This performance work statement outlines spill response training requirements for the Department of the Navy Naval Supply Systems Command Naval Safety and Environmental Training Center. The contractor shall provide on-site instruction and training in hazardous spill response for civilian and military first responders at various continental U.S. and overseas locations. Key requirements include a 3-day and 5-day course covering regulations, plans, equipment operation, and an exercise. The contractor must have qualified instructors and develop/update curriculum materials incorporating adult learning principles and industry standards. Pricing is firm-fixed-price by course type with travel and expenses separately priced. The base period of performance is October 1, 2023 through September 30, 2026 with four optional one-year extensions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0018923R0066 11-Sep-2023
b. TELEPHONE NUMBER
757-443-1143
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 15 Sep 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N001899. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
BENJAMIN M. BETHEL
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVSUP FLC NORFOLK CONTRACTING
NORFOLK OFFICE
ATTN: BENJAMIN BETHEL
1968 GILBERT STREET STE 600
NORFOLK VA 23511-3392
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N91732 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NAVAL SAFETY AND ENVIRONMENTAL TRAINING
HALLOCK MOHLER
9080 BREEZY POINT CRESCENT
NORFOLK VA 23511-3998
TEL: (757) 445-8778 X-347 FAX:
757-443-1143FAX:
TEL: 757-443-1143 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$13,500,000
NAICS:
621112
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF74
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
PWS
PERFORMANCE WORK STATEMENT (PWS) Spill Response Training for First Responders
1. GENERAL: This is a non-personal services contract to provide on-site instruction and training in hazardous spill response for first responders. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor, who, in turn, is responsible to the Government.
1.1 Scope of Work: The contractor shall provide services for the Naval Safety and Environmental Training Center, Norfolk, VA. These services shall provide instruction for the environmental and emergency management courses described below conducted by the Naval Safety and Environmental Training Center (NAVSAFENVTRACEN) and student record keeping support typical for educational programs as set forth by NAVSAFENVTRACEN.
1.2. Mission: The mission of the NAVSAFENVTRACEN is to provide quality education and training for military and civilian Navy and Marine Corps personnel, both afloat and ashore, in the areas of occupational safety, environmental protection, and emergency management leading to:
• Enhanced operational readiness
• A safe and healthful workplace
• Stewardship through compliance with applicable regulations
2. Description of Services/Introduction: This requirement is to provide on-site instruction and training in hazardous spill response for civilian and military personnel who are or may be designated as leaders and/or team members on the Facility Response Team or facility Spill Management Team (SMT).
2.1 Number of Classes:
Course 3Year Ordering Period FAR Clause 52.217-8 Option
Facility Response Team 5-Day 225 25 Facility Response Team 3-Day 225 25
It is emphasized that the number of classes is only an estimate since the actual number of classes held is controlled by the need of students to receive this training and funding constraints. Training schedules are planned on a year to year basis and the contractor will be notified at least thirty (30) days prior to the beginning of each fiscal year as to the number and locations where the training will be held. Classes may be held, for example, in the following locations listed below in Table 1.
2.2 Background: Training for Navy and Marine Corps spill response personnel is required and regulated by
OPNAV M5090.1 Chapter 39, Oil and Hazardous Substance Spill Prevention and Response, and 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response. The primary mode of training for Navy and Marine Corps Facility Response Teams (FRTs) has been 3-day and 5-day classes that include on-water exercises in deploying boom and responding to and capturing spills or protecting sensitive areas.
Training may be received at an interval not to exceed once every 2 years.
2.3 Objective: To satisfy OSHA and OPNAV training requirements. See OPNAV M5090.1 Chapter
39.3(1), https://www.secnav.navy.mil/doni/SECNAV%20Manuals1/5090.1.pdf, and 29 CFR 1910.120 for a full discussion and list of these requirements. Appendix E of 29 CFR 1910.120 gives guidelines for the content of the Facility Response Plan Training.
Train Navy and Marine Corps personnel “on the safe use of [their facility’s oil spill response] equipment and in effective response techniques” according to their facility’s Facility Response Plan (FRP) or other spill response plan they may follow. This training should be specific to the facility’s layout and spill scenarios. Essentially, it should give the FRT the knowledge and skills it needs to execute the facility’s FRP. Identify basic facts and terms about the duties of the Facility Response Team. Identify basic facts about the Regulations and Instructions governing various national environmental regulations. State general principles about incident/event reporting and response in accordance with (IAW) OPNAV 5090.1E and 29 CFR 1910.120(q) for First Responder Operations Level.
