This is a Quality Assurance Surveillance Plan (QASP) for a Microchip Indefinite Delivery Indefinite Quantity (IDIQ) contract. The QASP establishes an effective and systematic method for Government surveillance at both the base contract and delivery order levels to ensure quality deliverables are provided in a timely manner.
The plan identifies three critical performance processes: timeliness, quality, and accuracy of deliverables. Performance standards are measured across four key elements: Schedule (assessed against original due dates), Deliverables (inspected for content, quality, timeliness, and accuracy against contract/delivery order specifications and any required Quality Control Plan), Past Performance (evaluated per FAR 42.15 regarding delivery conformance, schedule adherence, and customer satisfaction commitment), and Invoicing (reviewed monthly for timeliness and accuracy). Surveillance methods include 100% inspection of required deliverables, invoice review, periodic inspections, and feedback from Government personnel. The Contractor Quality Control Plan requires quarterly inspections with 100% compliance acceptable quality level. Contract deliverables require 100% inspection with an acceptable quality level of greater than 95% submitted timely without rework. Overall contract performance is assessed annually by the Contracting Officer's Representative (COR) with all elements requiring Satisfactory or higher rating. Monthly invoicing must achieve 100% accuracy.
The QASP includes incentives and disincentives: unsatisfactory performance may result in contract/delivery order termination and loss of future Government contracts. For non-conforming items, the Government may issue a Contract Discrepancy Report (CDR) requiring written contractor response within five days identifying corrective measures. The contractor is incentivized to meet quality standards as the Government may require replacement or correction of deficient deliverables at no additional cost to the Government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance at the base contract and delivery order level. The QASP will be used primarily as a tool to ensure that quality deliverables are being provided in a timely manner.
1. Critical performance processes and requirements. Critical to the success of the
Microchip IDIQ is timeliness, quality, and accuracy of the deliverables required upon each delivery order.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates established for the contract or delivery order(s).
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/delivery order(s) and the Quality
Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract delivery requirements, the contractor’s adherence to contract schedules including the administrative aspects, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods - The primary methods of surveillance used to monitor performance of this contract will be the following: a) 100% inspection of required deliverables; b) review of invoices; c) periodic inspections to ensure the contractor is performing in an acceptable manner; and d) through feedback from the Government personnel being supported.
4. Performance Measurement: Performance will be measured in accordance with the following table:
Performance
Element
Performance
Requirement
Surveillance
Method
Frequency
Acceptable
Quality Level
Contractor
Quality Control
Plan
QC activities, inspections, and corrective actions completed as required by the plan.
Inspection by the COR
Quarterly for overall QC activities;
As Required for corrective actions.
100%
Compliance with the contractor plan.
(If required by the contract)
Contract Contract Inspection by 100% >95% of
Deliverables deliverables the COR inspection of deliverables furnished as all contract submitted prescribed in the deliverables. timely and SOW, without attachments, rework CDRLs, Task required.
Orders, etc., as applicable.
Overall Overall contract Assessment by Annual All
Contract performance of the COR performance
Performance sufficient quality elements to earn a rated Satisfactory (or Satisfactory higher) rating in (or higher) the COR’s annual report on
Contractor
Performance
Invoicing Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice
Monthly 100% accuracy
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR makes an annual report on Contractor Performance (CPARS or other annual report).
The contractor’s failure to achieve satisfactory performance under the contract/delivery order, reflected in the COR’s annual report, may result in termination of the contract/delivery order and may also result in the loss of future Government contracts/delivery orders. The contractor’s failure to achieve satisfactory performance under the contract/delivery order may result in the non-execution of available delivery orders.
For each item that does not meet acceptable levels, the Government may issue a Contract
Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of contract deliverables, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct deliverables that fail to meet contract requirements.