connections shall be provided for connection to installation facility’s electrical power.
3.6.2.6 Air Agitation
3.6.2.6.1 All tanks identified on the Tank Schedule to have air agitation shall be supplied with air agitation spargers and control valve. Materials shall be compatible with the process solution and operating temperatures. The Anodize Dye Seal and the Anodize Strip tank in-solution lines shall be constructed of PVDF (e.g., Kynar).
Spargers shall be positioned along the bottom of the identified tanks and held down with plastisol coated weights or bottom mounted clips. A PVC ball valve shall be installed to regulate airflow to each station.
Each air agitated tank shall be supplied with an agitation flow rate of 20 CFM minimum.
3.6.2.6.2 Air Agitation Blower - The vendor shall connect the tank line agitation air lines to an existing Government air supply system, excepted as noted in 3.4.9.
3.6.2.7 Superstructure
3.6.2.7.1 Rails, skids, mounting, and supporting structure of the modular finishing line shall be fabricated of corrosion resistant steel coated with a chemical-resistant epoxy material, or encapsulated steel. Materials must be resistant to the process chemicals and operating environment. All module interconnections and mounting shall be accomplished with stainless steel Type 316 fasteners and hardware.
3.6.2.8 Catch Pan (Secondary Containment)
3.6.2.8.1 An integral polypropylene catch basin shall be provided for each module. Catch basin shall have a minimum capacity of 110% of the largest tank volume.
3.6.2.9 Tank Covers
3.6.2.9.1 All tanks shall be supplied with tank covers to cover the solutions during periods of inactivity. Covers shall be constructed of materials compatible with the solution in the tank. Lids shall weigh no more than 25 lbs.
each.
3.6.2.10 Signage – Tank Labels
3.6.2.10.1 Each tank shall be labeled to identify the solution. Solution nomenclature is noted on the Tank Schedule. Signs shall be engraved plastic with a minimum of 1-1/2” high lettering. Signs shall be securely affixed to the module/tank and mounted so as to be visible to the operator from the working side (front) of the modular line.
3.6.3 PRE-SHIPMENT TESTING - The system shall be assembled and tested at the manufacturer’s facility prior to shipment. All tanks are to be filled with water to verify tank and line integrity and proper heat-up times. All lines shall be pressure tested to insure integrity. Accessory equipment shall be tested to ensure functionality and conformance to this specification. Heaters shall be tested to ensure conformance with specified heat-up rates. At its discretion, the Government may send representative(s) to witness the demonstration of the system over its full range of operation. Vendor shall notify the Government 15 days prior to factory testing.
3.6.4 CONTRACTOR INSTALLATION AND SET-UP - The vendor is responsible for the shipment, delivery, installation, and operational demonstration of the system at NUWC Keyport, WA. The Modular Metal Finishing Systems and all associated equipment shall be shipped, assembled, installed, set-up and tested by the contractor in the area designated as its functional work area by the Receiving Activity Point-of-Contact .The contractor shall provide all personnel, equipment, and supplies (including rigging service) necessary for the complete installation and set-up of the proposed system. The vendor shall connect all utilities and services within the modular system and make the final connection points to the Government supplied plant services as described elsewhere in this document. Installation and utility connections shall be in conformance with all federal, state, and local codes.
3.6.4.1 Contractor Transporting and Installation Services - The vendor is responsible for transporting and installing the modular systems. This includes, but is not limited to, the following tasks:
Loading and Shipping: Vendor will load and ship the system from the manufacturing plant to the
Government destination.
Unload: Vendor will unload all equipment at the Government destination and move it to the final equipment location in the facility.
Setting Modules: Vendor will set modules in place, align and secure sections, and make all service and utility interconnections.
Structural Support: Vendor will install all necessary frames, braces, and anchors to secure the equipment and modules in place.
Final Utility and Service Connections: Vendor will connect all utilities and services (including electricity, water, air, and drains) from the modular lines to Government furnished mains located within 20 feet of the line. Vendor shall install all necessary support brackets for securing the connecting lines.
3.6.4.2 Lifting And Rigging Services - The contractor shall provide all material handling equipment necessary to unload equipment, transport equipment to the installation site and any other equipment (such as forklifts, man-lifts, etc.) necessary for continuous support of the installation and shall provide qualified personnel to operate it.
NOTE: The use of privately owned cranes by contractor personnel at the installation site is restricted.
Contractors requiring cranes in the performance of this contract shall provide the activity with sufficient information (loads, locations, time, etc.) for arranging support services and approvals.
3.6.4.3 Coordination - The Contractor shall coordinate an installation schedule with the Receiving Activity Point of Contact. The Contractor shall coordinate the delivery of materials in a manner which causes minimum disruption/interference with the activity’s normal business routine.
