Solicitation Amendment - N0018926RW0040001.pdf

PDF 2 MB Posted

Attached to
Expeditionary Warfare Analytical Operational Test and Evaluation Support Services
Solicitation number
N0018926RW004
Issued by

About this file

This is a Solicitation Amendment for a firm-fixed-price, indefinite-delivery, indefinite-quantity (IDIQ) contract for analytical operational test and evaluation (OT&E) support services for the Expeditionary Warfare Division (Code 80) at the Operational Test and Evaluation Force (OPTEVFOR), Naval Supply Systems Command, Norfolk, Virginia. The contract is set aside 100% for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under NAICS code 541330 Exception 2, with a size standard of $47 million. The five-year base ordering period runs from 16 May 2026 through 15 May 2031, with an optional six-month extension through 15 November 2031 available under FAR clause 52.217-8. The solicitation number is N0018926RW0040001, with proposals due no later than 27 March 2026 at 10:00 AM ET. The contract minimum is $2,500.00 per order, with a maximum total contract value of $21,832,237.90.

The Performance Work Statement requires contractors to provide comprehensive technical and analytical support for OT&E activities, including documentation review, operational test design, test execution, data management, test planning, test operations, test analysis and reporting, modeling and simulation support, program management support, and cybersecurity testing. Primary performance location is OPTEVFOR in Norfolk, Virginia (7970 Diven Street, Norfolk, VA 23505-1498), with potential travel requirements throughout CONUS and OCONUS locations. Key personnel qualifications specified include Program Managers with DoD 5000 series knowledge and OPTEVFOR course certifications, Senior and Junior Warfare Systems T&E Specialists with relevant operational and test experience, and subject matter experts in naval special warfare, chemical-biological-radiological defense, explosive ordnance disposal, small craft operations, information systems, and cybersecurity. All personnel must possess U.S. citizenship, hold a minimum SECRET security clearance with potential TOP SECRET/SCI eligibility requirements, and complete required training and certifications. Deliverables include test and evaluation documents, trip reports, monthly status reports, and financial status reports. Evaluation will be conducted in two phases: Phase I evaluates facilities clearance (acceptable/unacceptable), and Phase II evaluates technical approach, past performance, and price using a trade-off source selection process. Proposals must be submitted electronically in two volumes: Volume I (non-price technical proposal with staffing and performance/management approach, limited to 20 pages) and Volume II (price proposal with completed pricing worksheets and solicitation documents).

View the file

Other files

File Type Posted
Copy of 2.02 Pricing Spreadsheet-updated.xlsx XLSX spreadsheet
Draft- DD254_80IDIQ.pdf PDF
Copy of 2.02 Pricing Spreadsheet-updated.xlsx XLSX spreadsheet
Solicitation N0018926RW004 Questions and Answers.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Solicitation/Contract Form Continuation

Expeditionary Division 80 Analytical Operational Test and Evaluation Support Services

N0018926RW0040001

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

QUANTITIES

MINIMUM AND MAXIMUM QUANTITIES (FFP, SINGLE AWARD IDIQ) (SEP 2015)

As referred to in paragraph (b) of the "Indefinite Quantity" clause of this contract, the total contract minimum quantity is a total of $2,500.00 worth of orders at the contract unit price(s). The contract maximum quantity is a total of $___________.

(End of Text)

UNLIQUIDATED OBLIGATIONS

UNLIQUIDATED OBLIGATIONS

The Government intends to unilaterally deobilgate any unliquidated obligations 90 days after each period of performance. Prior to doing so, the Contracting Officer (or Administrative Contracting Officer) will notify the contractor of the intended amount of deobligation and ask the contractor to confirm within one week that all invoices for the completed period of performance have been submitted and processed for payment (with the exception of any invoice for rate adjustment upon receipt of DCAA approved final rates for any cost-type CLINs or SLINs). Upon confirmation that all invoices have been submitted and processed for payment, or upon the contractor's failure to respond to the PCO/ACOs notification of intent to deobligate, the Contracting Officer or Administrative Contracting Officer will unilaterally deobligate the potential ULOs by reducing the funded amount to an amount equal to the contractors invoiced/paid amount for that contract period of performance.

Note: Reduction of cost-reimbursement CLINs or SLINs in accordance with the above DOES NOT change either party's obligations under a Final Invoice submitted upon DCMA establishing final rates for each CLIN and or SLIN.

(End of Text)

Allowed Per Order Minimum: 1.00 Dollars, U.S.

Maximum: 21,832,237.90 Dollars, U.S.

Government Minimum/Maximum to Order Minimum: 2,500.00 Dollars, U.S.

Maximum: 21,832,237.90 Dollars, U.S.

Item Supplies/Service Quantity Unit Unit Price Amount

0001 80DIV IDIQ

Pricing Arrangement: Firm Fixed Price

1 Unit

0002 80DIV IDIQ

Pricing Arrangement: Firm Fixed Price

1 Unit

Option Line Item

80DIV IDIQ

Pricing Arrangement: Firm Fixed Price

1 Unit

Option Line Item

80DIV IDIQ

Pricing Arrangement: Firm Fixed Price

1 Unit

Continuation of Description PERFORMANCE WORK STATEMENTAnalytical Operational Test and Evaluation Support Servicesfor Expeditionary Warfare (Code 80)At OPTEVFOR Norfolk VAFINAL1.0 Scope. The Contractor shall provide technical and analytical support to Operational Test and Evaluation Force (OPTEVFOR) in the definition, conduct, and analysis of structured Operational Test and Evaluation (OT&E) of US Navy Undersea Warfare systems.

