PWS_PMCM__Lemoore_OPS_and_Mobile_Food_Truck_190731.pdf

PDF 554 KB Posted

Attached to
PREVENTIVE/CORRECTIVE MAINTENANCE OF GALLEY EQUIPMENT IN NAS LEMOORE CALIFORNIA
Solicitation number
N0024420Q0003
Issued by

View the file

Other files

File Type Posted
N00244/N0024420Q0003Pricing_Summary_Example.xlsx XLSX spreadsheet
Combined_Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

PREVENTIVE/CORRECTIVE MAINTENANCE OF GALLEY EQUIPMENT

COMMNANDER NAVY REGION SOUTHWEST (CNRSW)

NAVAL AIR STATION LEMOORE

1. GENERAL: This is a non-personal services contract to provide Preventive Maintenance (PM) and Corrective

Maintenance (CM) to Government Owned Galley and Mobile Food Truck Equipment located at Naval Air Station

(NAS) Lemoore OPS galley. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the

Contractor who, in turn is responsible to the Government.

1.1 Description of Services: The Contractor shall provide qualified personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary to perform Preventive Maintenance (PM) and

Corrective Maintenance (CM) to Government Owned Galley Equipment and Mobile Food Truck Equipment as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2 Background: Galley equipment located in NAS Lemoore OPS Galley and Mobile Food Truck require preventive maintenance to keep them in good working order for military personnel use. The equipment also requires corrective maintenance when unscheduled repair is needed due to breakage or malfunction as they occur, or as detected (to occur) during PM performance. CNRSW does not have organic capability to provide services, and therefore, contractual support is necessary.

1.3 Objectives: The general objective of the contract is to maintain galley and mobile food truck equipment within manufacturer and Government specifications by having a scheduled preventive maintenance (PM), and the performance of corrective maintenance (CM). PM schedule shall also be used in identifying potential problems and rendering CM before the equipment becomes inoperable. CM will also be used for inoperable equipment deemed not beyond economical repair (BER) by the Contracting Officer Representative (COR).

1.4 Scope: The Contractor shall provide PM and CM to Government Owned Galley and Mobile Food Truck

Equipment located at Naval Air Station Lemoore as listed in Attachments 1 through 3 to ensure equipment are in good working order when needed.

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years.

BEGIN DATE END DATE

BASIC YEAR 15 NOV 2019 14 NOV 2020

OPTION YEAR 1 15 NOV 2020 14 NOV 2021

OPTION YEAR 2 15 NOV 2021 14 NOV 2022

OPTION YEAR 3 15 NOV 2022 14 NOV 2023

OPTION YEAR 4 15 NOV 2023 14 NOV 2024

1.6.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.

1.6.2 Quality Assurance: The government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on ensuring that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: No Preventive Maintenance (PM) will be scheduled or performed by Contractor during following Holidays:

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

1.6.4 Hours of Operation: The Contractor may schedule PM/CM services between the hours of 7 am through 4 pm

PST Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at Naval Air Station

Lemoore OPS Galley and Mobile Food Truck.

1.6.6 Type of Contract: The government will award a combination of a Firm Fixed Price (FFP) and Time &

Materials (T&M) contract for PM and CM services respectively.

1.6.7 Security Requirements: UNCLASSIFIED

1.6.7.1 Base Access: The Contractor shall maintain proper security protocol in accordance with all base regulations.

Security approval for all Contractor personnel will be obtained through base security office. Identifications furnished for approved employees shall be returned to the COR by the Contractor immediately when such employees are no longer employed under this contract. The Contractor is responsible for ensuring that all Contractor personnel obtain the proper identification for base access through the Defense Biometric Identification System (DBIDS) credentialing process. The government will not provide escorts to Contractor personnel for base access.