Define basic facts and state general principles of planning and preparation requirements when executing the facility’s FRP in accordance with OSHA and OPNAV standards. Given a scenario, determine step-by-step procedures for emergency actions IAW standards on the locally developed processes. Given a scenario and references, facilitate a spill exercise IAW the base FRP checklist in conjunction with OPNAV, OSHA, and EPA standards.
3. Scope: The Contractor shall provide in-person instruction at various locations across both Continental United
States (CONUS) and Outside the Continental United States (OCONUS) Government locations. The target audience is Civilians and military personnel who are, or may be designated as, leaders and/or team members on the FRT or facility SMT members. The class offering must be 24 hours for a 3-day class or 40 hours for a 5-day class in duration. Classes may be held, for example, in the locations listed below in Table 1. If needed due to emergent circumstances such as new operations or spill response requirements, and on a rare basis, new locations may be added.
Table 1: Class Locations
Number Location Activity 1 Bahamas NUWC-AUTEC Det.
2 California NAVBASE Coronado 3 California NAVBASE Point Loma 4 California NAVBASE San Diego 5 California NAVSUP FLC San Diego 6 California NBVC-Port Hueneme 7 California NWS Seal Beach 8 Connecticut SUBASE New London 9 Cuba NAVSTA Guantanamo Bay 10 Diego Garcia NSF Diego Garcia 11 Florida NSA Panama City 12 Florida NAS Key West 13 Florida NAS Pensacola 14 Florida NAVSTA Mayport 15 Georgia SUBASE Kings Bay 16 Greece NSA Souda Bay 17 Guam NAVSTA Guam 18 Hawaii JB Pearl Harbor-Hickam 19 Hawaii MCB Hawaii 20 Hawaii PMRF Barking Sands 21 Italy NSA Naples-Gaeta Det.
22 Japan NAF Atsugi 23 Japan MCB Camp Butler 24 Japan MCAS Iwakuni 25 Japan CFA Okinawa 26 Japan CFA Sasebo 27 Japan CFA Yokosuka 28 Japan NAVSUP FLCY-Hachinohe Det.
29 Japan NAVSUP FLCY Hakozaki Det.
30 Japan NAVSUP FLCY-Sasebo Det.
31 Japan NAVSUP FLCY-Tsurumi Det.
32 Maryland NSA Annapolis 33 Maryland NSF Indian Head 34 New Hampshire NSY Portsmouth 35 New Jersey NWS Earle 36 North Carolina MCAS Cherry Point 37 North Carolina MCB Camp Lejeune 38 Rhode Island NAVSTA Newport 39 South Carolina MCAS Beaufort 40 Spain NAVSTA Rota 41 Virginia NNSY Norfolk 42 Virginia NAVSTA Norfolk 43 Virginia JEB Little Creek-Fort Story 44 Washington NAVBASE Kitsap-Bangor 45 Washington NAS Whidbey Island 46 Washington NAVSTA Everett 47 Washington NAVSUP FLC Puget Sound 48 Washington NSY & IMF Puget Sound 49 Washington NAVMAG Indian Island
FRT training and Spill Management training are the two courses that are required by the Navy and Marine Corps. The course given to each activity depends on its precise requirements and needs for oil spill response. The two courses are described as follows:
3.1 FRP Training – This type of training is described in OPNAV M5090.1, Chapter 39-3.3(a), FRP Training. It is also known as FRT Training. The intent is to train Navy and Marine Corps personnel “on the safe use of [their facility’s oil spill response] equipment and in effective response techniques,” according to their facility’s FRP.
This training should be specific to a facility. Essentially, it should give the FRT the knowledge and skills it needs to execute the facility’s FRP.
This training should be in compliance with the requirements given in OPNAV M5090.1 Chapter 39.3(1), https://www.secnav.navy.mil/doni/SECNAV%20Manuals1/5090.1.pdf, and 29 CFR 1910.120. Appendix E of 29 CFR 1910.120 offers guidelines for FRP Training. Each student who successfully completes this training shall be given a written certification that he or she is qualified as a tier-one responder.
Qualified Individual (notification exercises are conducted to ensure the QI can be reached in an emergency to carry out their required duties. Emergency procedure exercises are performed to ensure personnel are capable of conducting the initial actions necessary to mitigate the effects of a spill.
Course offerings should instruct FRT members in the proper capability instruction to cover response to oil spills in harbors and near-shore environments to provide personnel assigned to the installation FRT with the basic skills needed to perform as a member of the FRT. FRT 5-day course offers one day of classroom training and four days of on-water practical training. FRT 3-day course offers one day of classroom training and two days of on-water practical training. Students gain an understanding of oil spills, regulations concerning their roles, the facility’s FRP, the Area Contingency Plan (ACP), and operating and applying all supplied equipment during a spill event. The safety subjects covered by this course meet the Occupational Safety and Health Administration (OSHA) requirements in 29 CFR 1910.120(q) for First Responder Operations Level and OPNAV M-5090.1E, Chapter 39.
