N0018925Q0370.pdf
PDF 551 KB Posted
- Solicitation number
- N0018923Q0370
About this file
This document is a Solicitation/Contract/Order for Commercial Items (SF 1449) for Navy Expeditionary Combat Command Small Arms Weapons Simulator (SAWS) Depot-Level Maintenance Support Services. The sole source contract will be awarded to InVeris Training Solutions for warranty support services covering equipment at two Navy locations: Naval Construction Group One in Port Hueneme, CA and Naval Construction Group Two in Gulfport, MS. The base period is one year with two additional one-year option periods, totaling three years.
The contract includes one-year warranty contracts for various weapon simulator types, including rifle/shotgun/submachine gun simulators (e.g., M4/M16/MP5), machine gun simulators (M249/M240), heavy weapons simulators (MK19/M2/Mortar), pistol/handgun simulators, and accessories like fill stations and additional magazines. Maintenance will be performed by shipping non-functioning equipment to InVeris Training Solutions for evaluation and repair, with shipping costs covered under the extended warranty. The contract is structured with separate line items for base year and option year services for each location, with a total contract duration not to exceed 36 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0018925Q03700001.pdf | ||
| Redacted Sole Source Justification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0018925Q0370 02-Jul-2025
b. TELEPHONE NUMBER
757-443-1706
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 08 Jul 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N001899. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SHERELL G. BROWN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N5546025RC003AD
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVSUP FLC NORFOLK CONTRACTING
NORFOLK OFFICE
ATTN: S. BROWN
1968 GILBERT STREET, SUITE 600
NORFOLK VA 23511-3392
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
757-443-1333FAX:
TEL: 757-443-1706 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$12,500,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF66
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0018925Q0370
Section SF 1449 - CONTINUATION SHEET
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FOR NAVY EXPEDITIONARY COMBAT COMMAND (NECC) SMALL ARMS WEAPONS
SIMULATOR (SAWS) DEPOT-LEVEL MAINTENANCE SUPPORT
SCOPE
Commander Navy Expeditionary Combat Command has a continuing mission to train and qualify subordinate command personnel in small arms per the OPNAVINST 3591.1 (Series). This instruction specifically authorizes the use of small arms simulators (SAWS) to support pre-qualification familiarization, practice, sustainment and proficiency in marksmanship and Hostile Intent Determination (HID) scenario-based situations.
REQUIREMENT
The requirement is to procure SAWS equipment depot-level maintenance service (in the form of extended warranties), on-site technical support service, and operator training supporting 2 NECC sites located in Gulfport MS and Port Hueneme CA. SAWS equipment depot-level maintenance will be accomplished by shipping non-functioning equipment to InVeris Training Solutions for evaluation and repair. The expense of shipping the repaired SAWS equipment to-and-from InVeris Training Solutions is to be covered under the extended warranty.