1.6.8 Special Qualifications: The Contractor is responsible for ensuring all employees possess and maintain current

California Refrigeration License, Rational Training Certificate (Combination Ovens) and Kitchen Equipment

Maintenance and Repair Certification during the execution of this contract.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal

Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other

Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the government views the

Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: ensure that the Contractor performs the technical requirements of the contract;

perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. An appointment letter issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.6.11 Alternate Contracting Officer Representative (ACOR) Alternate Contracting Officer Representative (ACOR) may be identified and appointed to perform duties in the absence of the COR. ACOR will perform the same functions as the COR and will be designated in writing by the Contracting Officer.

1.6.12 Technical Assistant (TA). Technical Assistants (TA) are assigned on-site to provide technical assistance and support to the COR in the administration of the contract. TA may assist the COR in executing assigned inspection and monitoring duties. However, TAs may not provide any technical direction or clarification directly to the

Contractor. TA is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract.

1.6.13 Point of Contact:

NAS Lemoore OPS Galley

860 Franklin Boulevard

Lemoore, CA 93246

POC: SH2 Daviyon Whisonant

Email: daviyon.whisonant@navy.mil

Telephone: 559-99894817

1.6.14 Key Personnel: None

1.6.14 Other Direct Costs. This category includes travel cost as result of providing CM services from Contractor facility to Government facility and back.

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. BER EQUIPMENT. Beyond-economic-repair-equipment - inoperable equipment for which repair cost is estimated to exceed acquisition cost by 25% or more.

2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. CORRECTIVE MAINTENANCE (CM). Unscheduled repair required to restore equipment to operational condition within manufacturer predetermined tolerances and limitations. CM evolves from equipment failure or indications of equipment degradation. CM includes, but not limited to adjustment, alignment, and/or replacement of malfunctioning part or component.

2.1.6. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the

Performance Work Statement.

2.1.7. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

mailto:daviyon.whisonant@navy.mil

2.1.8. EMERGENCY SITUATION. Equipment malfunction that may cause complete shutdown of galley operation.

2.1.9. MAINTENANCE. Set of actions taken to ensure that equipment perform their intended function when required.

2.1.10 PERIODICITY. Frequency of performance of Manufacturer prescribed maintenance service for the specific equipment; expressed in Monthly (M), Quarterly (Q), Annually (A), and Every Other Month (EOM).

2.1.11. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.12. PREVENTIVE MAINTENANCE (PM). Scheduled maintenance performed on equipment to keep it in good working condition and operating within manufacturer predetermined tolerances and limitations. PM may include inspection, cleaning, lubricating, calibrating, adjusting or replacing “Bench Stock” – i.e. nuts, bolts, screws, electrical fittings, refrigerant gases, solder and/or flux, oil grease, cleaning supplies.

2.1.13. QUALITY ASSURANCE. The government procedures to verify that services being performed by the

Contractor are performed according to acceptable standards.

2.1.14. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.15. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.16. SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the Subcontractor.

2.1.17. WORK DAY. Monday through Friday except Holidays;

2.1.18. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative

BER Beyond Economical Repair

CM Corrective Maintenance

COR Contracting Officer Representative

DFARS Defense Federal Acquisition Regulation Supplement

DOD Department of Defense

FAR Federal Acquisition Regulation

KO Contracting Officer

NLT No-Later -Than

ODC Other Direct Costs

PM Preventive Maintenance

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Plan

TA Technical Assistant

TE Technical Exhibit

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: NONE

3.2 Facilities: PM and CM services shall be performed at Government facilities where equipment are located.

3.3 Utilities: The Government will provide basic utilities to include electrical power and water for tools needed for contract performance. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish PM or CM maintenance.

3.4 Equipment: NONE

3.5 Materials: NONE

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Materials. The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.

4.3 The Contractor is required to notify PCO when 75% of the ceiling contract cost is reached during the contract period of performance.