This support will be required in one or more of the following forms: Documentation Review, Operational Test Design, Test Execution, Data Management, Test Planning Support, Test Operations Support, Test Analysis and Reporting, Modeling and Simulation Support, and Program Management Support. OPTEVFOR is charged with leading the Operational Test community with highly skilled testers and staff that adapt to change, and provide credible, prompt, warfighting-focused test results to Navy, Marine Corps, Coast Guard forces and acquisition leadership.

2.0 Background. There are five warfare divisions at OPTEVFOR that are supported by competency divisions. The warfare divisions include Undersea Warfare (40), Air Warfare (50), Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) (60), Surface Warfare (70), Expeditionary Warfare(80) Division. Each warfare division typically has a Navy Captain as the division Director with a senior civil servant as the Deputy or a senior civil servant as the division Director and a Navy Commander as the Deputy.

The warfare divisions represent the traditional core of the OPTEVFOR organization. This is where the Fleet operators reside. The work there allows OPTEVFOR to bridge the gap from technical to the tactical, successfully. The warfare divisions are staffed by uniformed military personnel and Navy government civilians, augmented by a contractor workforce.

There are four competency divisions: Policy and Operations (01A), Test Design (01B), Test Planning and Analysis (01C), and Cybersecurity Testing (01D). In addition, the Technical Director (00TD) oversees the technical aspects of the Command's mission. Other support divisions include the Staff Commanding Officer and Administration (10), Chief Information Officer (CIO) (20), Contracts (01K), and the Comptroller (30). The members of the competency divisions generally work within the test team to ensure that the Director's policies are adhered to, and that Best Practice Series are applied.

Test Policy, Operations and Training (Code 01A) ensures OPTEVFOR policy conforms to Navy T&E Policy; monitors production of T&E products;

leads continuous process improvement efforts; coordinates external OT&E inquiries (IG and GAO); manages all government T&E training (including budget requests); provides T&E editorial support to the command; and plans, analyzes and evaluates the effectiveness of command processes.

Test Design and M&S (Code 01B) is responsible for the Mission Based Test Design (MBTD) process, M&S technical review, test planning and post-test iterative process analysis support, test design production, Capabilities Based Test and Evaluation coordination, and Targets, Ranges, and Test Resources coordination.

Test Planning and Analysis Division (Code 01C) is responsible for policy, processes and standardization for test planning, test execution, post-test analysis and evaluation (reporting). This includes providing Lead Test Engineer (LTE) support to the OTF Warfare Divisions and Fleet Resources coordination to support execution of OT&E.

Cybersecurity Division (Code O1D) integrates critical cybersecurity testing into the acquisition lifecycle and tests Systems under Test (SUT) per DoDI 5000.02 and DOT&E memo of 01 August 2014. The Under Sea Warfare division will be responsible for executing acquisition test design, planning support to ultimately provide the Cybersecurity OT&E group (O1D) support in cybersecurity execution and reporting. Through a rigorous and iterative test process, Cybersecurity OT&E assists in the development and fielding of more secure and resilient Information Technology (IT) systems supporting the warfighters. Code 01D Cybersecurity OT&E group includes the following support positions: Technical Director, Future Capabilities and Threat Emulation Developer, Cybersecurity Test Engineers, Test Design and Analysis Manager, Training and Lab Manager, Test Team Leads, and Certified Ethical Hackers.

3.0 Expeditionary Warfare Division and Supported Programs. The Expeditionary Warfare Division (Code 80) tests and evaluates all Expeditionary warfare systems, including Chemical, Biological, Radiological, Nuclear, Special Operations, Explosive Ordnance, Dive, Expeditionary Medical, Medical Information Systems, and Counter-Unmanned Air Systems in their operational environments. The division's main effort is to assist, through early involvement, in the acquisition process, conduct tests, and provide timely and accurate evaluations to characterize system performance and resulting capability. Below is a list of current USW test and evaluation programs that require OT&E support; however, additional programs may be assigned to OPTEVFOR for contractor support under this contract. Current Expeditionary Test and Evaluation programs include, but are not limited to (bold are programs are led by OPTEVFOR):

Service Equipment Decontamination System (SEDS) Shipboard Isolation/Quarantine System (SIS) Next Generation Diagnostic System (NGDS) Proximate Chemical Agent Detector (PCAD) Uniform Integrated Protection Ensemble Family of Systems (UIPE FoS) Hood Mask Interface (HMI) CBRN Support to Command and Control (CSC2) Automated Decontamination System (ADS) Mass Personnel Contamination Mitigation System (MPCMS) Joint Biological Tactical Detection System (JBTDS) Radiological Detection System (RDS) Aerosol Vapor Chemical Agent Detector (AVCAD) Compact Vapor Chemical Agent Detector (CVCAD) Chemical Biological Defense Program (CBDP) Joint General-Purpose Decontaminant - Harden Material (JGPD-HME) Tactical Contamination Mitigation System (TCMS) Joint Operational Medicine Information System (JOMIS) overTactical Disablement System (TacDS) Shallow Water Combat Submersible (SWCS) Mk 11 Seal Delivery Vehicle 40 Foot Patrol Boat (40 PB) Counter Unmanned Aerial System (C-UAS) Decision Support System (DSS) Inc 2 Mk 18 Mod 2 Unmanned Underwater Vehicle Multi-Mission Underwater Breathing Apparatus (MMUBA) Tug - and Salvage (T-ATS) Non-Lethal Weapons (NLW) Amphibious Surf Capable Vehicle (ASCV)

