This document contains questions and answers regarding a solicitation for the Shore Equipment Installation and Maintenance Management Program (SEIMMP). The solicitation seeks a contractor to provide installation, maintenance, and related services for physical security equipment at various Department of Navy locations. Services include warehouse management, hardware and software maintenance, and security clearance requirements. The incumbent contractor may not be required to release staff under the new contract. Clarification was provided on personnel requirements, equipment specifications, software versions, and pricing spreadsheet details. The submission deadline was extended to November 20th. No substantive changes to contract terms are anticipated at this time beyond those in Amendment I.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEND 01 - Attachment I -Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| N0018921R0003 AMEND 01.pdf | ||
| N0018921R0003.pdf | ||
| Attachment V - SEIMMP DD-254 Solicitation.pdf | ||
| Attachment III - PAST_PERFORMANCE_REPORT_FORM.docx | DOCX document | |
| Attachment I -Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment II - Past Performance Information Form.docx | DOCX document | |
| Attachment IV - CONTRACTOR_DISCREPANCY_REPORT.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Answer |
| Row 42 includes quantities for the base year and all the options; however, no part number or description are provided. Will the Government please provide the part number/description for Row 42? | Please see the revised Attachment I - Pricing Spreadsheet included as a part of Amendment I |
| Is the government’s expectation that each Key Person meet all security clearance and classification requirements listed in PWS Attachment 1, Section 2.0 within one (1) business day after contract award? | All contractor personnel performing on a task order shall meet the security clearance and classification requirements prior to the performance of any task orders requiring cleared personnel. |
| The RFP PWS does not make mention of a transition period to permit a controlled turnover from one vendor to another. Is there a designated transition period to permit the turnover from one vendor to another, if so, how long is the transition period and what are the deliverables? | No, there is not a designated transition period for the IDIQ, nor are there required transition deliverables. The Government intends to award the IDIQ prior to the beginning of the Ordering Period during which time transition actions may occur. Additionally, for on going task orders the Government intends to award the task orders at least 30 days prior to the start of task order performance to allow for transition. |
| PWS Attachment III, PHYSEC Equipment List, notes software applications and operating systems that are beyond their service life and are no longer supported (i.e. Windows 7, Windows XP, ….). Request the government confirm that those applications and operating systems are still in use and will be required to remain in use through the contract period of performance. | All software utilized under the program is updated and will be updated throughout the contract period. Currently WIN10 SHB builds of the latest version are utilized, as are LENEL software and all server and antivirus. |
| PWS Section L Instructions for Submissions of Proposal states “Offerors should include the following information in the Subject Line of their electronic submission Proposal - N0018920R0043 – (Name of Offeror) – Email (#) of (#)]]” while the solicitation number for this proposal appears to be N0018921R0003. Please clarify which solicitation number should be contained in the electronic submission subject line. | Please see Amendment 1. The referenced language has been updated to read: “Offerors should include the following information in the Subject Line of their electronic submission Proposal - N0018921R0003 – (Name of Offeror) – Email (#) of (#)]]” |
| PWS Section L Instructions for Submissions of Proposal para (2) states all attachment shall be Microsoft Office Word. Are other standard file formats acceptable such as Adobe PDF? | As stated in Section L, all documents must be submitted in Microsoft Word except for the price supporting information may be submitted utilizing Microsoft Office Excel. |
| PWS Section L Instructions for Submissions of Proposal Factor III Past Performance (page 97 of 110) notes Past Performance Information Form (Attachment IX) should it be assumed that this is the exact same form as RFP Attachment II – Past Performance Information Form? | Please see Amendment 1 where Section L has been revised to read: "The offeror shall complete a “Past Performance Information Form” (ATTACHMENT II) for each reference submitted. |
| PWS Section L Instructions for Submissions of Proposal Factor III Past Performance (page 98 of 110) notes Past Performance Report Form, Attachment X. Should it be assumed that this is the exact same form as RFP Attachment III – Past Performance Report Form? | Please see Amendment 1 where Section L has been revised to read: "In addition to the information requested above, offerors shall contact their past performance references and request |
that each reference complete the Past Performance Report Form, Attachment III to the solicitation, and e-mail the completed survey form directly to Chelsey Crawford at chelsey.crawford@navy.mil by the DUE DATE OF THIS
SOLICITATION."