5. SPECIFIC TASKS:

5.1 Contractor Contract Acceptance.

5.1.1 Initial Inspection of Equipment. The Contractor shall perform the initial inspection of all equipment at each galley location listed in Attachments 1 through 3 within 30 days after contract award date. The inspection result shall be submitted to the COR in the form of Equipment Status Report – Initial described as follows:

5.1.1.1 Equipment Status Report. The Contractor shall provide results of the equipment evaluation/analysis in the form of a report to the Contracting Officer’s Representative (COR) within 5 days after the initial inspection period.

The report shall identify the equipment by location (galley), serial, and model number, operable or not operable, required parts and labor, if necessary, to restore equipment to working condition as specified in the manufacturer’s manual.

5.1.1.2 Government Action. The COR will provide a written response within 15 days from receipt of the report. The

Government reserves the right to determine if replacement or recommended repairs will be accomplished.

Equipment determined to be beyond economical repair (BER) will be deleted from Attachments 1 through 3 and shall not be included in the PM schedule. Government reserves the right to replace the equipment (with similar function/capacity equipment) removed from list as result of contract acceptance inspection result during the life of the contract at no additional cost. Repair of equipment determined eligible for repair shall be accomplished in accordance with the requirements set forth in the manufacturer manual.

5.1.1.3 PM Schedule. The Contractor shall submit to the COR a written PM schedule for all the equipment listed in

Attachments 1 through 3 within thirty (30) days after contract award. The schedule shall address following:

equipment location, description, manufacturer, model name/#, quantity, periodicity, and PM schedule date.

5.1.1.4 Addition and deletion of equipment during POP. There will be no change in the Firm Fixed Price portion of the contract during POP for as long as the change is within plus or minus five percent (i.e. ± 5%) of the total number of pieces of equipment in specific galley recorded at the time of contract award. Government replacement of equipment will be performed one for one of similar form, fit, and function – e.g. remove one oven, add one oven of similar size and capacity with the one removed. Additional equipment may be added to increase productivity as long as the addition is within five percent of the total number of galley equipment.

5.2 Basic Services. The Contractor shall provide fully qualified and accredited technicians to provide PM and CM services as required in this PWS. PM is performed as scheduled, while CM may be performed during PM performance, it may also be performed during separate visit as requested by the COR. PM and CM shall be performed with the main objective of having ALL equipment to be in operational status when needed.

5.2.1 Preventive Maintenance (PM). PM shall be performed as scheduled for each piece of equipment listed in

Attachments 1 through 3 in accordance with prescribed government manuals/instructions/ directives and individual equipment manufacturer manuals to keep them in good working order.

5.2.1.1 PM Frequency. PM Schedule as shown in Table 1 below:

Table 1 - PREVENTIVE MAINTENANCE (PM) SCHEDULE

Equipment Type Periodicity (Frequency)

Convection Oven Monthly, Quarterly

Combi Ovens Monthly, Quarterly

Fryers Monthly, Quarterly

Steam Kettles Monthly, Annually*

Electric Kettles Monthly, Annually

Tilt, Skillets Monthly, Quarterly

Mixer Quarterly

Soup Wells Quarterly

Heat Lamps Quarterly

Dish Machines (Except Leased Machines) Monthly, Quarterly

Cook and Hold (Warming Cabinets) Monthly, Quarterly

Disposal Quarterly

Slicers Quarterly

Griddles Monthly, Quarterly

Range’s Monthly, Quarterly

Grills Monthly, Quarterly

Ice Machines/Ice Dispensers Monthly, Quarterly

Reach in Coolers Every other month

Reach in Freezer Every other month

Milk Coolers Every other month

Cold Rails (Including Salad Bar) Every other month

Notes:

1. Equipment calibration will be performed during the PM schedule.

2. For steam kettles, in addition to the scheduled PM, hydrostatic testing will be performed once a year.

3. Attachments 1 thru 3 show periodicity abbreviations as follows:

M – MONTHLY; EOM – EVERY OTHER MONTH; Q – QUARTERLY; A - ANNUALLY

5.2.1.2 Equipment Operating and Maintenance Parameters. PM shall be conducted to maintain equipment operating in accordance with NAVMED P-5010-1, Tri-Service Food Code and Food Service Management NAVSUP P-486 operating parameters. Strict compliance with these guidelines is mandatory to avoid the transmission of disease producing microorganisms, infectious disease, and growth of harmful bacteria or development of toxins formed by bacteria. As such, the Contractor shall ensure that equipment being serviced during PM are set at Table 2 and 3

(below) temperature operation parameters.

