RFQ Questions and Answers Completed.docx

DOCX document 23 KB Posted

Attached to
Total Bird Exclusion Netting System Removal and Installation Project
Solicitation number
N0018926QW293
Issued by

About this file

This is an RFQ Questions and Answers document that clarifies requirements for the Total Bird Exclusion Netting System Removal and Installation Project at Hangar 13, Joint Base Andrews, Maryland. The project requires contractors to remove existing netting throughout the entire hangar and install a new bird exclusion netting system to prevent avian access and nesting. All offerors must complete a mandatory site visit to obtain schematics before submitting pricing, and quotes should be based solely on the Performance Work Statement quantities and site visit observations. No additional blueprints or plans will be provided by the government.

The offer due date is 08/07/2026 at 5:00 PM ET with an anticipated award date of 20-25 September 2026, and the period of performance is 08/10/2026 through 09/07/2026. Work hours are restricted to 0800-1500 Monday through Friday, excluding Federal Holiday weekends, with Saturday work available through coordination with VR-53 Duty Section. Contractor badging and site access approval requires 3-5 business days with a recommended one-week lead time. A designated laydown and staging area will be allocated on the north side of Hangar 13 by VR-53 for materials and equipment storage. The Department of the Navy Naval Supply Systems Command is the procuring agency, and extensions to the quote due date are possible if finalized funding obligation can occur before the end of the fiscal year.

View the file

Other files

File Type Posted
Solicitation - N0018926QW293.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ Questions and Answers Q1. Are there any bird control scope or measurements?

A1: No, all participants must complete a Site Visit to get schematics for their quote to be considered for award.

Q2: Are you able to acquire any blueprints or schematics A2: No, all participants must complete a Site Visit to get schematics for their quote to be considered for award.

Q3: Do you know how much netting is currently installed in Hangar 13? The RFI includes "removal of current netting" Is there current netting up in most/all of the areas required for installation A3: There is netting throughout the entirety of Hangar 13.

Q4: Extension Request Given that a site visit is required before we can finalize pricing, and the current offer due date is 08/07/2026 at 5:00 PM ET, we'd like to request an extension to the quote due date to allow adequate time to schedule and complete the site visit. Please let us know if this is possible and, if so, a revised due date.

A4: This is possible as long as we can get a quote finalized for funding obligation before the end of the FY.

Q5: Plans and Specifications Will additional plans, drawings, or specifications be provided beyond the scope of work described in the Performance Work Statement? If not, please confirm that offerors should base their pricing solely on the PWS quantities and the site visit.

A5: Offerors should base their pricing solely on the PWS and the site visit.

Q6: Schedule / Period of Performance The solicitation lists a period of performance of 08/10/2026 - 09/07/2026. Given the offer due date of 08/07/2026, this window appears very tight. Could you confirm the anticipated award date so we can plan the 28-calendar-day performance window accordingly?

A6: 20-25Sep26

Q7: Working Hours / Access Restrictions Could you provide any specifics on working hour restrictions or blackout periods tied to flight operations or base security that we should account for in scheduling?

A7: 0800-1500 M-F except on Federal Holiday weekend, 9-12 Oct 2026. Can support Saturdays through coordination with VR-53 Duty Section.

Q8: Badging / Site Access Lead Time What is the typical lead time for contractor badging and site access approval at Joint Base Andrews? We want to ensure this is accounted for within the performance period.

A8: 3-5 business days with the recommendation of a week.

Q9: Staging / Laydown Area Is there designated laydown or staging space available on-site for materials and equipment, or should we plan for daily delivery and removal given the restrictions on work above aircraft?

A9: A space in the North side of Hangar 13 will be allocated by VR-53.