| PWS Section L Instructions for Submissions of Proposal Factor V (page 99 of 110) notes the cost proposal shall be completed on Attachment VIII – Pricing Spreadsheet. Should it be assumed that this is the exact same form as RFP Attachment I – Pricing Spreadsheet. | Please see Amendment 1 where Section L has been revised to read: "Completed Attachment I – Pricing Spreadsheet" | |
| Is the due date time is 12:00 AM on November 6, 2020, or is the due date time 12:00 PM November 6, 2020? | Please see Amendment 1 which updates the submission deadline to November 20th. | |
| Does the Government anticipate any additions to the list of FAR clauses provided in the Solicitation upon contract award? | At this time, the Government does not anticipate any modifications to the FAR clauses beyond those currently incorporated into the solicitation as of Amendment I; however, future Amendments may be issued prior to the closing date of the solicitation. Should changes to the solicitation terms and conditions occur, the contract award will be issued on a bilateral basis. | |
| Key Personnel and Clearances require individuals to possess a TS/SCI clearance and certain individuals will require a TS/SCI w/CI Poly. Are these levels of clearance required at the time of award or will the Government sponsor TS cleared individuals for the required SEIMMP contract specific clearances? | All contractor personnel performing on a task order shall meet the security clearance and classification requirements prior to the performance of any task orders requiring cleared personnel. The government will consider sponsorship for other personnel as necessary. | |
| Basic Electronic Systems Engineering Plans (BESEP) talks about operational transition requirements. What is the designated period of time the incumbent will be on-site/available for the transition period? | These services are currently covered under existing task orders. Follow-on task orders will be issued at least 30 days prior to the start of the new task order to allow for transition | |
| How many FTEs currently support each of the geographic areas covered under the existing SEIMMP contract? | Due to the Indefinite Delivery, Indefinite Quantity (IDIQ) contract type, the number of FTEs and performance locations fluctuate depending on the task orders currently in performance | |
| Which locations have FTEs and which sites do not have FTEs? Does the Government anticipate that most FTEs will operate out of Fort Meade, MD, Oahu, Hawaii, and Northwest Annex Chesapeake, VA and support for the other locations will require travel? | Due to the Indefinite Delivery, Indefinite Quantity (IDIQ) contract type, the number of FTEs and performance locations fluctuate depending on the task orders currently in performance. | |
| Preparation of Site-Specific BESEP and IDPs. Will the Government provide existing BESEPs and IDPs for each of the locations prior to the Site Surveys? | This site specific information will be provided at the time of task order solicitation as needed. | |
| Will the Government provide the current as-built and configuration drawings for each location prior to the site surveys? | This site specific information will be provided at the time of task order solicitation as needed. | |
| PWS Attachment III - PHYSEC Equipment List - The System Software appears to be end-of-life (i.e. Windows 7, Windows XP, Windows Server 2008, SQL Server 2008). Are these not currently being updated and patched on a regular basis? | Yes, most uptodate software is being utilized, e.g. WIN10SHB | |
| PWS Attachment III - PHYSEC Equipment List does not include the Lenel, Bosch, Pelco, etc. hardware and quantities for each location. Will the Government provide a complete list of all hardware by location to include quantities? | This site specific information will be provided at the time of task order solicitation as needed. | |
| Does the support of this contract require the Contractor to perform any Risk Management Framework (RMF), Information Assurance (IA) and/or Cybersecurity related tasks or efforts? | No, the support required is limited to the areas defined in the Performance Work Statement | |
| Will any of the work being performed at the Contractor's facility require a DSS approved secure space and secure storage? | No, there will be no work requiring secure storage at the vendor's facility, but vendor's are required to have the requisite facility clearance as defined in the DD 254. | |
| Paragraph 1 of this section states “The contractor shall maintain the storage facility located at Naval Support Activity, Northwest Annex Chesapeake, VA. The Warehouse Specialist shall work 8 hours (not including lunch), Monday thru Friday, excluding Government Holidays, between the hours of 0700 – 1630..." | ||
