This document is a Statement of Work for the fabrication of laminated southern yellow pine beams for the USS Constitution. The contractor is required to fabricate four beams measuring 18" sided x 18" molded x 25'-0" using laminated southern yellow pine with a moisture content of 12% or less. The beams must be surfaced on two sides, fabricated using glued finger joints, and wrapped for shipping. The fabricated beams must be delivered to the Charlestown Navy Yard in Boston, MA by September 30, 2024.

The related federal contract opportunity is a combined synopsis/solicitation issued by the Department of the Navy Naval Supply Systems Command for the procurement of the laminated beams under NAICS code 321114. The solicitation will be available for download on or about June 20, 2024 under RFQ number N0018924Q0214. Responses are due by June 26, 2022 and must be submitted via email. The contract will be awarded as a firm-fixed-price commercial item purchase using simplified acquisition procedures. The small business size standard is 550.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FOR NHHC DETACHMENT BOSTON

USS CONSTITUTION BEAM STOCK LAMINATED SOUTHERN YELLOW PINE

Introduction/Background

NHHC DET BOSTON is the maintenance and repair facility supporting USS CONSTITUTION.

As part of that function, NHHCDB is responsible for the maintenance and repair of the ship’s interior decking and beams.

Scope of Work

Contractor will fabricate new beam stock for USS CONSTITUTION using Laminated Southern

Yellow Pine;

1. Laminated Southern Yellow Pine Beam Stock (4PCS) - 18" SIDED x 18" MOLDED x 25'-0"

2. Edge gluing full length using glued finger joints to conform to ANSI A190

3. All Southern Yellow Pine, predominantly heartwood, waterproof adhesive and architectural grade.

4. Moisture content 12% or less.

5. Surfaced two sides and molded to dimensions required above. 2" Laminate

6. Request final product be wrapped for shipping.

7. Include all shipping costs to Charlestown Navy Yard Boston MA

Period of Performance

Contractor shall provide services for the fabrication of the beams after receipt of order and provide estimated fabrication timelines. Fabrication and shipping to Charlestown should complete NLT September 30, 2024.

Place of Performance

Vendors facility and shipping of complete, fabricated (4) pieces of Beam Stock to Charlestown

Navy Yard, Boston, MA

Work Requirements

Vendor will fabricate and ship the completed (4) pieces of Beam Stock to Charlestown Navy

Yard. Vendor will wrap the finished product for shipping.

Acceptance Criteria

Successful receipt and inspection of fabricated materials from Vendor witnessed by NHHCDB personnel.