3.1.1 Exercises: 40 CFR Part 112 subpart D requires facilities to train and exercise to be prepared to respond to oil spills. The final day of course, should include an exercise that is designed to test the team members in executing their local Facility Response Plan (FRP). On-water emphasis is to teach the FRT how to contain and recover oil on water as well as execute sensitive area protection strategies as outlined by facility plans. Exercise with the uses of Protective booming strategies must be developed, where feasible, and implemented for petroleum, oils, and lubricant transfer operations when any of these conditions exist: (a) Protective booming is required by law or regulation; (b) The nature or volumes of fuels to be transferred is of sufficient magnitude that prudent operational risk management indicates protective booming is required; (c) Environmentally sensitive areas are likely to be negatively impacted in the event of a spill; or (d) Potential spills could generate significant negative public perception or so adversely affect political relations with a host nation or local jurisdiction that continued port access may be jeopardized.
3.1.2 Operational Checks: Equipment deployment exercises should test equipment readiness, and ensure personnel who would normally deploy, and operate or supervise the operation of response equipment, are capable of doing so. Facility FRT equipment and personnel operational assessment course report should be completed and provided to the NAVSAFENVTRACEN Commanding Officer via the course manager and Executive Director no later than 7 working days following course completion.
3.1.3 Risk Assessment: The Contractor shall provide a written Risk Assessment for each class or training location to NAVSAFENVTRACEN Commanding Officer via the course manager. Additionally, if and when there is/are any change(s) impacting the Risk Assessment, notify NAVSAFENVTRACEN Commanding Officer via the course manager and Executive Director immediately or 24 hours prior to the evolution.
3.2 Spill Management Team Training – This type of training is described as follows in OPNAV M5090.1, Chapter 39-3.3(c), National Incident Management System Training: “All personnel assigned to an SMT shall receive an appropriate level of Incident Command System (ICS) training.” This course will provide personnel with the knowledge and skills to manage oil spill responses in compliance with applicable Federal, State, U.S. Coast Guard, and local regulations and statutes. The course should give students a practical understanding of their roles on the SMT and provide them with the knowledge to maintain an effective oil spill response program.
SMT tabletop exercises are conducted to ensure SMTs are familiar with the contingency plan and individual responsibilities assigned by the plan and able to use it effectively to conduct a spill response. A response plan lists different types of SMTs for varying spill sizes (ex, a local SMT for small spills, a regional team for larger spills, and a national team for major spills). The course should include a tabletop exercise simulating various spill incidents, requiring students to utilize pertinent spill response management techniques.
3.2.1 Accreditation Standards: The Government may seek accreditation through organizations such as the Council on Occupational Education (COE) and the American Council on Education (ACE) at some point in the near future. In that regard, Contractors must ensure that curriculum design and course development efforts adhere to ACE accreditation standards and will be available to assist the government in providing necessary documentation. Should the Government decide to pursue accreditation through these other organizations, such support from the Contractor shall be within the scope of this contract.
3.2.2 Course Content: Initial course content shall be developed by the Contractor. Each course should contain a discussion on safety, particularly the FRP course for first responders. Each on-water evolution should begin with a safety brief and risk assessment. Sensitive areas, defined in the activity’s FRP, should be discussed and visited during on-water training, with FRP spill response strategies being practiced.
Course content shall be reviewed annually by NAVSAFENVTRACEN and updated by the Contractor, if necessary after the review, to reflect current regulations and state-of-the-art spill response techniques and tactics. The Contractor shall incorporate the Instructional System Design (ISD) curriculum development process to follow the industry standard Plan, Analyze, Develop, Design, Implement, Evaluate, and Maintenance (PADDIE+M) approach per this PWS. This requirement includes, without limitation, the ability to verify the technical and operational accuracy of subject content within the planned course materials. Must have Industry Qualified Instructors.
Must provide Instructor Resumes and certifications.
3.3 Due Dates:
Course Development Phase: Due Oct 20th.
The Contractor shall design, develop, and deliver a 3-day class totaling 24 hours or 5-day class totaling 40 hours of instruction at applicable sites as identified in this PWS.
Course Design Phase: Due Nov 10th.
The Contractor shall submit the initial course layout (Topics outlined).
3.4 Learning Principles: The Contractor shall apply adult learning principles throughout course instruction.
3.5 Instruction Objectives: The Contractor shall provide instructors who
Thoroughly prepare and understand the stated course objectives prior to instructing;
Communicate the stated learning objectives to the students within scheduled class hours;
Are qualified to give spill response training, as outlined in CFR 1910.120 Use the expertise and personal experience to provide relatable examples that supplement or enhance materials to the extent to which they contribute to course objectives; and Incorporate individual and group learning exercises through scenario-based activities, knowledge checks, and facilitated group discussions.