NECC SAWS equipment requiring depot-level maintenance service:
1. NAVAL CONSTRUCTION GROUP ONE Port Hueneme CA (Base Year):
Number of Items Item Description
One Year Warranty Contract for one Rifle\Shotguns\Sub Machine Gun
(M4\M16\MP5\M203\M320\Mossberg) Weapon Simulator
One Year Warranty Contract for one Machine Gun
(M249\M240\PKM) Weapon Simulator
One Year Warranty Contract for one Heavy Weapons
(MK19\M2\Mortar) Weapon Simulator
One Year Warranty Contract for one Non-Leathal/Accessories
(Fill Station) Weapon Simulator
NAVAL CONSTRUCTION GROUP ONE Port Hueneme CA (Option Years 1-2):
2 One Year Warranty Contract for one 100s/Rack B Virtual Training System
One Year Warranty Contract for one Pistol\Handgun (Glock\M17\M18\M9\M&P\Sig) Weapon Simulator
One Year Warranty Contract for one Rifle\Shotguns\Sub Machine Gun
(M4\M16\MP5\M203\M320\Mossberg) Weapon Simulator
One Year Warranty Contract for one Machine Gun
(M249\M240\PKM) Weapon Simulator
One Year Warranty Contract for one Heavy Weapons
(MK19\M2\Mortar) Weapon Simulator
One Year Warranty Contract for one Non-Leathal/Accessories
(Fill Station) Weapon Simulator
2. NAVAL CONSTRUCTION GROUP TWO GULFPORT MS (Base Year):
One Year Warranty Contract for one Rifle\Shotguns\Sub Machine Gun
(M4\M16\MP5\M203\M320\Mossberg) Weapon Simulator
One Year Warranty Contract for one Machine Gun
(M249\M240\PKM) Weapon Simulator
One Year Warranty Contract for one Heavy Weapons
(MK19\M2\Mortar) Weapon Simulator
One Year Warranty Contract for one Non-Leathal/Accessories
(Fill Station) Weapon Simulator
36 One Year Warranty Contract for one Additional Magazines Accessory
NAVAL CONSTRUCTION GROUP TWO GULFPORT MS (Option Years 1-2):
6 One Year Warranty Contract for one 100s/Rack B Virtual Training System
One Year Warranty Contract for one Pistol\Handgun (Glock\M17\M18\M9\M&P\Sig) Weapon Simulator
One Year Warranty Contract for one Rifle\Shotguns\Sub Machine Gun
(M4\M16\MP5\M203\M320\Mossberg) Weapon Simulator
One Year Warranty Contract for one Machine Gun
(M249\M240\PKM) Weapon Simulator
One Year Warranty Contract for one Heavy Weapons
(MK19\M2\Mortar) Weapon Simulator
One Year Warranty Contract for one Non-Leathal/Accessories
(Fill Station) Weapon Simulator
36 One Year Warranty Contract for one Additional Magazines Accessory
STATION REGULATIONS
The Contractor and his employees and subcontractors shall become familiar and comply with all applicable Federal, State, Local and Station regulations, including fire, safety, traffic and security regulations. No employee of the Contractor shall be admitted to work site without satisfactory proof of United States citizenship. The Contractor shall be required to have all appointments, certifications, or licenses required for this work. The Contracting officer may request proof of such certifications or licenses at any time.
Contractor Point of Contact (POC)
No later than ten (10) days after contract award, the contractor shall designate in writing an individual who will serve as the primary point of contact for the NECC Project Management POC, Contracting Officers Representative (COR) and Technical Assistant (TA) regarding issues relating to this contract. This written designation shall be sent to the Procuring Contract Officer (PCO) and COR. This individual shall be empowered to make management level decisions in support of this contract effort, and shall submit all deliverable cited in this PWS.
PROJECT MANAGEMENT POINT OF CONTACT:
NECC
COR and Training Simulator Project Manager (PM): Mr. Perino Walker Office Telephone: (757) 462-4316x331 E-mail: perino.a.walker.civ@us.navy.mil
Gulfport MS Customer Project Manager (PM): Mr. Stephen Nelson Office Telephone: (228) 822-5099 E-mail: stephen.e.nelson@navy.mil
Port Hueneme CA Customer Project Manager (PM): Mr. Reggie Martinez Office Telephone: (805) 982-5964 E-mail: refugio.j.martinez@navy.mil
THE FOLLOWING NAVSUP LOCAL TEXT IS HEREBY MADE PART OF THE STATEMENT OF
WORK/PERFORMANCE WORK STATEMENT.
ABILITY ONE
NAVSUP FLCN may utilize contractor support through the AbilityOne Program, as needed, to perform contract closeout functions for this acquisition. Information, including business sensitive/confidential or proprietary data, that the offeror provides to the Government or information already in the possession of the Government may be viewed and utilized by the AbilityOne Program support contractor personnel during the course of its contract performance.
