The document is a Statement of Work (SOW) for barge services to refuel the USS PAUL HAMILTON (DDG 60) in San Diego, CA from 10-12 April 2025. The SOW requires contractors to provide tugs and a barge to transport and deliver 300,000 gallons of F-76 fuel, with specific logistics including towing the barge to Point Loma Fuel Farm for loading on 10 April, then to BAE Shipyard's Pier 3 for two days of refueling. The ship can accept 150,000 gallons of fuel per day, with refueling to commence at 0800 each day.
The contract is a 100% Small Business Set-Aside under NAICS code 483211, with a solicitation number N00244-25-Q-0123 issued by the Department of the Navy Naval Supply Systems Command. The procurement will be a Firm Fixed Price (FFP) order, with delivery FOB Destination and inspection performed by the government at the destination. Contractors must provide a barge with three 2.5m or 3.3m diameter fenders and an 8", 6" or 4" hose flange with approximately 200-250 feet of hose. The technical point of contact is CWO3 Stephen Tackett.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Combined Synopsis-Solicitation N00244-25-Q-0123.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
BARGE SERVICES for REFUELING of USS PAUL HAMILTON (DDG 60)
Pt. Loma – San Diego, CA
I. Brief Job Description:
GENERAL: This Statement of Work (SOW) covers the requirement associated with tug and barge services for USS PAUL HAMILTON (DDG 60) refueling on 10 April 2025 to 12 April
2025. Refueling of the barge is requested to take place on 10 April 2025, to prevent any delay in services for the actual refueling, which is scheduled for 11 April 2025 and 12 April 2025.
Requesting for barge to have three 2.5m or 3.3m diameter fenders, as well as an 8", 6" or 4” hose flange with approximately 200 to 250' of hose.
Targeted Schedule:
10 April 2025
Tugs are required to tow barge (barge and tugs are to be provided by contractors) to the Fuel
Farm at Point Loma, to be loaded with 300,000 gallons of F-76.
11 April to 12 April 2025
Tugs are required to tow barge to BAE shipyard, Pier 3 to commence refueling. Request is to commence refueling at 0800 each day. The ship can take only 150,000 gallons per day.
II. Period of Performance: 10 April 2025 to 12 April 2025.
III. Location:
Pier 3 South
BAE Shipyard, 2205 Belt St, San Diego, CA 92113
IV. Customer Responsibilities:
A. Notify Environmental, Security, and Dock Master.
B. Coordinate refueling with the Point Loma Fuel Farm, BAE Shipyard, as well as Engineering, and Operations Department.
V. Technical POC:
NAME: CWO3 Stephen Tackett (MPA)