The objective for this course are as follows:
Identify basic facts and terms about the duties of the Facility Response Team.
Identify basic facts about the Regulations and instructions governing various national, state, and local environmental regulations.
State general principles about incident/event reporting and response IAW OPNAV 5090.1E and 29 CFR
1910.120(q) for First Responder Operations Level.
Define basic facts and state general principles of planning and preparation requirements when executing the facility’s FRP IAW OSHA, EPA, and OPNAV standards.
Given a scenario, determine step-by-step procedures for emergency actions in accordance with standards on the locally developed processes.
Given a scenario and references, facilitate a spill exercise IAW the base FRP checklist in conjunction with OPNAV, OSHA, and EPA standards.
3.6 Professional Learning Environment: The Contractor shall apply the following classroom concepts during the instruction of all courses:
Dialogue – Positive and courteous interaction between learners and instructors shall occur.
Supportive Atmosphere – The Contractor shall establish a comfortable learning environment that includes a nurturing instructor, friendly and informal discussion, and a non-threatening atmosphere where a student can ask questions without fear of embarrassment or condemnation.
Encouragement of Cooperative Communication – Clear opportunities for discussion between learners and instructors as well as learners amongst each other.
Professionalism and Impression Management – All instructors shall maintain a professional business presence that is reflective of the curriculum being provided. All instructors providing training shall refrain from making any comments that may reflect negatively on DOD or any government activity or program and or facilitating any such discussions amongst students during classes.
3.7 Class Size: The Contractor shall be fully capable of instructing courses at any Government operating site as specified in this requirement. Class size will not exceed 40 participants unless otherwise agreed upon by the Government and the contractor. In addition, the class size of the FRP course or other course that includes on-water instruction will be limited to the number of students who can safely participate in the planned on-water training and exercises given the duration of the class and the number of boats at the activity.
3.8 Course Material: The Contractor shall be responsible for providing students with all course materials.
NAVSAFENVTRACEN reserves the right to approve or deny the use of course material. The Contractor shall also be responsible for bearing any costs associated with the reproduction and distribution of student materials. Course materials shall demonstrate sound comprehensive professional quality beyond simplified workbooks and PowerPoint presentations.
The Contractor shall demonstrate experience in instructional presentation technologies, practical experience instructing in the specialty area. The Contractor shall demonstrate teaching a lesson, with multi-media and lesson plan and sample Evaluation method. All material shall be in proper training/presentation format. Acceptable formats are Microsoft PowerPoint, Word, Excel, and PDF.
However, Microsoft PowerPoint should not be the only format used for training.
The Contractor is responsible for providing a student guide/manual at the beginning of the course for the student to use and keep. A course syllabus must be in each student guide/manual, which outlines the topics to be covered, on which days, and the approximate amount of time to be spent on each topic.
Also to be included in the student guide/manual are copies of any computer-generated graphics to be shown along with note-taking space. The order of the material in the student manual shall follow the order in which the material is presented in class in order to reduce any confusion among the students by having them skip around through the manual searching for the proper pages.
All materials developed by the Contractor shall remain the property of the United States Government.
The Contractor shall create an electronic student handbook, and it should be a fillable document allowing students to take notes within the document.
The Contractor shall also provide this electronic student handbook to each participant via downloadable PDF at each training site.
The Contractor shall provide/utilize the following items for each site:
End-of-course evaluations (Must use NAVSAFENVTRACEN Learning Portal with the aid of official QR Code for portal access. NOTE: QR Code is Government provided) NAVSAFENVTRACEN Learning Portal Gradebook.
NAVSAFENVTRACEN Certificate.
Lesson plans.
Printed and/or electronic student handouts required to complete training, group, and individual exercises.
Training support materials (e.g., scenarios, case studies, note cards, or other small group activities) as appropriate for in-class use.
3.9 Academic Standards:
Academic Issues: In cases of student academic problems, the Contractor is expected to provide counseling and remediation. The Contractor shall notify the COR or Course Manager immediately of any student having academic problems. The government reserves the right to make any decision concerning termination or extension of training for the student with academic problems.
Academic Pace: This course is a group-paced, criterion-referenced, instructor-managed, student-participation, lecture/laboratory-type instructional system that uses firmly established training procedures. All procedures will be accomplished in accordance with the latest instructional methodology.
Examination: A graded performance shall be given at the conclusion of each class to ensure that each student can execute his or her responsibilities as a first responder or SMT member. The Contractor shall provide NAVSAFENVTRACEN the course materials and tests upon request.