The information that may be made available to the support contractor may include, for example, pricing and technical proposals, historical contract, pricing and performance information, Commercial Asset Visibility (CAV) reporting information and similar data/information.
By submission of a proposal in response to this solicitation, the offeror and its subcontractors consent to a release of their business sensitive/confidential or proprietary data to the Government's AbilityOne Program support contractor personnel in order to perform close out services. Prior to the release of any such information to the support contractor, the support contractor will have in place with the Government a Non-Disclosure/Non-Use Agreement in accordance with the terms of the AbilityOne Program support contract.
Offerors may execute their own Non-Disclosure Agreement with the AbilityOne Program (AbilityOne contact information available from the contracting point of contact). The support contractor must provide copies of the executed agreements to the Contracting Officer and the Contracting Officer's Representative (COR) for the support contract; and the offeror/contractor for this acquisition must provide copies of the executed Agreement to the Contracting Officer for this acquisition. If the offeror/contractor seeks such a Non-Disclosure Agreement with the AbilityOne Program support contractor, the Agreement must be executed no later than the date of final delivery under the resulting NAVSUP FLCN contract.
EXPEDITING CONTRACT CLOSEOUT
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is:
NAME: Sherell Brown EMAIL ADDRESS: sherell.g.brown.civ@us.navy.mil
Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information Technology (IT) Systems or Protected Health Information Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD- 12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.
APPLICABILITY
This text applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DON or DoD computer/network/system to perform certain unclassified sensitive duties. This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.
Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
ACCESS TO DOD IT SYSTEMS
In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI).
All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager.
Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation, which is a higher-level investigation than the National Agency Check with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for High-Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1 and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N;
therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.
The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
INTERIM ACCESS
The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally controlled information system/network and/or to government information, meaning information not authorized for public release.
CONTRACTOR’S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three workdays after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE
DUTIES
Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non- Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:
SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product) Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) Original Signed Release Statements
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Command’s Security Manager upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources.
The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM); Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF- 86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.
If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES
Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc. ...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:
Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and
Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.
To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:
SF-85 Questionnaire for Non-Sensitive Positions Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
Original Signed Release Statements
The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
* Consult with your Command Security Manager and Information Assurance Manager for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.
CAAD AND CAP
CONTRACT ADMINISTRATION APPOINTMENTS AND DUTIES
In order to expedite administration of this contract/order, the following delineation of duties is provided including the names, addresses and phone numbers for each individual or office as specified. The individual/position designated as having responsibility should be contacted for any questions, clarifications or information regarding the functions assigned.
1. PROCURING CONTRACTING OFFICER (PCO) is responsible for:
a. All pre-award information, questions, or data;
b. Freedom of Information inquiries;
c. Change/question/information regarding the scope, terms or conditions of the basic contract document; and/or
d. Arranging the post award conference (See FAR 42.503).
Name: Sherell Brown Address: NAVSUP Fleet Logistics Center (FLC) Norfolk 1968 Gilbert St, Suite 600, Norfolk, VA 23511-3392 Phone: 757-443-1706 Email: Sherell.g.brown.civ@us.navy.mil
2. CONTRACT ADMINISTRATION OFFICE (CAO) is responsible for matters specified in FAR 42.302 and DFARS 242.302 except in those areas otherwise designated herein.
Name: Sherell Brown Address: NAVSUP Fleet Logistics Center (FLC) Norfolk 1968 Gilbert St, Suite 600, Norfolk, VA 23511-3392 Phone: 757-443-1706 Email: Sherell.g.brown.civ@us.navy.mil
3. DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA) is responsible for contract administration functions delegated by the PCO.