Joint Mission Planning System - Expeditionary (JMPS-E) Combatant Craft Medium (CCM) Advanced Explosive Ordnance Disposal Robotic System (AEODRS)

4.0 Performance Period and Location.

4.1 Period of Performance. See schedule.

4.2 Place of Performance. Unless required to support mission accomplishment, work shall primarily be performed at the customer's site. If the number of personnel exceeds onsite capabilities, unclassified work will be expected to be performed at a contractor facility offsite. The government will not determine a situation where the contractor may utilize "Telework" as this is a professional services contract, so any work performed by the contractor away from the customer location will be upon the contractor to ensure all requirements are being met within the respective task orders issued under this contract. The customer location is:

Operational Test and Evaluation Force 7970 Diven Street Norfolk, VA 23505-1498 While onsite at OPTEVFOR, the contractor shall comply with OPNAVINST 5239 (series), with specific regard to non-government hardware and software. Normal workdays at OPTEVFOR are Monday through Friday and normal working hours are from 0730 through 1600 ET. The manned quarter deck watch will unlock the front and back doors to CA-10 at 0500 (M-F) and lock the front and back doors to CA-10 at 1830 (M-F). Any contractor who desires to remain past 1830 in CA-10 to perform services under their support contract MUST notify the quarterdeck CDO/watch stander NLT 1700 on the day they will be working past 1830. Once the contractor has secured all work and access in their respective workspace, they will notify the CDO/watch stander that they are securing for the day.

4.3 Travel. Travel can be expected to occur CONUS and OCONUS and will be required throughout the course of this contract. The need for travel associated with this PWS shall be determined in advance by the COR at the Task Order level and authorized by the COR. Travel shall be paid by the Contractor and reimbursed by the Government. Travel costs/expenses will be considered reasonable and allowable only to the extent that they do not exceed on a daily basis, the maximum per diem rates in effect at the time of the travel. Travel expenses include airfare, per diem, rental car, local travel and miscellaneous expenses as authorized by the Joint Travel Regulations (JTR). Costs for transportation may be based upon mileage rates, actual costs incurred or a combination thereof, provided the method used results in a reasonable charge. No mileage costs will be incurred when travel is within a 50-mile radius of the primary work location. The JTR, while not wholly applicable to Contractors, shall provide the basis for the determination as to reasonable and allowable. Maximum use is to be made of the lowest available customary standard coach or equivalent airfare accommodations available during normal business hours. Exceptions to these guidelines shall be approved in advance by the Contracting Officer or Designee. Travel dates and locations are to be confirmed through the TA and approved by the COR in writing via email, prior to commencement of any travel.

4.4 Observed Federal Holidays

Columbus Day Veterans Day Thanksgiving Christmas Day New Year's Day MLK Jr. Day / Inauguration Day Mon Washington's Birthday Mon Spring Holiday (MIL Only) Sun Memorial Day Juneteenth National Independence Day Independence Day Labor Day

4.5 Travel Instructions.

4.5.1 Any travel OCONUS by the Contractor will need to review the Foreign Clearance Guide at http://www.fcg.pentagon.mil/fcg.cfm and select the country of intended travel. During OCONUS travel, the contractor shall operate in accordance with International Traffic in Arms Regulation (ITAR) Part 124, approved by US Department of State, Office of Defense Trade Controls.

Contractor is not authorized to perform any travel that is not in conjunction with this contract. It is the Department of the Navy (DON) policy not to allow a charge of profit or fee on reimbursable items. 4.5.2 The Government will make no reimbursements for a contractor's local travel (defined as less than 50 miles from the place of performance).

4.5.3 In no instance shall the contractor exceed the amount specified in the contract for travel CLIN expenses.

4.5.4 Locations include CONUS, OCONUS and at sea locations and any other location, which may be added on a task order basis based on future test requirements.

4.5.5 For planning purposes, any travel location OCONUS must be considered as a possible travel location unless travel restrictions at time of test do not permit entry. Possible OCONUS locations include, but are not limited to the following: Andros Island, Bahamas, Darwin, Brisbane, Melbourne, Newcastle, Perth, and Sydney, Australia; London, England; Honduras, Singapore; La Spezia, Italy; Guam; Hawaii; Halifax, Nova Scotia; Nanoose, British Colombia; Columbia; Belize; Guatemala; Souda Bay, Crete; Mexico; and any other location, which may be added on a task order basis based on future test requirements.

5.0 Specific Tasking. The contractor shall provide support in evaluating the operational effectiveness and suitability of the system under test that has been assigned to OPTEVFOR for OT&E in accordance with the processes and procedures prescribed in OPTEVFOR M-3980.2 (series), the Operational Test and Evaluation Manual. This manual and other governing OT&E references are listed in paragraph 12 and are available from the OT Resource Library on the OPTEVFOR Sharepoint site: https://flankspeed.sharepoint-mil.us/sites/OPTEVFOR/SitePages/01A-Division-OT-Resources.

aspx.

5.01 All government furnished Non-Secure Internet Protocol Router (NIPR) templates to be used by the contractor shall only be obtained from the authoritative source, the OT Resource Library on the OPTEVFOR Sharepoint site https://flankspeed.sharepoint-mil.us/sites/OPTEVFOR/SitePages /01A-Division-OT-Resources.aspx.

5.02 All government furnished Secure Internet Protocol Router (SIPR) templates to be used by the contractor shall only be obtained from the authoritative source, the OPTEVFOR SIPR Share Drive: Y: / OT&E Production Library.