Proficiency Measurement: Students must have a passing grade of 70% accuracy (Ex: checklist, Performance Checks, What-if-scenarios with rubrics). The minimum passing score for all measurements is 70% to meet ACE accreditation standards. The Contractor must be able to explain how the measurement device meets this minimum standard. When identified in the objective, the minimum passing score for performance progress checks and tests will be the same as the objective standard. Identify the minimum passing standard/score in the standardized instructions given to students.
Graded performance progress checks and tests will be considered passing as long as the completed tasks award a percentage score of 70%. Percentage scores will be 70% or higher. The minimum passing score for the knowledge portion of performance progress checks, knowledge progress checks, and written tests will be 70% or higher. When using satisfactory or unsatisfactory for progress checks, the grading structure should be designed in such a manner as to divide out to and/or score a minimum of 70% to obtain the satisfactory score. The student can only miss up to 20% of the desired tasks and still pass the measurement.
3.10 Equipment: The Contractor shall coordinate an operational inventory assessment with the respective activity site classroom manager to ensure proper cables and adapters are available to connect the Contractor laptop to the activity display. However, since activities may not have every adapter for every situation, the Contractor is responsible for providing their own cables and adapters to ensure their instructors can successfully connect to the activity classroom display. Possible connections to activity displays include (but are not limited to) HDMI, DisplayPort, DVI, and VGA. All equipment checklists are due at the time of course request. The spill response inventory includes booms; skimmers; tow vessels; pumps for offloading petroleum, oil, and lubricants; portable storage; and related equipment. The Contractor must request an equipment verification checklist from the facility before course commencements.
For ease of communication, the Contractor shall use the same or compatible computer software version as the government. NAVSAFENVTRACEN primarily uses Microsoft Office products. The Contractor is responsible for providing the instructor with his or her own laptop and hotspot for internet connectivity if needed. Contractors are not allowed to require any non-disclosure agreements for materials or exercises from activity participants during the training period.
The activity will provide access to learning spaces for the delivery of courses. The contracted trainer and FRT or SMT leader or Point of Contact (POC) will coordinate access to the facility and spaces. No training is anticipated in Contractor-owned facilities.
3.11 Course Delivery: Specific delivery information will be identified on each BPA call. The Contractor shall confirm requested training/services can be provided within ten (10) business days’ notice of the need for the training/service – this applies to CONUS & OCONUS requirements. In-person courses are limited to one (1) instructor. Specific dates, courses, and locations will be provided following award of the anticipated contract. The Contractor must be capable of delivering multiple courses, separately led at different geographically located sites at one time. These courses may be the same class titles.
3.12 Cancellation & Rescheduling Policy: The government may cancel a class (CONUS/OCONUS) within ten
(10) business days from the scheduled convening date without incurring any costs associated with the course. In the event that an unforeseen cancellation would occur, the government shall make every effort to communicate with the Contractor as soon as possible to minimize the burden to the Contractor. In the event of cancellation, postponement, or rescheduling of a learning event or other Contractor-led effort under this contract, the Contractor shall make every effort to minimize the costs to the government of the cancellation, postponement or rescheduling. The government will recognize and pay all reasonable costs associated with such cancellation, postponement, or rescheduling as the applicable contract clause provides. However, the Contractor must take immediate action after being informed of a cancellation, postponement, or rescheduling of a class to eliminate or minimize the costs associated with cancellation, postponement, or rescheduling. Nothing in this paragraph should be construed by the Contractor and interpreted by the Contractor in such a way as to hamper the management of this contract.
3.13 Evaluations: Unless otherwise stated in the PWS, the Contractor shall develop performance assessment items
(Ex: checklists, Performance Checks with graded items, and What-if-scenarios with rubrics) for every terminal learning objective aimed at Kirkpatrick Level 1 and 2 that measure student learning before and after the learning event. The Contractor shall also be required to provide an answer key with reference back to the source that supports correct outcomes for all performance assessments. NAVSAFENVTRACEN and Contractor shall safeguard all answer keys and assessment items to ensure they are not intentionally or inadvertently released in a way that compromises the ability to assess learning effectiveness. Class evaluations will be given apart from the conduct of the class and will not be required from the Contractor. The Contractor shall not request participants to complete a Contractor's training evaluation form.
3.14 Risk Assessment: Contractor shall conduct and provide a written risk assessment of mechanical and personal protective equipment, sea state, weather forecast, and qualified personnel prior to the commencement of each class. Assessment must be submitted to NAVSAFENVTRACEN Commanding Officer (via the course manager and Executive Director) 24 hours prior to the commencement of the evolution.