| However, the labor category for this position and at this location in the Pricing spreadsheet - Services Pricing sheet - has only has 1536 hours. There is also additional hours under the Warehouse person at the contractor’s facility, therefore it appears the Northwest Annex only needs to be staffed four (4) days per week, not five (5). Please clarify these hours | The total hours between the on-site and at the contractor facility performance locations represents the total estimated level of effort. These are performance based, FFP type services and the estimated hours included are provided for informational purposes only. | |
| The Pricing Spreadsheet, Services Pricing spreadsheet has personnel, hours, and locations that do not align with table following 4.0 KEY Personnel in the PWS pages 24 - 25. | The total hours between the on-site and at the contractor facility performance locations represents the total estimated level of effort. These are performance based, FFP type services and the estimated hours included are provided for informational purposes only. | |
| The equipment in the PWS Attachment III is not included in the Attachment I - Pricing Spreadsheet, Material Pricing . Please clarify if the contractor must model up the Attachment I - Pricing Spreadsheet, Material Pricing to also include the software? | Please see the revised Attachment I - Pricing Spreadsheet included as a part of Amendment I | |
| “Those identified as KEY shall be available for assigned location as noted with applicable clearances one day after award of contract.” | ||
| To ensure equal competition between incumbent and new offerors, regarding the requirement of a one day availability of KEY staff with applicable clearances, will the Government require incumbent to release staff to new Service Provider? | The Government cannot require the incumbent to release staff or staff information. | |
| “Those identified as KEY shall be available for assigned location as noted with applicable clearances one day after award of contract.” | ||
| With the requirement of a one day availability of KEY staff with applicable clearances, is the Government planning to provide the SCI and Poly services for all new Technicians? | All contractor personnel performing on a task order shall meet the security clearance and classification requirements prior to the performance of any task orders requiring cleared personnel. The government will consider sponsorship for other personnel as necessary. | |
| Will the Government be providing a per site BOM for offerors review and pricing prior to the Proposal due date? | This site specific information will be provided at the time of task order solicitation as needed. | |
| It appears the Solicitation was published a week after the documents were prepared. Is the Government planning on granting a one week extension? | Please see Amendment 1 which updates the submission deadline to November 20th. | |
| Can Microsoft SQL Server experience be substituted for Microsoft Access? Is there an application being used that requires Access experience? If so, is knowledge of Access programming required? | Yes, this is an acceptable substitute. | |
| Are alternate technical degrees such as Computer Science or Electrical Engineering acceptable? | The requirements are as stated in PWS Attachment #1 Labor Qualifications. | |
| PWS Attachment I - Labor Qualifications - Does “current” mean at the time of contract award? | Yes, current does mean at the time of contract award. | |
| There are several pieces of equipment that are discontinued (i.e. P5624-E, SNC-VM631 and DVC-EX-C-A00-04-2T). What are the replacement part numbers for these items? | These items are still the Government's requirement and replacement part numbers are not available. | |
| There are several pieces of equipment that are made in China and are not TAA Compliant (CNGE26FX2TX24MSPOE1, T8134, T8129, C431 and VX2457-MHD). What are the TAA Compliant replacement part numbers for these items? | Some components within the items are made in China, however the models are not manufactured in China and have been approved by accrediting authority as compliant and approved for usage in the installations. | |
| This section states, “The offeror shall complete a “Past Performance Information Form” (ATTACHMENT IX) for each reference submitted.” Please confirm that this should be Attachment II. | Please see Amendment 1 where Section L has been revised to read: "The offeror shall complete a “Past Performance Information Form” (ATTACHMENT II) for each reference submitted. | |
| This section states, “…offerors shall contact their past performance references and request that each reference complete the Past Performance Report Form, Attachment X to the solicitation…” Please confirm that this should be Attachment III. | Please see Amendment 1 where Section L has been revised to read: "In addition to the information requested above, offerors shall contact their past performance references and request |
that each reference complete the Past Performance Report Form, Attachment III to the solicitation, and e-mail the completed survey form directly to Chelsey Crawford at chelsey.crawford@navy.mil by the DUE DATE OF THIS
SOLICITATION."