5.03 The contractor shall sign up for the OPTEVFOR "Alerts for OT Resource Changes" to receive updates (which can be tailored on what you receive) on all instructions, Best Practices, and templates. Instructions to sign up are found on the OPTEVFOR SharePoint page under 01A - Operations, OT Instructions and Guidance:

https://flankspeed.sharepoint-mil.us/sites/OPTEVFOR/SitePages/01A-Division-OT-Resources.aspx

5.1 Overall Task Requirements. For production of all documents covered by this contract and to gain efficiency in contract execution, the contractor shall:

5.1.1 Prepare and route all documents in accordance with the most current OPTEVFOR templates, instructions, handbooks, checklists, policy guidance, and any additional direction provided by the government. Contractor personnel can find the governing references on the OPTEVFOR Internal SharePoint Online (SPO) site. The contractor shall ensure they are referencing the latest version of the applicable template, instruction, handbook, checklist, or policy guidance when preparing assigned documents.

5.1.2 The contractor shall consult with the applicable competency division listed in paragraph 1.2 for each product being prepared.

5.1.3 If a document produced by the contractor is subject to an updated OPTEVFOR template, instruction, policy guidance issuance, or if additional guidance is provided by the government,the contractor shall modify the delivered document in accordance with the updated policy provided by the government. 5.1.4 The contractor shall obtain and maintain an account on the Mission Based Test Design (MBTES) automated information system.

5.1.5 If cleared, the contractor shall obtain and maintain an account on the OPTEVFOR Secure Internet Protocol Routing (SIPR) network

5.1.6 The contractor shall obtain (via CIO Office) and maintain a Flank Speed account.

5.1.7 The contractor shall obtain (via CIO Office) and maintain an account on the OPTEVFOR unclassified network.

5.1.8 The contractor shall make recommendations to the warfare division leadership in accordance with OPTEVFOR policies and their subject matter expertise.

5.1.9 The contractor shall identify and recommend outside organization(s) for participation and inclusion in directed activities.

5.1.10 The contractor shall coordinate, participate and/or lead briefings/meetings in support of document creation and review in accordance with OPTEVFOR policies listed in Section 2, and subsequent paragraphs.

5.1.11 The contractor shall provide a trip report when contract activities occur away from the OPTEVFOR site in Norfolk, VA, with the exception of formal operational testing.

5.1.12 The contractor shall sign up for updates to the OPTEVFOR "Last modified resources" SharePoint page to receive updates on instructions as they are updated.

5.1.13 The contractor shall prepare and manage all Comment Resolution Matrices for the tasks listed in paragraph 2.6.

5.2 Overall Task Guidance. To gain efficiencies and synergy in contract execution, the Government encourages the Contractor to consider:

5.2.1 Flexibility in production. OPTEVFOR produces information which may take many forms. Support teams should be willing to experiment, bring up new ideas or better ways of doing things, but remain willing to execute stated processes.

5.2.2 Present concerns about the validity of the information produced and value to the end customer (Fleet or Program). Remain willing to defend a contrary position until government makes a final decision.

5.2.3 Remain Efficient and Economical in production. Strive to produce information as quickly as possible without sacrificing quality, and with the appropriate level of expertise.

5.2.4 Maintain a broad perspective. Awareness of testing outside of a specific program to recommend testing efficiencies and overall kill chain evaluation opportunities.

5.2.5 Technical competence. Improve T&E community's ability to understand, analyze, communicate, and ultimately visualize T&E issues from a warfighter and technical perspective.

5.3 Mission Based Test Design.

5.3.1 Mission Based Test Design

5.3.1.1 The Contractor shall perform Mission Based Test Design mission analysis in accordance with the Integrated Evaluation Framework (IEF) Checklist, IEF Template, and published OPTEVFOR Best Practices, respectively.

5.3.1.2 The contractor shall analyze source data to perform Mission Based Test Design mission analysis.

5.3.1.3 The contractor shall identify and document the mission areas.

5.3.1.4 The contractor shall identify and document system capabilities.

5.3.1.5 The contractor shall derive and document operator tasks.

5.3.1.6 The contractor shall define and document the operational conditions applicable to the system to be tested.

5.3.1.7 The contractor shall document the mission analysis in the Mission Based Test and Evaluation System (MBTES).

5.3.1.8 The contractor shall document the mission analysis in an IEF document.

5.3.1.9 The contractor shall review the mission analysis during MBTD reviews.

5.3.1.10 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of mission analysis MBTD reviews.

5.3.2 Requirements Analysis.

5.3.2.1 The contractor shall perform Mission Based Test Design requirements analysis in accordance with IEF Checklist, IEF Template, and published OPTEVFOR Best Practices respectively.

5.3.2.2 The contractor shall perform requirements analysis on SUT information as listed in the Capabilities Development Document (CDD), Capabilities Production Document (CPD), Performance Specification (P-Spec) or similar source provided documents.

5.3.2.3 The contractor shall analyze source data to perform MBTD requirements analysis.

5.3.2.4 The contractor shall identify and document measures of system performance, inclusive of critical measures.

5.3.2.5 The contractor shall link measures of system performance to subtasks and document this linkage.

5.3.2.6 The contractor shall identify and document the data required to quantify the measures of system performance.

5.3.2.7 The contractor shall identify and document the data required to quantify the operational conditions applicable to the system to be tested.

5.3.2.8 The contractor shall document requirements analysis in the MBTES.

5.3.2.9 The contractor shall review the requirements analysis during MBTD reviews.

5.3.2.10 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of requirements analysis MBTD reviews.