3.15 Second Class Swimmer Qualification: Contractor shall ensure participants meet second class swimmer qualification, especially for on-water exercises per NETC P1552/16. Second Class Swimmer is described as a person who can stay afloat and survive without the use of a personal flotation device (PFD) indefinitely in open water under optimum conditions long enough to be rescued in a man-over-board situation. The Second Class Swimmer qualification is used as an entry-level requirement for Small Boat Operators.
3.16 Post Award Meeting (PAM): The PAM shall be conducted via teleconference from Naval Safety and
Environmental Training Center, Norfolk, VA. The Contractor attendees shall include, at a minimum, all Contractor Subject Matter Experts (CSMEs) and the contract lead.
Date – anticipated September 16-17, 2023 assuming award made prior. Subject to change after award
No. of Days – 2
3.17 Curriculum Walk-Through: The Curriculum Walk Through shall be conducted via teleconference from the Naval Safety and Environmental Training Center, Norfolk, VA. At this meeting, all CSMEs shall present the entire proposed 2-day PDTC curriculum, including cognitive and experiential content for Government attendees. Contractor attendees shall include, at a minimum, all CSMEs, and the contract lead.
Date – anticipated September 16-17, 2023 assuming award made prior. Subject to change after award
No. of Days – 2
3.18 Curriculum Validation: The Curriculum Validation shall be conducted via teleconference from Naval Safety and Environmental Training Center, Norfolk, VA. At this meeting, the CSMEs shall present entire proposed 2-day PDTC curriculum, including cognitive and experiential content, for Government attendees.
Contractor attendees shall include, at a minimum, all CSMEs and the contract lead. Dates are subject to change based on site availability.
Date – anticipated October 16-17, 2023 assuming award made prior. Subject to change after award No. of Days – 2
The Contractor shall demonstrate experience in instructional presentation technologies and have practical experience instructing in the specialty area. The Contractor shall demonstrate teaching a lesson, with multi-media and lesson plan and sample Evaluation method.
3.19 Deliverables: Class Rosters: Naval Safety and Environmental Training Center will provide a class roster to the instructor prior to each class. The Contractor shall be responsible for completing the roster by documenting attendance and indicating which students passed the class. The Contractor will be responsible for furnishing the completed rosters to the course manager within five days of the completion of the class.
Electronic Invoicing and WAWF:
Invoices shall be submitted per the instructions stated on the individual order. Receiving/Acceptance system at https://wawf.eb.mil/ (reference clause 252.232-7003).
The Contractor shall submit invoices no later than ten (10) business days upon completion of a course in accordance with the instructions provided on the individual order. Invoices shall contain a description of the course taught, the location of the delivered course and the date completed.
4 Quality Assurance Surveillance Plan (QASP): The government shall evaluate the Contractor’s performance under this contract in accordance with the QASP. This plan is primarily focused on what NAVENVTRACEN must do to ensure that the Contractor has performed in accordance with the performance standards.
NAVENVTRACEN will periodically evaluate instructors by reviewing ratings and feedback provided within voluntary class surveys that are submitted by students having attended the course and solicited in-person or by phone or email. If NAVENVTRACEN determines that student surveys or other feedback indicate a less than satisfactory performance, NAVENVTRACEN will inform the Contractor and the Contractor will provide information on what action it intends to take to mitigate performance issues. If the Contractor fails to mitigate performance issues, NAVENVTRACEN may issue negative performance ratings, cure notices, and potential removal from the contract. The government reserves the right to perform on site course audits without prior notification.
5 Contractor Personnel: The Contractor shall provide a primary point‐of‐contact (POC) to coordinate with
NAVENVTRACEN as necessary to resolve any issues that may arise associated with the delivery of training.
6 Period of Performance: The POP runs October 1 through September 30, with Delivery Order POP based on travel dates or training dates for virtual classes.
Recognized Holidays: The Contractor will not be expected to be on-site working when the government is observing federal holidays as per Federal Law (5 U.S. 6103). Specific dates for federal holidays can be found at http://www.opm.gov/.
New Year’s Day Martin Luther King Jr.’s Birthday Washington’s Birthday Memorial Day Independence Day Juneteenth Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day
6.1 Hours of Operation: The duration for the courses shall be 8 hours beginning at 0800 and ending at 1600 and are typically scheduled between Monday – Friday (unless other arrangements are scheduled with the activity or FRT POC), except for Federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. Contractor personnel are expected to conform to normal operating hours (0800-1600, local time) at the NAVSAFENVTRACEN site in which training is conducted.
6.2 Place of Performance: For in-person face-to-face training, the Contractor shall conduct training classes at
CONUS and OCONUS locations for NAVSAFENVTRACEN employees. The Contractor shall provide services under this contract at the sites and locations in Table 1 above.