| The numbering in this section goes from 4.2.1 to 4.1.2. Will the government please correct the numbering in this section? | Please see Amendment I which corrects the number error |
| This section states, “Completed Attachment VIII – Pricing Spreadsheet” Please confirm that this should be Attachment I. | Please see Amendment 1 where Section L has been revised to read: "Completed Attachment I – Pricing Spreadsheet" |
| The total Man-Hours as provided in the table in PWS 4.0 Key Personnel appear to be significantly different from the Hours columns in the Attachment 1 Pricing spreadsheet. | Please see the revised Attachment I - Pricing Spreadsheet included as a part of Amendment I |
| Would the Government please let us know why there is a difference in hours between these two tables? | Please see the revised Attachment I - Pricing Spreadsheet included as a part of Amendment I |
| Would the Government please provide specifications for the 10 Power Edge 740 Lenel Servers (i.e. processor, RAM, drives, warranty, etc.)? | DELL Edge 740: INTEL® XEON® SILVER 4108 (8C/16T, 1.8GHZ, 11MB CACHE - 9.6GT/S); 120/220V 750W redundant power supply; 16GB - RDIMM - 2666MHz [2x8GB RDIMMS]; DVD+/-RW Drive; 1x8 backplane for 2.5-inch hard drives; (2) M.2 240GB OS drives (RAID 1); (5) 300GB 15K RPM SAS 12Gbps 2.5in hot plug hard drives (RAID 5); PERC H740 integrated RAID controller - 1GB cache; iDRAC9 Enterprise; Broadcom 5720 QP 1Gb network daughter card and contain the following software: |
a. MS Windows 2019 Server Standard edition, or later
b. MS SQL 2019 Server, or later
c. Lenel OnGuard® 7.6, or later
d. Any other software that may be deemed crucial for proper operation of the system
Would the Government please provide specifications for the 20 Precision T5820 Lenel Client PCs(i.e. processor, RAM, drives, warranty, etc.)? DELL Precision T5820: INTEL® XEON® W-2123 CPU (4C, HT, 3.6 GHZ TURBO, 5.5M); 16GB (2X8GB) 2666MHZ; DDR4 RDIMM-ECC; 685W power supply; 16X DVD+/-RW; 512GB 2.5" Serial ATA solid-state drive; AMD WX 9100 Video Card; Intel AHCI chipset SATA controller (8x6.0Gb/s) - SW RAID 0/1/5/10; C3 SATA/SSD 2.5"1-2 HD; RJ45 Ethernet port; internal chassis speakers; (6) USB 2.0 ports; (4) USB 3.0 ports; (1) serial port; USB keyboard/mouse; and, contain the following software:
a. DoD Secure Host Baseline (SHB) Windows 10 build 10.7, or later
b. Lenel OnGuard® 7.6, or later
c. Milestone XProtect® Professional+ smart client
d. Microsoft Office 2016 or later
e. Any other software that may be deemed crucial for proper operation of the system
Will the contractor be required to safeguard SCI material at the contractor location? No, there will be no work requiring the safeguarding of SCI material at the vendor's facility, but vendor's are required to have the requisite facility clearance as defined in the DD 254.