5.3.3 Test Design.

5.3.3.1 The Contractor shall perform Mission Based Test Design test design in accordance with the IEF Checklist and IEF Template, and published OPTEVFOR Best Practices respectively.

5.3.3.2 The contractor shall analyze source data to perform Mission Based Test Design.

5.3.3.3 The contractor shall identify and document the candidate response variables for statistical test design.

5.3.3.4 The contractor shall identify and document factors/conditions (with corresponding levels) associated with each response variable or critical measure used in test design.

5.3.3.5 The contractor shall participate in and document the statistical test design for candidate response variables and/or critical measures.

5.3.3.6 The contractor shall identify and document the test vignettes.

5.3.3.7 The contractor shall determine and document the appropriate test method.

5.3.3.8 The contractor shall determine and document a test schedule supporting execution of the test design.

5.3.3.9 The contractor shall identify and document the expected use of Modeling and Simulation in the execution of the test design.

5.3.3.10 The contractor shall determine and document the resources required to conduct the test.

5.3.3.11 The contractor shall determine and document the limitations to test based on known availability of resources and assets to conduct the test.

5.3.3.12 The contractor shall develop and document data sheets to support test execution.

5.3.3.13 The contractor shall document the test design in the MBTES.

5.3.3.14 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of test design MBTD reviews.

5.4 Stakeholder Collaboration (Working Integrated Product Teams (WIPTs), outreach, etc.).

5.4.1 The contractor shall make recommendations to the warfare division in accordance with OPTEVFOR processes found in IEF Checklist, IEF Template, and published OPTEVFOR Best Practices respectively.

5.4.2 The contractor shall identify and recommend outside organization(s) for participation and inclusion in Test Design activities.

5.4.3 The contractor shall coordinate briefings/meetings in support of OPTEVFOR Test Design activities in accordance with IEF Checklist and IEF Template and published OPTEVFOR Best Practices.

5.4.4 The contractor shall participate in briefings/meetings in support of OPTEVFOR TEMP Input activities in accordance with IEF Checklist and IEF Template and published OPTEVFOR Best Practices.

5.4.5 The contractor shall lead briefings/meetings in support of OPTEVFOR TEMP Input activities in accordance with IEF Checklist and IEF Template and published OPTEVFOR Best Practices.

5.4.6 The contractor shall provide a trip report (DELIVERABLE A002) when contract activities occur away from the OPTEVFOR site in Norfolk, VA.

5.5 Document and Brief Preparation. The contractor shall prepare and document briefings (DELIVERABLE A001) to include the Integrated Evaluation Framework, Executive In-Process Review and stakeholder collaboration briefings.

5.6 Test and Evaluation Master Plan (TEMP) Input Preparation.

5.6.1 The contractor shall analyze source data to provide input to the TEMP, to include program schedules, the Integrated Evaluation Framework, applicable policy documents and any other program-provided materials.

5.6.2 The contractor shall develop and document input to the TEMP in accordance with the DOT&E TEMP Guidebook.

5.6.3 The contractor shall develop and document comments to the TEMP related to or affecting OT.

5.6.4 The contractor shall provide a trip report (DELIVERABLE A002) when contract activities occur away from the OPTEVFOR site in Norfolk, VA.

5.7 Test Planning.

5.7.1 Plan of Action and Milestones (POA&M).

5.7.1.1 The contractor shall develop and document a POA&M for the Test Planning process in accordance with the Test Planning Checklist.

5.7.1.2 The contractor shall analyze source data to perform Test Planning POA&M development.

5.7.1.3 The contractor shall obtain and maintain access to the program MBTES database to support the test planning process.

5.7.2 Developmental or Integrated Test Planning Products.

5.7.2.1 The contractor shall perform the activities associated with development of Purpose of Test in accordance with Test Planning Checklist.

5.7.2.2 The contractor shall review, comment and consolidate input to Developmental or Integrated Test Plans which will provide data that will contribute to operational COI resolution.

5.7.2.3 The contractor shall review all Verification, Validation and/or Accreditation Plans of test facilities or infrastructure that will provide data that will contribute to operational COI resolution.

5.7.2.4 The contractor shall review all Verification, Validation and/or Accreditation Test Reports of test facilities or infrastructure that will provide data that will contribute to operational COI resolution.

5.7.2.5 The contractor shall review all test operating procedures for test facilities or infrastructure that will provide data that will contribute to operational COI resolution.

5.7.3 Purpose of Test.

5.7.3.1 The contractor shall perform the activities associated with development of Purpose of Test in accordance with the Test Planning Checklist and published OPTEVFOR Best Practices.

5.7.3.2 The contractor shall analyze source data to perform Test Planning Purpose of Test development.

5.7.3.3 The contractor shall identify, recommend, and document date to be qualified for use in OT.

5.7.3.4 The contractor shall document the Test Schedule activities in a Test Plan document in accordance with the Test Planning Checklist, and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.3.5 The contractor shall review the Purpose of Test activities during test plan reviews.

5.7.3.6 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of Purpose of Test reviews.

5.7.3.7 The contractor shall develop and document the Test Schedule, to include test events, for each test phase and period.

5.7.3.8 The contractor shall document the Test Schedule data in the MBTES.

5.7.4 Test Schedule.

5.7.4.1 The contractor shall perform the activities associated with development of the Test Schedule in accordance with the Test Planning Checklist and published OPTEVFOR Best Practices.

5.7.4.2 The contractor shall analyze source data to perform Test Schedule development.

5.7.4.3 The contractor shall identify, recommend, and document data to be qualified for use in OT.

5.7.4.4 The contractor shall develop and document the Test Schedule, to include test events, for each test phase and period.