Not Applicable
4. PAYING OFFICE is responsible for payment of proper invoices after acceptance is documented.
Name: DFAS Address: CLEVELAND, OH 44199 Phone: N/A
5. CONTRACTING OFFICERS REPRESENTATIVE/TASK ORDER MANAGER (COR/TOM) is responsible for:
a. Liaison with personnel at the Government installation and the contractor personnel on site;
b. Technical advice/recommendations/clarification on the statement of work;
c. The statement of work for delivery/task orders placed under this contract.
d. An independent government estimate of the effort described in the definitized statement of work;
e. Quality assurance of services performed and acceptance of the services or deliverables;
f. Government furnished property;
g. Security requirements on Government installation;
h. Providing the PCO or his designated Ordering Officer with appropriate funds for issuance of the Delivery/Task order; and/or
i. Certification of invoice for payment.
NOTE: When, in the opinion of the Contractor, the COR/TOM requests effort outside the existing scope of the contract (or delivery/task order), the Contractor shall promptly notify the Contracting Officer (or Ordering Officer) in writing. No action shall be taken by the contractor under such direction until the Contracting Officer has issued a modification to the contract or, in the case of a delivery/task order, until the Ordering Officer has issued a modification of the delivery/task order; or until the issue has otherwise been resolved. THE COR/TOM IS NOT AN
ADMINISTRATIVE CONTRACTING OFFICER AND DOES NOT HAVE THE AUTHORITY TO DIRECT
THE ACCOMPLISHMENT OF EFFORT WHICH IS BEYOND THE SCOPE OF THE STATEMENT OF WORK
IN THE CONTRACT OR DELIVERY/TASK ORDER.
Name: Perino Walker Phone: (757) 462-4316 ext. 331 Email: perino.a.walker.civ@us.navy.mil
In the event that the COR/TOM named above is absent due to leave, illness, or official business, all responsibilities and functions assigned to the COR/TOM will be the responsibility of the alternate COR/TOM listed below:
N/A
6. TECHNICAL ASSISTANT, if assigned by the requiring activity, is responsible for providing technical assistance and support to the COR in contract administration by:
a. Identifying contractor deficiencies to the COR;
b. Reviewing contract/delivery/task order deliverables and recommending acceptance/rejection of deliverables;
c. Identifying contractor noncompliance of reporting requirements;
d. Evaluating contractor proposals for specific contracts/orders and identifying areas of concern affecting negotiations;
e. Reviewing contractor reports providing recommendations for acceptance/rejection;
f. Reviewing invoices for appropriateness of costs and providing recommendations to facilitate certification of the invoice;
g. Providing COR with timely input regarding the SOW, technical direction to the contractor and recommending corrective actions; and
h. Providing written reports to the COR as required concerning trips, meetings or conversations with the contractor.
Name: -------N/A---------------------------------------- Address: ------------------------------------------------ Phone: ------------------------------------------------
(End of text)
CONTRACT ADMINISTRATION PLAN (CAP)
FOR FIXED PRICE CONTRACTS
In order to expedite the administration of this contract, the following delineation of duties is provided. The names, addresses and phone numbers for these offices or individuals are included elsewhere in the contract award document. The office or individual designated as having responsibility should be contacted for any questions, clarifications, or information regarding the administration function assigned.
1. The Procuring Contract Office (PCO) is responsible for:
a. All pre-award duties such as solicitation, negotiation and award of contracts.
b. Any information or questions during the pre-award stage of the procurement.
c. Freedom of Information inquiries.
d. Changes in contract terms and/or conditions.
e. Post award conference.
2. The Contract Administration Office (CAO) is responsible for matters specified in the FAR 42.302 and DFARS
42.302 except those areas otherwise designated as the responsibility of the Contracting Officer's Representative (COR) or someone else herein.