Table 2 – Operating Temperatures of Refrigerated Equipment

Refrigerated Equipments Operating Temperature

Freezers 0° or Below

Dairy Box 32° 34° F

Chilled Bulk Storage Refrigerators 32° 38° F

Thaw Box – Refrigerators 32° 38° F

Reach –in Refrigerators 32° 41° F

Refrigerated Display Cabinets 32° 41° F

Milk Dispensers 32° 41° F

Table 3 – Dishwashing Equipment

Equipment Nomenclature Wash Rinse Final Rinse

Dish Washing Machine 150° - 160° 160° - 180° 180° - 194°

Pots and Pans Washing Machine 150° - 160° N/A 180 – 194°

5.2.2 Corrective Maintenance (CM). CM is repair service required to restore equipment to its good working condition and operating within Government and Manufacturer predetermined tolerances and limitations. The

Government predetermined equipment tolerances and limitations supersede the Manufacturer. Services shall be completed within three (3) working days, unless, as determined by COR, is not feasible due to event or situation beyond the control of the Contractor. In such a case, Contractor shall provide a reasonable target date of completion for COR approval. If in the COR opinion that provided target date will create emergency situation (see definition), and the Contractor refused to change proposed target date to an earlier date COR deemed necessary to prevent emergency situation, the Government reserves the right to enter into a contract with another Contractor to complete the CM. CM performance shall be performed on equipment when triggered by one of the following:

5.2.2.1 Routine COR request. Contractor shall provide a written cost estimate for all repairs within 2 business days from the date request is submitted by COR. The cost estimate shall include equipment description, number of hours required to effect the repair and the associated labor cost, replacement parts name and cost, and the grand total cost of the CM. CM shall be performed no more than three (3) working days from date cost estimate is approved by the

COR. All cost estimates for CM or repairs must be approved by the COR. Communication will be by Email for routine requests.

5.2.2.2 CM requirement identified during PM. When CM requirement is identified on an equipment undergoing PM service, CM shall be performed by the Contractor to the equipment as long as: (a) it can be performed during normal working hours (see section 1.6.4), and (b) can be accomplished without deviating from the original scheduled equipment PM (i.e. all equipment originally scheduled are serviced). When CM cannot be completed during the PM day for whatever reason, additional time for a separate visit maybe communicated to the COR for approval.

Otherwise, the CM may be continued during the next scheduled PM day (where the equipment is located). COR approval is not required when required CM is discovered during performance of scheduled PM and ONLY when there is no associated additional cost to the Government. All other CM requiring parts and/or labor cost must be approved by the COR.

5.2.2.3 Emergency COR request. Under emergency situation, CM shall be performed within one (1) working day

(24 hours) from date request is communicated by the COR and received by the Contractor. Cost estimate as described in 5.2.2.1 above may be performed via phone conversation between COR and Contractor, but confirmed and approved via Email before CM performance.

5.2.2.4 The Contractor shall provide a CM report of performed CM services to the COR within 2 business days following CM of inoperable or malfunctioning equipment. A CM equipment log will be utilized and maintained by the Contractor to record all services rendered.

5.2.3 Parts. The Contractor shall acquire brand new OEM only parts needed to complete performance of CM using the most economic means to ensure equipment is repaired with minimal downtime. Re-conditioned or re-furbished components or parts may be used if can be shown that use of such component or part is customary commercial practice - subject to COR approval. Fair and reasonable pricing shall be demonstrated to the COR by showing that price is within plus or minus 5% of Commercial item pricing. Proof of Commercial item pricing can be from:

Internet sources to include manufacturer, distributor and other reseller website, or any other sources where price is shown to Government buyers and/or the general public; manufacturer pricing schedule. All procurement of replacement parts must be approved by the COR.

