4.06a Solicitation Amendment SF 30 N0018926QW2400001.pdf

PDF 580 KB Posted

Attached to
NSSF AJT Equipment Test Bed, Onsite Preventive Maintenance, Testing and Calibration Service
Solicitation number
N0018926QW240
Issued by

About this file

This is a Standard Form 30 (SF 30) Amendment of Solicitation, issued by Naval Supply Fleet Logistics Center Norfolk on July 7, 2026, effective immediately. The amendment modifies solicitation N0018926QW240, originally dated July 6, 2026, with amendment number 0001. The document corrects technical terminology in the performance work statement and instruction materials to ensure accuracy and consistency across all contract line items (CLINs). Specifically, the amendment updates references from "ATS2 E4-16" to "ASTM E4-16" testing and calibration standards across the base year and all four option years of performance.

The contract concerns onsite annual preventive maintenance, testing, and calibration services for one government-owned AJT Equipment 21-foot, 60K Modular Horizontal Test Bed located in Groton, Connecticut. Services include all labor, parts, and travel costs, with annual scheduled visits and a 10-year major service component during the base year (August 1, 2026 to July 31, 2027). Four one-year option periods follow, extending through July 31, 2031. The amendment applies to CLIN 1001 (base year) and CLINs 2001, 3001, 4001, and 5001 (option years). The contracting officer, Mindy Morris, signed the amendment on July 7, 2026, and the contractor is required to acknowledge receipt of this amendment prior to offer submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Supplies or Services and Prices/Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description

Test Bed, Onsite Annual Preventive Maintenance, ATS2 E4-16 Testing and Calibration Service PLUS 10- Year Major Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed, Service shall include all labor, parts, and travel to Groton, CT 06349. Base Year Service - Annual Onsite Preventive Maintenance, ATS2 E4-16 Testing and Calibration Service plus 10-Year Major Service.(Qty.

1) Annual Scheduled Visit Estimated Base Year Period of Performance 01 August 2026 to 31 July 2027See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Test Bed, Onsite Annual Preventive Maintenance, ASTM E4-16 Testing and Calibration Service PLUS 10-Year Major Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed, Service shall include all labor, parts, and travel to Groton, CT 06349. Base Year Service - Annual Onsite Preventive Maintenance, ASTM E4-16 Testing and Calibration Service plus 10-Year Major Service.(Qty.

1) Annual Scheduled Visit Estimated Base Year Period of Performance 01 August 2026 to 31 July 2027See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Option Line Item 2001

INFORMATION FROM TO

Description

Test Bed, Onsite Annual Preventive Maintenance, ATS2 E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1) Annual Scheduled Visit Estimated Option 1 Year Period of Performance 01 August 2027 to 31 July 2028See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Test Bed, Onsite Annual Preventive Maintenance, ASTM E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1) Annual Scheduled Visit Estimated Option 1 Year Period of Performance 01 August 2027 to 31 July 2028See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Option Line Item 3001

INFORMATION FROM TO

Description

Test Bed, Onsite Annual Preventive Maintenance, ATS2 E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1) Annual Scheduled Visit Estimated Option 2 Year Period of Performance 01 August 2028 to 31 July 2029See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Test Bed, Onsite Annual Preventive Maintenance, ASTM E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1) Annual Scheduled Visit Estimated Option 2 Year Period of Performance 01 August 2028 to 31 July 2029See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Option Line Item 4001

INFORMATION FROM TO

Description

Test Bed, Onsite Annual Preventive Maintenance, ATS2 E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1) Annual Scheduled Visit Estimated Option 3 Year Period of Performance 01 August 2029 to 31 July 2030See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Test Bed, Onsite Annual Preventive Maintenance, ASTM E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1) Annual Scheduled Visit Estimated Option 3 Year Period of Performance 01 August 2029 to 31 July 2030See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Option Line Item 5001

INFORMATION FROM TO

Description

Test Bed, Onsite Annual Preventive Maintenance, ATS2 E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1)

Test Bed, Onsite Annual Preventive Maintenance, ASTM E4-16 Testing and Calibration Service for (1) Government-Owned AJT Equipment 21 foot, 60K Modular Horizontal Test Bed. Service shall include all labor, parts, and travel to Groton, CT 06349. (Qty. 1)

N0018926QW2400001

Annual Scheduled Visit Estimated Option 4 Year Period of Performance 01 August 2030 to 31 July 2031See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

Annual Scheduled Visit Estimated Option 4 Year Period of Performance 01 August 2030 to 31 July 2031See Incorporated Performance Work Statement (PWS) and Instructions to Quoters for Details.

N0018926QW2400001

IDCode: J
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 07 Jul 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N00189
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR NORFOLK

ATTENTION CODE 301, 1968 GILBERT STREET SUITE 600

NORFOLK, VA 23511-3392

UNITED STATES

Sharon Dexter, Email: sharon.j.dexter.civ@us.navy.mil Telephone: 860-694-3202 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N0018926QW240
SolDate: 06 Jul 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Continuation
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: 1
Copies: 1
Descript: This Solicitation Amendment is issued to correct the CLIN extended description test standard to ASTM E4-16 to match the Performance Work Statement (PWS).

All other terms and conditions remain the same.

ContNameTitle:
CoNameTitle: Mindy Morris
ContDate:
CODate: 07 Jul 2026

File details come from the government source that posted it. Updated .