PM_and_Repair_TDL_Template.docx

DOCX document 26 KB Posted

Attached to
Oil Spill Response (OSR) Boats and Trailers Preventive Maintenance (PM) and Repair Services
Solicitation number
N0018918QG118
Issued by

View the file

Other files

File Type Posted
PPI_Forms_and_TDL_Templates.docx DOCX document
TDL_Log.xlsx XLSX spreadsheet
N0018918QG118.docx DOCX document
Pricing_Spreadsheet.xlsx XLSX spreadsheet
Attachment_3-_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Attachment_6_-_TDL_Log.xlsx XLSX spreadsheet
PPI_PPI_Report_Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No. N00189-18-P-XXXX

PM TDL #

Mr./Ms. <Insert Contractor Point of Contact> <Insert Contractor Name> <Insert Contractor Street Address> <Insert Contractor City, State, Zip Code>

Dear Mr./Ms. <Insert Name>:

Pursuant to Contract N00189-18-P-XXXX, NAVSUP Clause SUPTXT 5252.242-9402, entitled Technical Direction (Jan 1992), NAVSUPINST 4205.3E, Naval Station Newport, Port Operations hereby issues the following:

Preventative Maintenance Technical Direction Letter<Insert No.>, Contract Task Order No. <Insert No.> for preventative maintenance of Oil Spill Response (OSR) boats and trailers. Each PM TDL issued hereunder is subject to the terms and conditions of this contract. The boat identification numbers for boats covered by this contract and PM TDL are:

a. 21UB0401
b. 28OP0404
c. 30BP0004
d. 25UB1602

a. This technical PM TDL shall become effective upon acceptance by <Insert Contractor Name> as set forth on the final page of this document. The product shall be delivered by the Days After TDL listed in the contract. Transportation cost that was established at time of award shall be included in the PM TDL total cost.

b. The contractor shall perform the following task issued under the following Performance Work Statement (PWS) paragraph(s): <Insert applicable CLIN, PWS paragraph(s), description, and Days After TDL in accordance with the contract.

CLIN
PWS Task
Description
Days After TDL

c. The period of performance for this technical direction letter shall be from the effective date of this technical direction through <Insert date>. Only efforts to accomplish this technical direction and incurred during this period of performance shall be reimbursed hereunder.

d. Location of performance for this PM TDL shall be at <Insert location>.

e. Estimated Cost/Level of Effort: <Note: Insert applicable information from the following tables, depending on contract type:

CLIN
PM TDL# Amount
Funded
Remaining
Cumulative

CLIN 0001

CLIN 0002

Total

f. The cost of performance of this technical direction shall not exceed $<Insert amount>, including all labor, material and support.

g. The following line of accounting data is applicable to this technical direction:

<Insert line of accounting>

Should the contractor believe that (i) this technical direction is outside the contractual requirements set forth in the PWS of subject contract and/or (ii) it will be unable to perform the technical direction within the above cited not-to-exceed amount and/or period of performance, it shall not proceed with this technical direction but shall, not later than <Insert no.> days from the date of this letter, notify the undersigned in writing. Such written notification shall specify reason(s) for such belief.

If during the course of performance of this technical direction, the contractor becomes aware that complete performance of this technical direction will not be accomplished within the above cited not-to-exceed amount and/or period of performance, the contractor shall immediately notify the undersigned in writing. This notification shall include an estimate of the revised total amount to complete the technical direction and/or the revised period of performance. In any event, the Government shall not be liable to reimburse the contractor for any amount over the above cited not-to-exceed amount unless and until <Insert contracting officer name has authorized, in writing, the additional expenditure.

The contractor is required to indicate his acceptance of this technical direction as set forth above by having an authorized company official sign in the space provided below and returning a duly executed copy to the Contracting Officer’s Representative, with a copy to the Contracting Officer at the following addresses:

Contracting Officer Representative (COR)

Clifford Unruh CNRMA Port Ops SUBASE New London 860-694-3756

Contracting Officer

Joel Dimaapi NAVSUP Fleet Logistics Center Norfolk Groton Office Code 245.2 Box 500, Bldg 84/2 Groton, CT 06349 860-694-2805

ACCEPTED

Contractor:____________________________________________________________
NameSignatureDate
COR:____________________________________________________________
NameSignatureDate
Contracting Officer:____________________________________________________________
NameSignatureDate

Contract No. N00189-18-P-XXXX

Repair TDL #

Mr./Ms. <Insert Contractor Point of Contact> <Insert Contractor Name> <Insert Contractor Street Address> <Insert Contractor City, State, Zip Code>

Dear Mr./Ms. <Insert Name>:

Pursuant to Contract N00189-18-P-XXXX, NAVSUP Clause SUPTXT 5252.242-9402, entitled Technical Direction (Jan 1992), NAVSUPINST 4205.3E, Naval Station Newport, Port Operations hereby issues the following:

Repair Technical Direction Letter<Insert No.>, Contract Task Order No. <Insert No.> for repairs of Oil Spill Response (OSR) boats and trailers. Each Repair TDL issued hereunder is subject to the terms and conditions of this contract. The boat identification numbers for boats covered by this contract and PM TDL are:

a. 21UB0401
b. 28OP0404
c. 30BP0004
d. 25UB1602

a. This Repair TDL shall become effective upon acceptance by <Insert Contractor Name> as set forth on the final page of this document. The product shall be delivered by the Days After TDL listed in the contract. Transportation cost that was established at time of award shall be included in the PM TDL total cost.

b. The contractor shall perform the following task issued under the following Performance Work Statement (PWS) paragraph(s): <Insert applicable CLIN, PWS paragraph(s), description, and Days After TDL in accordance with the contract.

CLIN
PWS Task
Description
Days After TDL

c. The period of performance for this technical direction letter shall be from the effective date of this technical direction through <Insert date>. Only efforts to accomplish this technical direction and incurred during this period of performance shall be reimbursed hereunder.

d. Location of performance for this Repair TDL shall be at <Insert location>.

e. Estimated Cost/Level of Effort: <Note: Insert applicable information from the following tables, depending on contract type:

Repair TDL#
Amount
Funded
Remaining
Cumulative

Total

|_| Market research was conducted resulting in the following:

In accordance with the definition presented in the Federal Acquisition Regulation (FAR) Part 2 for commercial item, it was determined that the parts/materials listed above is a type that is customarily used by non-governmental entities for purposed other than governmental, and has been offered for sale and sold to the general public.

The COR received the Repair TDL along with the required parts and materials listed for the associated repairs. The COR conducted market research of the commercial marketplace, historical data and published catalogs to determine the quoted parts and materials as fair and reasonable.

I have determined the prices to be fair and reasonable based upon:

See summary of invoice received for repairs. The PCO has determined the contractor’s total quoted price for labor, parts and material as fair and reasonable based upon the price analysis below:

|_| Commercial Catalog or Published Price List Manufacturer/vendor name:

Catalog/List title or number: Effective date(s):

Page number(s):

|_| Established Market Price or Prices Set by Law/Regulation The quoted price is the same as the established market price or the prices set by law or regulation as verified by:

|_| Historical Comparison for the same or similar items:

Prior Contractor:

Invoice Number No: Date Purchased:

Quantity and Unit of Issue:

Unit Price Previously Paid:

Basis for determining prior price reasonable:

If the item(s) are not identical, explain why the comparison is considered valid:

|_| Other Price Analysis or Comments: In an effort to further determine the total quoted price as fair and reasonable, the COR conducted market research to identify publically available pricing of the same or similar types of parts and materials. The table below shows the quoted unit price for each required part/material compared to the same or similar type parts/materilas identified during market research. See table below for results:

CLIN
Quoted Unit Price
Attachment 1
Attachment 2

Based upon the price analysis techniques utilized above, the COR has determined the contractor’s total quoted price as fair and reasonable.

f. The cost of performance of this technical direction shall not exceed $<Insert amount>, including all labor, material and support.

g. The following line of accounting data is applicable to this technical direction:

<Insert line of accounting>

Should the contractor believe that (i) this technical direction is outside the contractual requirements set forth in the PWS of subject contract and/or (ii) it will be unable to perform the technical direction within the above cited not-to-exceed amount and/or period of performance, it shall not proceed with this technical direction but shall, not later than <Insert no.> days from the date of this letter, notify the undersigned in writing. Such written notification shall specify reason(s) for such belief.

If during the course of performance of this technical direction, the contractor becomes aware that complete performance of this technical direction will not be accomplished within the above cited not-to-exceed amount and/or period of performance, the contractor shall immediately notify the undersigned in writing. This notification shall include an estimate of the revised total amount to complete the technical direction and/or the revised period of performance. In any event, the Government shall not be liable to reimburse the contractor for any amount over the above cited not-to-exceed amount unless and until <Insert contracting officer name> has authorized, in writing, the additional expenditure.

The contractor is required to indicate his acceptance of this technical direction as set forth above by having an authorized company official sign in the space provided below and returning a duly executed copy to the Contracting Officer’s Representative, with a copy to the Contracting Officer at the following addresses:

Contracting Officer Representative (COR)

Clifford Unruh CNRMA Port Ops SUBASE New London 860-694-3756

Contracting Officer

Joel Dimaapi NAVSUP Fleet Logistics Center Norfolk Groton Office Code 245.2 Box 500, Bldg 84/2 Groton, CT 06349 860-694-2805

ACCEPTED

Contractor:____________________________________________________________
NameSignatureDate
COR:____________________________________________________________
NameSignatureDate

For repairs greater than $2500.00

Contracting Officer:____________________________________________________________
NameSignatureDate

File details come from the government source that posted it.