3. The paying office is responsible for making payment of proper invoices after acceptance is documented.
4. The Contracting Officer's Representative (COR) is responsible for interface with the contractor and performance of duties such as those set forth below. It is emphasized that only the PCO/CAO has the authority to modify the terms of the contract. In no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other person be effective or binding on the Government. If in the opinion of the contractor an effort outside the scope of the contract is requested, the contractor shall promptly notify the PCO in writing. No action may be taken by the contractor unless the PCO or CAO has issued a contractual change. The COR duties are as follows:
a. Technical Interface
(1) The COR is responsible for all Government technical interface concerning the contractor and furnishing technical instructions to the contractor. These instructions may include:
technical advice/recommendations/clarifications of specific details relating to technical aspects of contract requirements; milestones to be met within the general terms of the contract or specific subtasks of the contract; or, any other interface of a technical nature necessary for the contractor to perform the work specified in the contract. The COR is the point of contact through whom the contractor can relay questions and problems of a technical nature to the PCO.
(2) The COR is prohibited from issuing any instruction which would constitute a contractual change. The COR shall not instruct the contractor how to perform. If there is any doubt whether technical instructions contemplated fall within the scope of work, contact the PCO for guidance before transmitting the instructions to the contractor.
b. Contract Surveillance
(1) The COR shall monitor the contractor's performance and progress under the contract. In performing contract surveillance duties, the COR should exercise extreme care to ensure that he/she does not cross the line of personal services. The COR must be able to distinguish between surveillance (which is proper and necessary) and supervision (which is not permitted). Surveillance becomes supervision when you go beyond enforcing the terms of the contract. If the contractor is directed to perform the contract services in a specific manner, the line is being crossed. In such a situation, the COR's actions would be equivalent to using the contractor's personnel as if they were government employees and would constitute transforming the contract into one for personal services.
(2) The COR shall monitor contractor performance to see that inefficient or wasteful methods are not being used. If such practices are observed, the COR is responsible for taking reasonable and timely action to alert the contractor and the PCO to the situation.
(3) The COR will take timely action to alert the PCO to any potential performance problems.
If performance schedule slippage is detected, the COR should determine the factors causing the delay and report them to the PCO, along with the contractor's proposed actions to eliminate or overcome these factors and recover the slippage. Once a recovery plan has been put in place, the COR is responsible for monitoring the recovery and keeping the PCO advised of progress.
(4) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a Contractor Performance Assessment Report (CPAR) in the CPARS Automated Information System (AIS). The initial CPAR, under an eligible contract, must reflect evaluation of at least 180 days of contractor performance. The completed CPAR, including contractor comments if any, (NOTE: contractors are allowed 30 days to input their comments) should be available in the CPARS AIS for reviewing official (PCO) review no later than 270 days after start of contract performance. Subsequent CPARs covering any contract option periods should be ready at 1-year intervals thereafter.
c. Invoice Review and Approval/Inspection and Acceptance
(1) The COR is responsible for quality assurance of services performed and acceptance of the services or deliverables. The COR shall expeditiously review copies of the contractor's invoices or vouchers, certificate of performance and all other supporting documentation to determine the reasonableness of the billing. In making this determination, the COR must take into consideration all documentary information available and any information developed from personal observations.
(2) The COR must indicate either complete or partial concurrence with the contractor's invoice/voucher by executing the applicable certificate of performance furnished by the contractor. The COR must be cognizant of the invoicing procedures and prompt payment due dates detailed elsewhere in the contract.
(3) The COR will provide the PCO and the CAO with copies of acceptance documents such as Certificates of Performance.
(4) The COR shall work with the Contractor to obtain and execute a final invoice no more than 60 days after completion of contract performance. The COR shall ensure that the invoice is clearly marked as a “Final Invoice.”
d. Contract Modifications. The COR is responsible for developing the statement of work for change orders or modifications and for preparing an independent government cost estimate of the effort described in the proposed statement of work.
e. Administrative Duties
(1) The COR shall take appropriate action on technical correspondence pertaining to the contract and for maintaining files on each contract. This includes all modifications, government cost estimates, contractor invoices/vouchers, certificates of performance, DD 250 forms and contractor's status reports.
(2) The COR shall maintain files on all correspondence relating to contractor performance, whether satisfactory or unsatisfactory, and on trip reports for all government personnel visiting the contractor's place of business for the purpose of discussing the contract.