6.3 Locations and Travel: The Contractor will be required to travel in performance of orders issued under this contract. Travel shall include both CONUS and OCONUS Navy and Marine Corps sites. The Contractor shall be responsible for providing all instructor travel, lodging and meal expenses associated per BPA call order under the separately priced travel CLIN. All travel estimates will be subject to the limitations contained in FAR 31.205-46 and the FAR 31.201-3 guidance of Determining Reasonableness to include JTR regulations. The agreed upon travel charges will be Firm Fixed Price.
6.4 Type of Contract: Indefinite Delivery/Indefinite Quantity (IDIQ) contract will include a five (5) year ordering period with travel as firm fixed price at the task order level.
7 Security Requirements: All the work associated with this effort will be unclassified and therefore a DD 254 is not applicable to this contract. Contractor personnel shall comply with applicable installation, facility, and area commander installation local security policies and procedures.
This effort may involve the Contractor to access to information/material ranging in sensitivity from un-sensitive to Controlled Unclassified Information (CUI) and possible Classified National Security Information (NSI) at the Secret level. All Contractor and Subcontractor employees gaining access to CUI must have a current favorable Tier 1 investigation or equivalent prior to gaining access to CUI. All Contractor and Subcontractor employees gaining access to classified NSI must have a current favorable Tier 3 investigation or equivalent prior to gaining access to Secret information. Tier 3 investigations are required for visits and instruction at NAVSUP FLC sites and DOD fuel farms. All service and support on this contract or subsequent TOs are required to be U.S. citizens and must be able to obtain and maintain favorable adjudication of the aforementioned Personnel Security Investigation (PSI). Contractors bidding on Task Order (TO) requiring access to classified information shall have the appropriate facility clearance for the level of access required.
Contractor and Subcontractor may require logical or physical access to DoD installations. Common Access Cards (CACs) will only be issued in accordance with DoDI 5200.46. Contractor employees who require physical access to a single DoD installation will use the local Defense Biometric Identification System
(DBIDS).
The Contractor and COR are responsible for ensuring that each Contractor/Subcontractor employee assigned to the position meets the above requirements prior to beginning work on this contract. The government retains the right to request removal of Contractor/Subcontractor personnel, who regardless of prior clearance or adjudication status whose actions, while assigned to this contract, are determined by the Contracting Officer or government security management office to conflict with the interests of the government. If such removal occurs, the Contractor shall assign qualified personnel, with the required investigation, to any vacancy. When a Contractor/Subcontractor employee who has been granted a clearance is removed from the contract, the Contractor shall provide an appropriately trained substitute who has met or will meet the investigative requirements of this clause. The substitute may not begin work on the TO without written documentation and concurrence from the government security management office stating that the new Contractor employee has met the criteria to support this contract. Contractor/Subcontractor individual employees removed from this contract or TO as a result of a violation of local Automated Information Systems (AIS) security policy are removed for the duration of the contract. The above security requirements for all Contractor/Subcontractor employees do not excuse the Contractor from meeting the delivery schedule/performance requirements set forth in the contract, or waive the delivery schedule/performance requirements in any way. The Contractor shall meet the required delivery schedule/performance requirements unless the Contracting Officer (KO) grants a waiver or extension.
In order to begin work, the Contractor personnel may be required to have a Controlled Unclassified Information (CUI) and/or Classified NSI at the Secret level. DoD security clearances are required prior to commencing work on a specified TO. The Contractor shall comply with all applicable DoD security regulations and procedures during the performance of this contract.
Contractor personnel shall not disclose and must safeguard sensitive procured information, computer systems and data, privacy act data, and government personnel work products, which are obtained or generated in the performance under this contract.
Contractor employees traveling to foreign countries under this effort must comply with the Foreign Clearance Guide (FCG) and gain appropriate country and theater clearance prior to travel. The Contractor Facilities Security Officer (FSO) will support foreign clearances for cleared personnel. Un-cleared foreign travelers must submit for country and theater clearance as per the FCG through the Contracting Officer’s Representative (COR) to the government Security Management Office (SMO) 45 days prior to travel.
The Contractor personnel shall complete "Conflict of Interest and Non-Disclosure Statement" forms for every employee and the appropriate corporate officer assigned to or associated with this TO on behalf of their corporation. The Government will request copies of these documents. The Contractor shall certify that it has reviewed the accepted contract specifics and referenced security plans with all Contractor employees
(including any Subcontractor personnel) prior to these employees engaging in field activities. The Contractor shall take immediate precautions for security compromises and prevention of same.