5.2.4 Reports and Deliverables. The Contractor shall provide written documentation of any performed PM and CM service in a written report to the COR within 2 business days following performance. A repair equipment log will be utilized and maintained by the Contractor to indicate all services rendered. See Technical Exhibit 2.

6. APPLICABLE PUBLICATIONS. Government will have available at each galley the Original Equipment

Manufacturer (OEM) Manuals, NAVMED P-5010-1 Tri-Service Food Code, and NAVSUP P-486, Food Service

Management.

6.1. The Contractor must abide by, but not limited to: NAVSUP P-486, Food Service Management; and NAVMED

P-5010-1. (The NAVMED instruction may be found on website http://navalmedicine.med.navy.mil.) Specific instructions as follows:

6.1.2 DISHWASHING AND POTS AND PANS MACHINES: Must operate IAW NAVMED P-5010-1, Tri-

Service Food Code.

6.1.3 MANUAL DISHWASHING: (Backup equipment) IAW NAVMED P-5010-1.

6.1.4 REFRIGERATED STORAGE EQUIPMENT, REFRIGERATED DISPLAY CABINETS, AND MILK

DISPENSERS: Maintain temperatures IAW NAVMED P-5010-1.

6.1.5 BULK AND ICE DISPENSING MACHINES: Monthly cleaning at a minimum shall be accomplished IAW

NAVMED P-5010-1.

Attachment/Technical Exhibit List:

7.1. Technical Exhibit 1 – Performance Requirements Summary

7.2. Technical Exhibit 2 – Deliverables Schedule

7.3. Attachment 1 List of Equipment for Lemoore OPS Galley and Mobile Food Truck.

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective PWS Performance Threshold Method of Surveillance

1. Equipment status 5.2 95% Operational Monthly Inspection by TA or COR

2. Preventive Maintenance 5.2.1 PM performance on 100% of the equipment*

Monthly inspection by TA or COR

3. Corrective Maintenance 5.2.2 95% of equipment is repaired within 3 working days **

100% Inspection by the

TA or COR when completed

4. Response Time for Emergency COR request (i.e After Normal Working Hours and Weekends)

5.2.2.2 95% Within 24 Hours of the

Notification by TA or COR

100% inspection by TA of

COR

100% Inspection by COR

*Situations that are beyond the control of the Contractor that prevent PM performance to an equipment will not count against the 100% requirement (e.g. un-scheduled base closure, acts of nature, etc.).

**Delay caused by parts availability will not count against the Contractor provided the situation is communicated to the COR the day of the knowledge of the situation, and the COR is also provided the target of CM completion.

TECHNICAL EXHIBIT 2

Schedule of Deliverables

Deliverable Frequency # of Copies Medium Format Submit To

Quality Control Plan

(QCP)

PWS 1.6.1

Submit with proposal package on or before

Solicitation

Close date

1 Original

MS Word or MS Excel

Spreadsheet

KO

Equipment Status

Report –

PWS 5.1.1.1

NLT 35 Days

After Contract award

1 Original and 1

Copy

COR with copy to

PM Schedule-

PWS 5.1.1.3

30 Days After

Contract

Award

1 Original and 1

Copy

COR with copy to

CM Cost Estimate

PWS 5.2.2.1/5.2.2.2

Within 2 business days upon receipt of routine CM request from

1 Original Email COR

CM Cost Estimate

PWS 5.2.2.3

Within 24 hours upon receipt of emergency CM request from

1 Original Email COR

CM Report/Log

PWS 5.2.2.4

2 Working Days

After CM performance

1 Original MS Word or MS Excel

TECHNICAL EXHIBIT 3

Equipment List

NAS Lemoore OP'S GALLEY

Description Make Model # Serial # Extra Info

Convection Oven Imperial ICVE2 11218106 Kitchen (top)