(3) The COR must take prompt action to provide the PCO with any contractor or technical code request for change, deviation or waiver, along with any supporting analysis or other required documentation.
f. Government Furnished Property. When government property is to be furnished to the contractor, the
COR will take the necessary steps to insure that it is furnished in a timely fashion and in proper condition for use. The COR will maintain adequate records to ensure that property furnished is returned and/or that material has been consumed in the performance of work.
g. Security. The COR is responsible for ensuring that any applicable security requirements are strictly adhered to.
h. Standards of Conduct. The COR is responsible for reading and complying with all applicable agency standards of conduct and conflict of interest instructions.
i. Written Report/Contract Completion Statement.
(1) The COR is responsible for timely preparation and submission to the PCO, of a written, annual evaluation of the contractors performance. The report shall be submitted within 30 days prior to the exercise of any contract option and 60 days after contract completion. The report shall include a written statement that services were received in accordance with the Contract terms and that the contract is now available for close-out. The report shall also include a statement as to the use made of any deliverables furnished by the contractor.
(2) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a final Contractor Performance Assessment Report (CPAR) in the CPARS with 30 days of contract completion.
(3) The COR is responsible for providing necessary assistance to the Contracting Officer in performing Contract Close-out in accordance with FAR 4.804, Closeout of Contract Files.
5. The Technical Assistant (TA), if appointed, is responsible for providing routine administration and monitoring assistance to the COR. The TA does not have the authority to provide any technical direction or clarification to the contract. Duties that may be performed by the TA are as follows:
a. Identify contractor deficiencies to the COR.
b. Review contract deliverables, recommend acceptance/rejection, and provide the COR with documentation to support the recommendation.
c. Assist in preparing the final report on contractor performance for the applicable contract in accordance with the format and procedures prescribed by the COR.
d. Identify contract noncompliance with reporting requirements to the COR.
e. Review contractor status and progress reports, identify deficiencies to the COR, and provide the COR with recommendations regarding acceptance, rejection, and/or Government technical clarification requests.
f. Review invoices and provide the COR with recommendations to facilitate COR certification of the invoice.
g. Provide the COR with timely input regarding technical clarifications for the statement of work, possible technical direction to provide the contractor, and recommend corrective actions.
h. Provide detailed written reports of any trip, meeting, or conversation to the COR subsequent to any interface between the TA and contractor.
QASP & QASP MATRIX
Inspection and Acceptance Terms: All supplies/services will be inspected by the Government and accepted by the Government.
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
Performance Standards:
1. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).
2. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.
3. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints.
Performance Measurement: Performance will be measured in accordance with the following table:
Performance Element
Performance Requirement
Surveillance Method
Frequency Acceptable
Quality Level
Contractor Quality Control Plan
QC activities, inspections, and corrective actions completed as required by the plan.
Inspection by the COR
Quarterly for overall
QC
activities;
100% Compliance with the contractor plan.
Contract Deliverables
Contract deliverables furnished as prescribed in the PWS, attachments, CDRLs, Task Orders, etc., as applicable.
Inspection by the COR
100% inspection of all contract deliverables.
>95% of deliverables submitted timely and without rework required.
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the
COR’s annual report on Contractor Performance
Assessment by the COR
Annual
All performance elements rated Satisfactory (or higher)
Invoicing Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice Monthly 100% accuracy
Combatting Trafficking in Persons (CTIP)
Contractor must comply in accordance with FAR clause 52.222-50
Random Inspection
100% compliance
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/task order may result in the non-exercise of available options
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
ADDENDUM TO FAR 52.212-1
INSTRUCTIONS FOR SUBMISSIONS OF QUOTE
Price Quote:
The quoter shall complete RFQ Section “Schedule of Supplies/Services” with the total base and option contract prices.
Separate pricing information shall be submitted for each year of the services, as well as a total summary for all years of service.