The Contractor personnel shall provide all information required to complete background checks for base/installation access. The activity POC will coordinate with the Contractor on base procedures. Course instructors and/or key personnel are required to be eligible for base access through Defense Biometric Information Systems (DBIDS) or Common Access Card (CAC) issuance per DODI 5200.46. Course instructors and/or key personnel who require base access will be required to pass a public trust background check or have a favorably adjudicated Tier 1 investigation (formerly known as National Agency Check
[NAC]).
The Contractor is responsible for safeguarding all government equipment, information, and property provided for their use. At the close of each work period and when the area is vacant of personnel, government facilities, rooms, laboratories, equipment, and materials shall be secured. At no time is government equipment, information, or property to be taken out of any DoD government facility.
Finally, the Contractor is not authorized to access government facilities before 0700 or after 1800 local time, Monday through Friday. For access to the buildings during unauthorized working hours, the Contractor will submit a request for extended hours through the appropriate chain of command (coordinate with the local POC at each course location).
7.1 Identification of Contractor Employees: All contract personnel working in situations where their
Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
8 Other Direct Costs: The Contractor shall be responsible for providing all Other Direct Costs (ODC) estimates associated per BPA call under a separately priced ODC CLIN. All indirect costs to include reproduction and shipping expenses associated with training delivery, materials, and/or activities, shall be preapproved by the contracting officer. The agreed-upon ODC charges will be Firm Fixed Price.
PART 2
DEFINITIONS & ACRONYMS
9 DEFINITIONS AND ACRONYMS:
9.1 DEFINITIONS:
9.1.1 CONTRACTOR. A supplier or Contractor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
9.1.2 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the Government.
9.1.3 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
9.1.4 DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
9.1.5 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
9.1.6 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
9.1.7 QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
9.1.8 QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
9.1.9 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
9.1.10 SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the Subcontractor.
9.1.11 TECHNICAL POINT OF CONTACT (TPOC). A representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires
9.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
9.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
9.2 ACRONYMS:
ACOR Alternate Contracting Officer's Representative AIS Automated Information Systems BPA Blanket Purchase Agreement CFA Fleet Activities Command CMNT Centrally Managed Non-Technical Training CFR Code of Federal Regulations COTS Commercial-Off-the-Shelf CAC Common Access Card CLIN Contract Line Item Number COR Contracting Officer’s Representative CPARS Contractor Performance Assessment Reporting System CSME Contractor Subject Matter Experts CUI Controlled Unclassified Information DBIDS Defense Biometric Identification System DFARS Defense Federal Acquisition Regulation Supplement Det. Detachment FRP Facility Response Plan FRT Facility Response Team FSC Facility Security Officer FAR Federal Acquisition Regulation
FFP Firm-Fixed-Price FLC Fleet Logistics Center FLCY Fleet Logistics Center Yokosuka FCG Foreign Clearance Guide IT Information Technology KO Contracting Officer MCAS Marine Corps Air Station MCB Marine Corps Base NAC National Agency Check NAF Naval Air Facility NAS Naval Air Station NAVBASE Naval Base NSY Naval Shipyard NAVSTA Naval Station NAVSUP Naval Supply System Command NSA Naval Support Activity NSF Naval Support Facility NWS Naval Weapons Station ODC Other Direct Costs PWS Performance Work Statement PFD Personal Flotation Device PSI Personnel Security Investigation POC Point of Contact QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control SMT Spill Management Team TO Task Order TPOC Technical Point of Contact SUBASE Naval Submarine Base WFD Workforce Development WAWF Wide Area Work Flow
PART 3
CONTRACTOR FURNISHED ITEMS AND SERVICES
10 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
10.1 General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this PWS.
10.2 Materials: The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.
ORDERING GUIDELINES
Ordering Guidelines The purpose and scope of this Single Award Task Order Contract (SATOC) is to provide Spill Response Training for First Responders in accordance with the enclosed PWS. The ordering guidance for the IDIQ Contract has been simplified and streamlined for maximum flexibility and quick reaction response.
I. IDIQ Ceiling: This IDIQ has a $3,999,788.17 ceiling.
II. Maximum Task Order: The maximum Task Order size is $3,999,788.17. Any exceptions must be approved by the KO.
III. Minimum Task Order: The minimum Task Order size is $1.00.
IV. Contract Type: Task orders shall be FFP. There are no ODC or other type CLINS included with this Contract;
however, the agency may include other CLINS and CLIN types as required and authorized by modification.
V. CLIN Type: This IDIQ Contract has two CLINS. The main CLIN is FFP, with a unit of issue of JOB. The eCMRA CLIN is FFP with unit issue of JOB and price of NSP.
VI. Pricing: TBD.
LIST OF ATTACHMENTS
i. Contractor Discrepanct Report(CDR)
ii. Contract Administration Plan (CAP)
iii. Quality…