Convection Oven Imperial ICVE2 11218106 Kitchen (bottom)

Convection Oven Imperial ICVE2 11218206 Kitchen (top)

Convection Oven Imperial ICVE2 11218206 Kitchen (bottom)

Convection Oven Imperial ICVE2 11217906 Galley (top)

Convection Oven Imperial ICVE2 11217906 Galley (Bottom)

Smart oven Rational SCC WE 62G G62SH16052519794 Kitchen (top right)

Smart oven Rational SCC WE 62G G62SH16062521333

Kitchen (bottom right)

Smart oven Rational SCC WE 62G G62SH16052519797 Kitchen (top left)

Smart oven Rational SCC WE 62G G62SH16052519795 Kitchen (bottom left)

Steam Kettle Vulcan VGLT 40

AP-1050136-2DD-

1159 Right side

Steam Kettle Vulcan VGLT 40 463010484 Middle

Steam Kettle Vulcan VGLT 40 463010486 Left side

Steam Kettle Vulcan VGLT 40 463010485 Next to ovens

Ice Machine Manitowoc S570 990921463 Left side

Ice Machine Manitowoc S570 31020720 Right side

Grill Vulcan HEG 72D CF-100609F06

Grill Lang 172T GT1720816A0013

Grill

Columbia

Imperial CFETG-72-E 4567812

Pot Washer Hobart UW50 85-1066393

Garbage Disposer In-Sink-Erator SS750-13 12059102671 Pot Wash Room

Refrigerator Traulsen G20010 T42811G10 2 door

Refrigerator Traulsen G20010 S-T34103C10 2 door

Refrigerator Traulsen 3R S-15258101 3 door

Mixer Hobart L800 M-31-1249-474

Mixer Vollarth MIX1020 S-G52-00334747

Steam Table RANDELL RAN HTD-4S S-W28888111

Steam Table RANDELL RAN HTD-4S S-W288881-1-3

Steam Table RANDELL RAN HTD-4S S-W288881-1-4

Steam Table Duke E6CBPG-M 5111179

Microwave Amana RCS10DSE 1405611336

Dishwasher Ecolab ES-6600 07F222877

Salad Bar East Volrath 36436 B311-00511240-002

Salad Bar West Volrath 36436 B311-005112400-001

Cold Plate East Volrath 36426 B313-00509474-002 Middle/ east

Cold Plate West Volrath 36426 B313-00509474-001 Middle/ west

Cold Plate East Volrath 36426 G214-00877195-001

Cold plate West Volrath 36426 G214-00877195-002

Soup Steam Table Piper products 11-D-T-RU-120 30772 East side

Soup Steam Table Piper products 11-D-T-RU-120 30773 West side

Walking reefer Trenton TPLP106MAS1BR6E 149236922 Food truck

Walking freezer Trenton TPLP105MAS1BR6E 139430555 Food truck

Walking reefer Russell AA2670B-AE E15G00725784004001 Bread and Dairy

Walking reefer Trenton TPLP209MAS1BR6E 149236342 FFV

Walking freezer Russell AE16-46B-DE E15G00725784002001

Ozonated water generator MVP group WMS BTE100067

NAS Lemoore OP'S FOOD TRUCK

Description Make Model # Serial #

Freezer True T19FHC 9332812

Deep fryer Dean SR14ZGP 18020MA0872

Flame boiler Globe N/A N/A

Griddle Accu-steam PGF1Z01B3650 19202

Steam table Eagle group SHT3120 1802100133

Combi-oven Unox XAVC0511GPR 4006922

Reach-in True TUC27LPHC 9330400

Reach-in True T19FHC 9293293

Reach-in Central TSS03608 9353752

Coffee maker Bunn AXIOM AXAP030866

File details come from the government source that posted it.