5.7.4.5 The contractor shall document the Test Schedule data in the MBTES.

5.7.4.6 The contractor shall document the Test Schedule activities in a Test Plan document in accordance with Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.4.7 The contractor shall review the Test Schedule activities during test plan reviews.

5.7.4.8 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of Test Schedule reviews.

5.7.5 Detailed Method of Test.

5.7.5.1 The contractor shall perform the activities associated with development of the Detailed Method of Test in accordance with the Test Planning Checklist and published OPTEVFOR Best Practices.

5.7.5.2 The contractor shall analyze source data to perform Detailed Method of Test development.

5.7.5.3 The contractor shall identify and document the data to be collected on each test event.

5.7.5.4 The contractor shall develop and document the start and stop criteria for each test event.

5.7.5.5 The contractor shall develop and document the GO/NO-GO criteria for each test event.

5.7.5.6 The contractor shall develop and document the Detailed Method of Test for each test event.

5.7.5.7 The contractor shall document the Detailed Method of Test in a Test Plan document in accordance with Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.5.8 The contractor shall review the Detailed Method of Test during test plan reviews.

5.7.5.9 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of Detailed Method of Test reviews.

5.7.6 Data Collection Plan (DCP).

5.7.6.1 The contractor shall perform the activities associated with development of the Data Collection Plan in accordance with the Test Planning Checklist and published OPTEVFOR Best Practices.

5.7.6.2 The contractor shall analyze source data to perform Data Collection Plan development.

5.7.6.3 The contractor shall review, update and document, as required, any changes to data requirements.

5.7.6.4 The contractor shall develop and document the Data Collection Plan.

5.7.6.5 The contractor shall identify test equipment/instrumentation needed for test data collection.

5.7.6.6 The contractor shall identify data repository.

5.7.6.7 The contractor shall create and document data sheets, interview sheets, focus group sheets, and survey sheets in support of the Data Collection Plan.

5.7.6.8 The contractor shall document the Data Collection Plan data in the MBTES.

5.7.6.9 The contractor shall document the Data Collection Plan in a Test Plan document in accordance with Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.6.10 The contractor shall review the Data Collection Plan during test plan reviews.

5.7.6.11 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, and to document the results of Data Collection Plan reviews.

5.7.7 Data Analysis Plan (DAP).

5.7.7.1 The contractor shall perform the activities associated with the development of the Data Analysis Plan in accordance with the Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.7.2 The contractor shall analyze source data to perform Data Analysis Plan development.

5.7.7.3 The contractor will develop and document the COI resolution method.

5.7.7.4 The contractor will develop and document data scoring criteria.

5.7.7.5 The contractor shall identify and document Scoring Board Guidance.

5.7.7.6 The contractor shall provide a data analysis repository with Government concurrence.

5.7.7.7 The contractor shall document the Data Analysis Plan in a Test Plan document in accordance with Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.7.8 The contractor shall review the Data Analysis Plan during test plan reviews.

5.7.7.9 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, and to document the results of Data Analysis Plan reviews.

5.7.8 Stakeholder Collaboration (WIPTs, outreach, etc).

5.7.8.1 The contractor shall make recommendations to the warfare division in accordance with OPTEVFOR processes found in the OT&E Manual, Test Planning Checklist, and test plan templates.

5.7.8.2 The contractor shall identify and recommend outside organization(s) for participation and inclusion in Test Planning activities.

5.7.8.3 The contractor shall coordinate briefings/meetings in support of OPTEVFOR Test Planning activities in accordance with Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.8.4 The contractor shall participate in briefings/meetings in support of OPTEVFOR Test Planning activities in accordance with Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.8.5 The contractor shall lead briefings/meetings in support of OPTEVFOR Test Planning activities in accordance with Test Planning Checklist and the appropriate test plan templates and published OPTEVFOR Best Practices.

5.7.8.6 The contractor shall provide a trip report (DELIVERABLE A002) when contract activities occur away from the OPTEVFOR site in Norfolk, VA.

5.7.9 Document and Brief Preparation. The contractor shall prepare and document briefings (DELIVERABLE A001) to include the Test Plan, Data Collection Plan, Concept of Test, Test Plan Review Board, and stakeholder collaboration briefings.

5.8 Modeling and Simulation (M&S) Support.

5.8.1 M&S Requirements Development.

5.8.1.1 The Contractor shall perform M&S Requirements Development in accordance with OPTEVFORINST 5000.1 (series) and applicable Best Practices.

5.8.1.2 The contractor shall identify and document candidate critical measures/response variables, along with their associated conditions, during the Test Design portion of the MBTD process that will be supplemented by M&S data.

5.8.1.3 The contractor shall develop and document a M&S Requirements Letter in accordance with the M&S Requirements Letter template and applicable Best Practices.

5.8.1.4 The contractor shall review the M&S requirements during MBTD reviews.

5.8.1.5 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of M&S Requirements Development.

5.8.2 Develop Accreditation Plans.

5.8.2.1 The contractor shall develop an M&S Accreditation Plan in accordance with OPTEVFORINST 5000.1 (series), the Accreditation Plan template, and applicable Best Practices.

5.8.2.2 The contractor shall develop and document the accreditation approach method consistent with OPTEVFOR policy.

5.8.2.3 The contractor shall develop and document the Accreditation Plan.

5.8.2.4 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of M&S Accreditation Plan Development.

5.8.3 Review Verification & Validation (V&V) Plans and Reports.

5.8.3.1 The contractor shall review program M&S V&V plans and reports in accordance with OPTEVFORINST 5000.1 (series) and applicable Best

Practice.