A completed and signed page one (1) of the most current version of the solicitation and all amendments.
For the purpose of preparing a price quote, the quoter shall assume that the period of performance consists of one (1) 12-month base period and two (2) 12-month option periods. Quoters shall use the periods established in the schedule.
The completion and submission of the above items will constitute a quote and will indicate the quoter’s unconditional assent to the terms and conditions of this RFQ and any attachments and/or exhibits hereto. All price and price supporting information shall be contained in the price quote.
The quote shall be valid for 30 days from solicitation closing date.
Quoters responding to this solicitation are advised that, prior to award, the Government may request quoters to submit additional information/data to support price reasonableness such as copies of paid invoices for the same or similar items, sales history for the same or similar items, price lists with effective date and/or copies of catalog pages along with any applicable discounts. Failure to submit the requested information may result in disqualification of the submitted quote.
Quote Submission:
Quotes are to be submitted electronically via email to Sherell Brown at sherell.g.brown.civ@us.navy.mil and
Morgan Olszak at morgan.e.olszak.civ@us.navy.mil no later than the time and date detailed on page one
(1) of the solicitation. Quoters shall comply with the detailed instructions for the format and content of the quote contained herein; quotes that do not comply may be considered unacceptable and may render the quote ineligible for award.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Warranty Support Gulfport, MS
FFP
BASE YEAR FATS/SAWS Maintenance warranty support services in accordance with the Performance Work Statement.
FOB: Destination
BRAND NAME/SOLE SOURCE: SS
MILSTRIP: N5546025RC003AD
PURCHASE REQUEST NUMBER: N5546025RC003AD
PSC CD: J010
NET AMT
0002 1 Each Warranty Support Port Hueneme, CA
FFP
BASE YEAR FATS/SAWS Maintenance warranty support services in accordance with the Performance Work Statement.
FOB: Destination
BRAND NAME/SOLE SOURCE: SS
1001 1 Each OPTION Warranty Support Gulfport, MS
FFP
OPTION YEAR ONE FATS/SAWS Maintenance warranty support services in accordance with the Performance Work Statement.
FOB: Destination
1002 1 Each OPTION Warranty Support Port Hueneme, CA
FFP
OPTION YEAR ONE FATS/SAWS Maintenance warranty support services in accordance with the Performance Work Statement.
FOB: Destination
2001 1 Each OPTION Warranty Support Gulfport, MS
FFP
OPTION YEAR TWO FATS/SAWS Maintenance warranty support services in accordance with the Performance Work Statement.
FOB: Destination
BRAND NAME/SOLE SOURCE: SS
MILSTRIP: N5546025RC003AD
2002 1 Each OPTION Warranty Support Port Hueneme, CA
FFP
OPTION YEAR TWO FATS/SAWS Maintenance warranty support services in accordance with the Performance Work Statement.
FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 15-SEP-2025 TO
14-SEP-2026
N/A NAVAL CONSTRUCTION GROUP TWO
N75
STEPHEN NELSON
442 BROWN AVE., FACILITY 433
GULFPORT MS 39501
228-822-5099 FOB: Destination
N40273
0002 POP 15-SEP-2025 TO
14-SEP-2026
N/A NAVAL CONSTRUCTION GROUP ONE
THOMAS REVERCOMB
1436 PACIFIC ROAD
PORT HUENEME CA 93043-4301
805-824-2809
1001 POP 15-SEP-2026 TO
14-SEP-2027
N/A NAVAL CONSTRUCTION GROUP TWO
N75
STEPHEN NELSON
442 BROWN AVE., FACILITY 433
GULFPORT MS 39501
228-822-5099
1002 POP 15-SEP-2026 TO
14-SEP-2027
N/A NAVAL CONSTRUCTION GROUP ONE
THOMAS REVERCOMB
1436 PACIFIC ROAD
PORT HUENEME CA 93043-4301
805-824-2809
2001 POP 15-SEP-2027 TO
14…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .