N00253-15-T-0400-0002.pdf
PDF 22 KB Posted
- Attached to
- Metal Finishing Tanks
- Solicitation number
- N00253-15-T-0400
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00253-15-T-0400-04.pdf | ||
| N00253-15-T-0400-0003.pdf | ||
| N00253-15-T-0400-01.pdf | ||
| N00253-15-T-0400.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions received.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00253-15-T-0400
X 9B. DATED (SEE ITEM 11)
23-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jul-2015
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: MEGAN.VOGT@NAVY.MIL
610 DOWELL ST BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00253-15-T-0400
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Question 1: Equipment rigging page 6 of 57 states forklifts are not permitted in facility, on 3.6.4.2 states all material handling equipment necessary to unload and transport equipment (such as forklifts, man-lifts etc.( please clarify equipment acceptable for install)
Answer 1: Forklifts are not allowed in interior of the building (due to weight restrictions), consequently, pallet jackets, rollers, and dollies may be required to move the modular lines to their final position in the facility. However, forklifts may be necessary to offload the equipment from the shipping truck and onto the elevated shipping dock that provides entrance into the facility. All material handling equipment is the responsibility of the vendor.
Question 2: 3.6.1.4.1 / 3.6.2.4.1 – What size is the duct connection on the scrubber?
Answer 2: The Main Duct to the scrubber is 24”, however, the branch line, which this will tie into is 12”.
Question 3: 3.6.1.6.2 / 3.6.2.6.1 – What connection size is the air agitation blower, is the piping steel or PVC?
Answer 3: It is a Low Pressure air line (“Shop Air”), 1-1/2” diameter, steel.
Question 4: 3.6.1.11.1 – What is the chiller size ( tons / flow ), what is the connection sizes of the inlet and outlet of the chiller?
Answer 4: The Chiller is an Accuchiller by Thermal Care, Niles, IL, Model No. NQA20. The connection pipe for the chiller is 2”.
Question 5: 3.6.1.11.1 – What is the rectifier size ( amps / volts )?
Answer 5: The rectifier is by 3G Tech, Van Nuys, CA, Model No. A3SC50050AFVC. Output: 50 V, 500 A.
Question 6: 3.6.5.2 – What is the water connection size? What is the compressed air connection size?
Answer 6: Water inlet is 1” diameter; Wastewater outlet is 2” diameter. The compressed air line is 1-1/2” diameter
Question 7: 6.3.2 – How soon do we need to submit for extended working hours; Monday – Sunday 10 hours per day?
Answer 7: Weekend work hours cannot be supported; However, 10-hour days Monday through Friday (excepting Federal Holidays) are acceptable.
N00253-15-T-0400
Question 8: 3.6.3 / 4.2.2 / 4.2.2.1 requires testing and run off at contractors facility, with the government providing the air agitation, scrubber, rectifier, and chiller. The only testing that we would be able to perform would be a hydro static water test on all of the tanks. Correct?
Answer 8: Yes, that is correct, the only testing that needs to be done at the Contractor facility prior to delivery is a hydrostatic test of tanks and lines (as appropriate). The contractor is responsible for conducting final system acceptance testing after delivery and connection to the utilities (air agitation, scrubber, rectifier, and chiller).
(End of Summary of Changes)