5.8.3.2 The contractor shall review and document disagreements or issues with V&V plan methodologies.

5.8.3.3 The contractor shall provide recommendations for alternative V&V methodologies supporting OPTEVFOR Accreditation Requirements.

5.8.3.4 The contractor shall review program M&S V&V reports and document disagreements or issues with methodologies/results based on comparison with live test results.

5.8.3.5 The contractor shall develop and document the OPTEVFOR V&V Report addendum.

5.8.3.6 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of M&S V&V Plans or Reports reviews.

5.8.4 Accreditation Support.

5.8.4.1 The contractor shall perform M&S Accreditation in accordance with OPTEVFORINST 5000.1 (series) and applicable Best Practices series.

5.8.4.2 The contractor shall perform and document, in coordination with OPTEVFOR Test Design analysts, any additional required analysis not provided in the V&V report in support of accreditation.

5.8.4.3 The contractor shall identify, and document conclusions and recommendations based on comparison of live test results with M&S test results.

5.8.4.4 The contractor shall identify and document significant M&S limitations that impact the accreditation recommendation.

5.8.4.5 The contractor shall identify and document where the M&S results support the intended use for OT.

5.8.4.6 The contractor shall develop and document an accreditation recommendation in an Accreditation Letter in accordance with OPTEVFORINST

5000.1 (series), the Accreditation Letter template, and applicable Best Practices.

5.8.4.7 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of M&S Accreditation activities and reviews.

5.8.5 Stakeholder Collaboration.

5.8.5.1 The contractor shall make recommendations to the warfare division in accordance with OPTEVFOR processes found in OPTEVFORINST

5000.1 (series) and applicable Best Practices.

5.8.5.2 The contractor shall identify and recommend outside organization(s) for participation and inclusion in M&S VV&A activities.

5.8.5.3 The contractor shall coordinate briefings/meetings in support of OPTEVFOR M&S VV&A activities in accordance with OPTEVFORINST

5000.1 (series) and applicable Best Practices.

5.8.5.4 The contractor shall participate in briefings/meetings in support of OPTEVFOR M&S VV&A activities in accordance with OPTEVFORINST

5000.1 (series) and applicable Best Practices.

5.8.5.5 The contractor shall lead briefings/meetings in support of OPTEVFOR M&S VV&A activities in accordance with OPTEVFORINST 5000.1 (series) and applicable Best Practices.

5.8.5.6 The contractor shall provide a trip report (DELIVERABLE A002) when contract activities occur away from the OPTEVFOR site in Norfolk, VA.

5.8.6 Document and Brief Preparation. The contractor shall prepare and document briefings (DELIVERABLE A001) to include the M&S Requirements Letter, Accreditation Plan, Verification and Validation Report Addendum, Accreditation Letter, and stakeholder collaboration briefings.

5.9 Test Execution.

5.9.1 Pre-test Coordination.

5.9.1.1 The contractor shall identify, and schedule required test services (ranges, targets, personnel, etc.) for the test phase.

5.9.1.2 The contractor shall develop and submit asset scheduling requests to OPTEVFOR Fleet Services schedulers in accordance with the OT&E Manual.

5.9.1.3 The contractor shall develop and provide the OPTEVFOR pre-test letters for Commanding Officers of test units and Immediate Superior in Command (ISIC) in accordance with the OT&E Manual.

5.9.1.4 The contractor shall develop and provide briefing materials as required to support Operational Test Readiness Reviews (OTRR) in accordance with SECNAVINST 5000.2 (series).

5.9.2 Pre-test Brief.

5.9.2.1 The contractor shall prepare and document the Pre-Test briefing to support stakeholder alignment in execution preparations.

5.9.3 Test Operations.

5.9.3.1 The contractor shall collect and document test data using data cards/sheets, interview sheets, focus group sheets, and survey sheets in accordance with OPTEVFOR procedures and the signed test plan.

5.9.3.2 The contractor shall distribute text execution materials to all test participants.

5.9.3.3 The contractor shall develop and document any test deviations resulting from test variances.

5.9.3.4 The contractor shall develop and document a daily summary of test operations email.

5.9.4 Post-Test Activities.

5.9.4.1 The contractor shall conduct and document post-test event interviews.

5.9.4.2 The contractor shall conduct and document test team debriefs.

5.9.4.3 The contractor shall conduct and document test-site scoring boards.

5.9.4.4 The contractor shall coordinate/operate test equipment/instrumentation with Government concurrence.

5.10 Post-Test Iterative Process (PTIP) and Reporting.

5.10.1 Data Scoring.

5.10.1.1 The contractor shall perform PTIP Data Scoring in accordance with the Test Reporting Handbook, and applicable Best Practices.

5.10.1.2 The contractor shall inventory, compile, and document all collected data, comparing data collected to that required by the Test Plan, specifically the DMOT and DCP.

5.10.1.3 The contractor shall develop and document a test execution summary.

5.10.1.4 The contractor shall review the data during Data Scoring reviews.

5.10.1.5 The contractor shall develop the End of Test message.

5.10.1.6 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of Data Scoring reviews.

5.10.1.7 The contractor shall review all data during the Data Authentication Group.

5.10.2 COI Evaluation.

5.10.2.1 The contractor shall perform PTIP COI Evaluation in accordance with the Test Reporting Handbook and applicable Best Practices series.

5.10.2.2 The contractor shall develop and document risks and/or deficiencies using OPTEVFOR Blue and Gold Sheet templates.