3.6.4.4 Work Process - The Contractor shall provide a full-time field supervisor to direct installation and testing.
The field supervisor shall have full authority to implement his field decisions in an expeditious manner.
No work shall be accomplished when the field supervisor is not in the immediate work area.
3.6.4.5 Methods And Schedules - The work shall be executed in a manner and at such times as to cause the least practicable disturbance to the occupants of the buildings and normal activities of the facility. Before starting any work, the sequence of operations and methods of conducting the work shall have been reviewed and approved by the activity.
3.6.4.6 Prior To Commencing Work, the Contractor representative(s) shall meet in conference (i.e. conference call) with the activity Point-of-Contact, shop supervision, and other necessary personnel to discuss and develop a mutual understanding relative to safety, methods and schedules, security, and any other subject necessary for a smooth and successful operation.
3.6.4.7 Material Lockout and Tagout Program - Upon contract award, the Government will provide the Contractor with a copy of the lockout and tagout controls used by the Government facility where the equipment is to be installed Within fifteen (15) days after contract award and prior to commencement of work, the contractor shall submit and exchange lockout/tagout program/procedures with the Government’s representative. The Contractor is required to meet with the government representative to discuss lockout/tagout interface. The Contractor will be using their lockout/tagout procedures IAW 29 CFR 1910.147.
3.6.4.8 Clean-Up - After installation is complete, vendor will touch-up paint any damaged coating. Vendor will remove and dispose of all dunnage and debris from the shipment, packaging, and installation of equipment.
3.6.5 INSTALLATION SUPPORT SERVICES PROVIDED BY THE GOVERNMENT - The activity will provide the following in support of the installation:
3.6.5.1 Receiving Activity Point-of-Contact - Upon contract award, the receiving activity (NUWC, Division Keyport) shall designate a Receiving Activity Point-of-Contact who shall be responsible for appropriate surveillance and coordination of all services to be performed under this contract. The Receiving Activity Point-of-Contact shall serve as the Contractor’s primary contact for all interaction with the Government activity.
3.6.5.2 Utilities - Industrial water supply (150 GPM), shop air (90 PSI), wastewater drain plumbing (3” diameter PVC), ventilation duct connected to air scrubber, electricity (120V, 100 A/208V, 100A/480V, 200A) shall be made available adjacent (within 20 feet) to the assembly site at no cost to the contractor. All utility services will be located below grade in the utility basement of the facility.
NOTE: The Contractor shall be responsible for any costs incurred in connecting, converting and transferring these utilities to the modular system.
3.6.5.3 Storage - Lay-down area will be provided within the vicinity of installation site for storage of Contractor materials and tools. The Government does not accept responsibility for security of Contractor’s materials or tools. The area must be kept clean and orderly, free of rags, paper and other debris. Failure to maintain area in a clean condition may result in the loss of the area. The Contractor shall be responsible to restore the storage area to original condition after use.
3.6.5.4 Disposal Of Hazardous Waste - NUWC, Division Keyport is the owner of all hazardous waste generated within its facilities. This includes waste generated by contractor personnel while working at NUWC, Division Keyport. All hazardous waste generated by this contract shall be turned over to the activity for disposal prior to the end of the work shift.
3.7 ON-SITE PERSONNEL TRAINING - Within ten (10) working days after satisfactory completion of acceptance testing of the system, the services of a qualified representative(s) shall be provided for specialized training to familiarize receiving activity personnel with the equipment and to help ensure reliable performance and maximum service life, during normal usage.
3.7.1 Training services shall be rendered at NUWC, Division Keyport. Training shall be scheduled and tailored by mutual agreement between the Contractor and the Receiving Activity Point-of-Contact.
3.7.2 Training sessions shall be provided separately for each group of Government personnel. The contractor shall provide all training manuals and guides. The entire Contractor cost of providing the training (including travel, per diem, materials, etc.) shall be covered by this contract. The training shall apply to personnel as follows:
3.7.3 Operator Personnel – Training shall be provided to personnel for a period of one (1) 8-hour day minimum.
This training shall include preparation of equipment for operation and the actual, safe operation of the equipment.
3.7.4 Maintenance Personnel - Mechanical training shall be provided for personnel at a journeyman mechanic level for a period of one (1) 8-hour day minimum. This training shall include troubleshooting and methods of correction if the equipment malfunctions, with particular emphasis on minimizing equipment down time.
Electrical/Electronics training, with respect to equipment/controls/interface units and related components, shall include troubleshooting and methods of correction should equipment malfunction, with emphasis on minimizing equipment down time.
3.8 TECHNICAL DATA TO BE PROVIDED
3.8.1 Operator / Maintenance / Repair Manuals - The equipment shall be furnished with two (2) copies of the manufacturer’s standard Operation, Maintenance, and Repair Manual(s). The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/controls…