5.10.2.3 The contractor shall develop and document test results in OPTEVFOR test report results paragraph format.

5.10.2.4 The contractor shall document any limitations to test identified during test execution or update any identified in test planning and realized during test execution.

5.10.2.5 The contractor shall develop and document COI evaluation via the COI Evaluation Chart.

5.10.2.6 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of COI Evaluation reviews.

5.10.3 Data Analysis.

5.10.3.1 The contractor shall perform PTIP Data Analysis in accordance with the Test Reporting Handbook and the Best Practice series.

5.10.3.2 The contractor shall conduct and document an analysis of all measures.

5.10.3.3 The contractor shall develop and conduct an RV Analysis Out brief in coordination with Test Design Analyst support.

5.10.3.4 The contractor shall develop a draft Data Analysis Summary (DAS).

5.10.3.5 The contractor shall review the DAS during Analysis Working Groups (AWG).

5.10.3.6 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of Data Analysis reviews.

5.10.4 Deficiency/Risk Documentation.

5.10.4.1 The contractor shall perform PTIP Deficiency/Risk Documentation in accordance with the Test Reporting Handbook and applicable Best Practices.

5.10.4.2 The contractor shall develop, distribute, and collect comments on draft Blue/Gold Sheets.

5.10.4.3 The contractor shall review the Deficiencies/Risks during PTIP reviews.

5.10.4.4 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of Deficiency/Risk reviews.

5.10.5 System Evaluation.

5.10.5.1 The contractor shall perform PTIP System Evaluation in accordance with the Test Reporting Handbook and applicable Best Practices.

5.10.5.2 The contractor shall develop and document evaluation reports to support Command Systems Evaluation Review Board (SERB)/Executive SERB (E-SERB) PTIP reviews.

5.10.5.3 The contractor shall provide Divisional Summary Briefs.

5.10.5.4 The contractor shall provide post-test Fact Sheet draft.

5.10.5.5 The contractor shall provide post-test Fleet Brief draft.

5.10.5.6 The contractor shall provide Lessons Learned.

5.10.5.7 The contractor shall review the system evaluation during PTIP reviews.

5.10.5.8 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of System Evaluation reviews.

5.10.6 Stakeholder Collaboration.

5.10.6.1 The contractor shall make recommendations to the warfare division in accordance with OPTEVFOR processes found in the referenced Best Practices series.

5.10.6.2 The contractor shall identify and recommend outside organization(s) for participation and inclusion in PTIP activities.

5.10.6.3 The contractor shall coordinate briefings/meetings in support of OPTEVFOR PTIP activities in accordance with the Best Practice Series.

5.10.6.4 The contractor shall participate in briefings/meetings in support of OPTEVFOR PTIP activities in accordance with the referenced Best Practice series.

5.10.6.5 The contractor shall lead briefings/meetings in support of OPTEVFOR PTIP activities in accordance with the referenced Best Practice series.

5.10.6.6 The contractor shall provide a trip report (DELIVERABLE A002) when contract activities occur away from the OPTEVFOR site in Norfolk, VA.

5.10.7 Document and Brief Preparation

5.10.7.1 The contractor shall prepare and document briefings (DELIVERABLE A001) to include the Evaluation Report, Post-Test Brief, Scoring Board, Critical Operational Issue (COI) Evaluation Working Group (CEWG) products, SERB/E-SERB Brief, Data Analysis Summary, and Blue /Gold Sheets.

5.10.7.2 The contractor shall prepare the Risk/Deficiency cover letter, the DAS, and the Test Report per the OT&E Manual, Test Reporting Handbook, and applicable Best Practices.

5.11 Cyber Security Subject Matter Expert/Operational (SME).

5.11.1 Cyber Security Support.

5.11.1.1 IAW the DoD Cybersecurity Test and Evaluation Guidebook 2.0 Series, the contractor shall utilize paragraph F.2.1.2, Cybersecurity Subject Matter Experts and Figure F-2 RASCI Table to assist the OTD and 01D Exploitation Analyst (EA) in cyber test preparations and coordination.

5.11.2 Cyber Survivability Test Planning.

5.11.2.1 Cyber Survivability Test Planning Research

5.11.2.2 The Contractor shall perform Cyber Survivability Test Planning Research in accordance with Cyber Test Planning Process guidance.

5.11.2.3 The contractor shall review and identify technical documents required to support Cyber Survivability Test Planning.

5.11.2.4 The contractor shall identify need dates for all required technical documents and provide dates to the OTD/OTC.

5.11.2.5 The contractor shall identify previous and planned Cyber Survivability tests that may contribute to current Cyber Survivability efforts.

5.11.2.6 The contractor shall conduct a Cyber Survivability level of test review with Warfare Division and Code 01D.

5.11.2.7 The contractor shall coordinate with Fleet Resources and the OTD/OTC to determine asset availability in support of Cyber Security objectives.

5.11.2.8 The contractor shall develop and provide a Cyber Survivability POA&M to support the test planning effort.

5.11.2.9 The contractor shall identify and provide risk management and recertification baseline concerns for communication to the Program Management Office (PMO).

5.11.2.10 The contractor shall document the test planning research in a Cyber Survivability Test Plan document.

5.11.2.11 The contractor shall review the test planning research during Cyber Survivability reviews.

5.11.2.12 The contractor shall provide meeting minutes, to include any required comment resolution matrix for issues, to document the results of test planning research during Cyber Survivability Test Planning reviews.

5.11.3 Cyber SUT/SoS and Schedule Development.

5.11.3.1 The Contractor shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .