N0018918QG118.docx
DOCX document 173 KB Posted
- Attached to
- Oil Spill Response (OSR) Boats and Trailers Preventive Maintenance (PM) and Repair Services
- Solicitation number
- N0018918QG118
About this file
N0018918QG118.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PPI_Forms_and_TDL_Templates.docx | DOCX document | |
| TDL_Log.xlsx | XLSX spreadsheet | |
| Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| PM_and_Repair_TDL_Template.docx | DOCX document | |
| Attachment_3-_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment_6_-_TDL_Log.xlsx | XLSX spreadsheet | |
| PPI_PPI_Report_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0018918QG118
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Preventive Maintenance
FFP
Base Year - Preventive Maintenance of Oil Spill Response Boats and associated Trailers, in accordance with the Performance Work Statement (PWS) incorporated herein.
FOB: Destination
MILSTRIP: N3241118RC004FN
PURCHASE REQUEST NUMBER: N3241118RC004FN
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 16,500 |
| Lot |
Repairs
Base Year -The Vendor shall perform Repairs in accordance with the Performance Work Statement (PWS) incorporated herein.
FOB: Destination
MILSTRIP: N3241118RC004FN
PURCHASE REQUEST NUMBER: N3241118RC004FN
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| OPTION |
| Preventive Maintenance |
Option Year 1 - Preventive Maintenance of Oil Spill Response Boats and associated Trailers, in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 16,995 |
| Lot |
| OPTION |
| Repairs |
Option Year 1 - The Vendor shall perform Repairs in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| OPTION |
| Preventive Maintenance |
Option Year 2 - Preventive Maintenance of Oil Spill Response Boats and associated Trailers, in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 17,505 |
| Lot |
| OPTION |
| Repairs |
Option Year 2 - The Vendor shall perform Repairs in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| OPTION |
| Preventive Maintenance |
Option Year 3 - Preventive Maintenance of Oil Spill Response Boats and associated Trailers, in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18,030 |
| Lot |
| OPTION |
| Repairs |
Option Year 3 - The Vendor shall perform Repairs in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| OPTION |
| Preventive Maintenance |
Option Year 4 - Preventive Maintenance of Oil Spill Response Boats and associated Trailers, in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18,570 |
| Lot |
| OPTION |
| Repairs |
Option Year 4 - The Vendor shall perform Repairs in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| OPTION |
| Preventive Maintenance |
FAR 52.217-8 - Preventive Maintenance of Oil Spill Response Boats and associated Trailers, in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 9,285 |
| Lot |
| OPTION |
| Repairs |
FAR 52.217-8 -The Vendor shall perform Repairs in accordance with the Performance Work Statement (PWS) incorporated herein.
MAX
PERFORMANCE WORK STATEMENT
Oil Spill Response (OSR) Boat Maintenance and Repair Naval Station Newport, RI
N3241118RC004FN
1.0. INTRODUCTION
1.1 Naval Station Newport is the Navy’s premier site for training Officers, Officer Candidates, Senior Enlisted personnel and Midshipman Candidates, as well as testing and evaluating Advanced Undersea Warfare and Development Systems. It is home to fifty (50) Navy, Marine Corps, Coast Guard and US Army Reserve commands and activities.
1.2 The mission of Naval Station Newport is to fulfill the diverse requirements of its tenant commands by providing the facilities and infrastructure that are essential to their optimum performance. Its vision is to be a world-class Center of Learning Excellence with the capacity to support the Navy’s mission by providing warfighters with education, training, Research, Development, Training and Evaluation (RDT&E) and deployment capability to meet today’s demands and exceed tomorrow’s expectations.
2.0 BACKGROUND
2.1 Naval Station Newport, RI operates a spill response team and routinely conducts simulation exercises of marine diesel spills for effective and efficient action in the event of a real-world incident. The Command requires Preventive Maintenance (PM) and repairs of non-functioning equipment of four (4) Oil Spill Response (OSR) Boats and associated trailers.
3.0 SCOPE OF WORK
3.1 Preventative maintenance and repairs required under resultant contract shall be performed off-site; unless, repairs are minor and can be performed on-site without interference with base operations. If the maintenance/repair necessitates that a boat be transported off-site, it will be the vendor’s responsibility to load the boat on the trailer, provide transportation to its facility, and provide secure inside and/or on-site storage of the boat (and trailer) while in the vendor’s possession. Once repairs are complete, the vendor shall coordinate with the Contracting Officer Representative (COR) and Technical Assistant (TA), a date and time to return the boat. The boat shall be returned to its original location, which may require re-launching of the boat.
3.2 Service shall include all periodic manufacturer required maintenance to ensure that boats are in operational order at all times. Boats shall be maintained for 100% performance and usability. This includes but is not limited to: All Marine Safety Equipment, Lights, Bilge Pumps, Instruments and Gauges, Switches, Electrical Wiring, Raw Water Systems, Electronic and Electrical systems, Outboard and Inboard Engines and Zincs.
3.3 Small tasks such as electronic calibration can be done on-site. Oil change, anti-freeze change, painting, sanding, other work involving hazardous materials and/or environmental concerns, and/or other large maintenance work shall be performed at vendor’s facility.
3.4 Vendor shall perform maintenance and repair work off site. Vendor facility shall be within 50 miles driving radius of Naval Station Newport, RI.
3.5 The vendor shall provide certified technicians to perform repairs and preventative maintenance of OSR boats and associated trailers. In addition, the vendor shall provide secure on-site/ off-site storage for OSR boats and trailers while it is in the vendor's possession. When certified technicians are replaced with new hired technician, the new technician certifications shall be provided to the Contracting Officer Representative (COR).
3.6 The COR or TPOC will notify the vendor via phone, fax or email for all preventative maintenance & repairs. The vendor shall respond to all service requests no later than the next business day. The vendor shall provide a written itemized quote that includes an estimated period of performance that is consistent with industry standards. If the industry standard cannot be met the vendor shall provide written justification and the adjusted period of performance time line.
3.7 Vendor shall contact the COR or TA within one business day of receipt of request for scheduled preventive maintenance. The vendor shall coordinate the date & time for scheduled preventive maintenance with the COR to accommodate priority and volume of work issues.
3.8 When the need for additional work is identified, the vendor shall provide a written itemized quote that includes the period of time, repair parts, and consumable supplies needed to perform the work. No more than 5% markup shall be incurred for major repair parts and consumable supplies required. Upon request, the vendor shall retain replaced part(s) and provide them to the government.
3.9 Incidental repair parts and consumable supplies in support of the Preventive Maintenance Schedule indicated in section six (Performance Objectives) shall be provided by the vendor at no additional cost to the government.
3.10 The vendor shall submit a complete electronic report of the preventative maintenance and/or repairs to the COR and Technical Assistant (TA) within three (3) business days after the maintenance or repair service is accomplished. All reports shall include details of all actions taken and measurement parameters completed as part of the inspection/repair, including but not limited to proper functioning of the equipment by certified vendor’s technicians and government operators.
3.11 If necessary repair work is required (for equipment, engines and/or hull of the boat and/or Trailers) at any point during the inspection and preventive maintenance process, the vendor shall immediately prepare a detailed quote and submit it to the COR for approval. The quote shall include the nature of the repair, parts and materials, to include part numbers, fixed number of hours, unit price, extended price and total fixed price for the repair. The vendor shall not initiate the repair without prior written authorization from the COR.
4.0 BOAT AND TRAILER CHARACTERISTICS AND IDENTIFICATION
4.1 Sea Ark Utility Boat (Quantity: 1 each):
A. Aluminum Hull B. Major Equipment
| 1. One EZ Loaders, 2 Axels |
| 2. One 150 Honda Engines with 4 x 14-1/4 x 17 stainless steel Propeller |
4.2 Sea Ark Platform Boat (Quantity: 1 each):
A. Aluminum Hull B. Major Equipment
| 1. One EZ loader trailer, 3 Axels |
| 2. Twin 150 Honda Outboard Engines with stainless steel, 3 X 14½ X 15 props. |
4.3 Kvichak Skimmer (Quantity: 1 each):
A. Aluminum Hull B. Major Equipment
| 1. One EZ loader trailer, 3 Axels |
| 2. Inboard 130HP Volvo Diesel |
4.4 Metal Shark Utility Boat (Quantity: 1 each):
| A. One Boat Master, 2 Axels |
| B. Twin 115 Honda Outboard Engines with stainless steel, 3 X 141/4X 17 props. |
4.5 OSR Boat Identification Numbers for OSR Boats (and Associated Trailers):
| Hull Number | Manufacturer | Engine Type . | |
| 21UB0401 | Sea Ark | 150HP Honda (outboard, 4-cylinder; 4-stroke) | |
| 28OP0404 | Kvichak Skimmer 130HP Volvo Diesel (inboard, 4-cylinder; 4-stroke) | ||
| 30BP0004 | Sea Ark | Twin 150 HP Honda (outboard, 4-cylinder; 4-stroke) | |
| 25UB1602 | Metal Shark Twin 115 HP Honda (outboard, 4-cylinder; 4-stroke) |
| Boat Name | Hull No. | Model No. | |
| Metal 01 | 25UB1602 Model 25 Feet – Utility Boat | ||
| Sea Ark 2 | 21UB0401 Model 21 Feet - UT Roustabout | ||
| Skimmer | 28OP0404 Model 28 Feet - Rapid Response | ||
| Platform | 30BP0004 Model 3010-B – Transporter |
5.0 PERFORMANCE OBJECTIVES:
Contractor shall perform all Preventive Maintenance (PM) at the following intervals:
5.1 TRAILERS – IAW Boat Trailer OEM
5.1.1 Every 6 Months
| 5.1.1.1 | Check bearing spindle for warmness after use (slightly warm to touch) |
| 5.1.1.2 | Trailer - inspect all light operation. |
| 5.1.1.3 | Break System Actuator - Visually inspect, check for leaks and correct fluid level, grease surge brake unit. |
| 5.1.1.4 | Frame Assembly - Visually inspect all welds for cracks, leaf springs condition and corrosion. |
| 5.1.1.5 | Check trailer jack stand for proper operation and grease gears. |
| 5.1.1.6 | Check Caliper & Rotor/Drum assemblies for leaks and malfunction, bolts tightness and condition. |
| 5.1.1.7 | Pads - Visually inspect condition and wear. |
| 5.1.1.8 | Bunk Assembly - Visually inspect fasteners for tightness and carpet condition. |
| 5.1.1.9 | Winch Cable Assembly - Visually inspect strap/wire/hook for frays and excessive corrosion and check winch operation and corrosion. |
| 5.1.1.10 | Wheels, Hubs & Bearings - Visually inspect lug nuts for tightness, rims for damage, and tire wear (including spare tire). |
| 5.1.1.11 | Lights - Check operation and condition of fasteners, inspect electrical connector plug. |
| 5.1.1.12 | Make report of all findings. |
| 5.1.2 | Every 12 Months |
| 5.1.2.1 | All items listed above in the "Every 6 Months" categories plus: |
| 5.1.2.2 | Break System Actuator - Check for brake line corrosion and leaks. |
| 5.1.2.3 | Frame Assembly - Inspect for deterioration and all fasteners for tightness and corrosion. |
| 5.1.2.4 | Bunk Assembly - Inspect for deterioration of the wood. |
| 5.1.2.5 | Hubs & Bearings -Check bearing and hub condition and repack hubs with grease. |
| 5.2 | HULL PRESERVATION |
| Hull preservation and repairs shall be IAW the following references: |
| a. FY17 NAVSEA Standard Items |
| b. S9086-VG-STM-010/CH-634, Naval Ship’s Technical Manual, Chapter 634, Deck Covering |
| c. S9086-VG-STM-020/CH-631, Volume 2, Preservation of Ships in Service |
| d. SWT 077-01 Hazardous Waste Produced on Naval Vessels Control |
Craft availability will be based on operational requirements of craft and Port Operations commitments. Vendor shall paint one (1) craft per year. The vendor shall paint each boat in accordance with industry standards and any applicable environmental regulations including but not limited to OSHA. All painting shall be performed off-site in order to avoid any potential environmental spills. Painting shall include but not be limited to hulls, deck, and wheel house IAW manuals described above.
The vendor shall notify the COR/TPOC prior to all scans, specific repairs identified and preservation. The vendor shall be responsible of replacement of damaged equipment due to excessive blasting. During inspection of zincs, vendor shall prepare and submit a report to the COR/ TPOC as to the percentage of effective zinc material remaining prior to removal. When checking resistance readings, vendor shall list the normal range and the found values if out of normal specifications, and shall describe in the report what was done to correct the discrepancy.
5.2.1 Dry Dock, Clean, Underwater Hull Painting-Antifouling
| 5.2.1.1 | Immediately after dry-docking, pressure wash clean the entire hull (above and below the waterline), including sides, bow, stern and marine deck, limit free of all marine growth, using fresh water. |
| 5.2.1.2 | Record all markings in exact locations to reinstall all markings after painting of Hull. Cover any items that cannot be removed to prevent getting paint on them. |
| 5.2.1.3 | Scaffold and shrink wrap (protect rest of boat from blasting and painting debris) each craft as needed to meet environmental requirements. |
| 5.2.1.4 | Contractor shall ensure each openings to below deck areas (not open for inspection), in and around console control, gages, cabin seat(s) and electrical panels and systems are masked and properly sealed to protect these areas from intrusion of sand blasting/industrial debris material. |
| 5.2.1.5 | Contractor shall ensure all through hull openings and depth finder transponders are covered prior to blasting and painting. |
| 5.2.1.6 | Contractor shall be responsible for cleaning all industrial debris from craft, to include removing access covers for thoroughness. |
| 5.2.1.7 | Remove and replace with new cathode protection or zinc anodes. |
| 5.2.1.8 | Accomplish light brush-off blast cleaning sweep (using black walnut shells, to rough up surface), preserve and apply antifouling to the entire underwater hull surfaces. The final anti-fouling coat shall be Seaguard Antifouling Paint N51B301. Reference A, Item 009-32, including Table One, Line 9. |
| 5.2.1.9 | Reposition craft supporting blocks to ensure 100 percent coverage of primer and anti-fouling paint on entire underwater hull. |
| 5.2.1.10 | Install markings recorded in 2.1.2 |
| 5.2.1.11 | Remove protective material used in 2.1.2 - 2.1.5. |
| 5.2.1.12 | Install new cathode protection or zinc anodes removed in 2.1.7. |
5.2.2 Hull Inspection
| 5.2.2.1 | Conduct inspection of the craft bilges, exterior and accessible interior hull for damage and deteriorated conditions of each weld and hull plate surface and make report. |
| 5.2.2.2 | Check for bent fender channeling, cracked welds, transom cracks, corroded fender channeling and make report. |
| 5.2.2.3 | Inspect windows and hardware for damage and make report. |
5.2.3 Non-Skid
| 5.2.3.1 | Remove existing and install new non-skid decking material on all waking interior and exterior decking. Ensure non-skid deck covering is a NAVSEA approved proprietary system conforming to MIL-PRF-24667, Type One, 2 or 3 Comp G. Color shall be FED-STD-595/36118 Gray, Flat or Lusterless. |
| 5.2.3.2 | Install temporary coverings for all doors, hatches, void covers, and various equipment that will be affected during the application of non-skid on deck. |
| 5.2.3.3 | Non-skid scheme shall be applied as identified by designated government representative, from side to side and from end to end. NOTE: There shall be a four (4) inch by eight (8) inch border around all cleats and /or tow posts. Cross rolling of welds shall be accomplished in accordance with Reference B, paragraph NSTM 634-3.29.9 subparagraph 4 of 2.2. |
| 5.2.3.4 | Remove all temporary coverings upon completion of hull preservation. |
5.3. NAVIGATION SYSTEM
Inspect IAW associated manufacturer’s technical publications Owner’s Guide and/or Operator’s Manual for the following:
5.3.1 VHF Radio
| 5.3.1.1 | VHF Marine Radio. Microphone and Associated Antenna - Check operation, fraying of wires, loose connections and corrosion. |
| 5.3.1.2 | Make report of findings. |
5.3.2 GPS
| 5.3.2.1 | GPS and Associated Antenna - Check operation, fraying of wires, loose connections and corrosion. |
| 5.3.2.2 | Make report of findings. |
5.3.3 MAGNETIC COMPASS
| 5.3.3.1 | Magnetic Compass - Check operation and cleanliness. |
| 5.3.3.2 | Make report of findings. |
5.4 HYDRAULIC STERRING
| 5.4.1 | Every 6 Months |
| IAW Teleflex, Sea Star Installation and Owner’s Manual |
| 5.4.1.1 | Inspect steering wheel for cracks, looseness, or any other deformities. |
| 5.4.1.2 | Inspect helm pump assembly for leaks or loose hydraulic lines. |
| 5.4.1.3 | Inspect steering hoses for kinks, abrasions, cuts, or any other deformities. |
| 5.4.1.4 | Ensure Helm reservoir fluid level is recommended oil level. |
| 5.4.1.5 | Inspect the steering cylinders and all other steering components for damage, wear & loose fasteners. |
| 5.4.1.6 | Turn the wheel in both directions several times to insure smoothed operation. |
| 5.4.1.7 | Make report of all findings. |
| 5.5 | FIRE SUPPRESSION |
| 5.5.1 | Fire Extinguishers – Annually |
| IAW Inspection, Maintenance and Recharge Service manual and Manufacturer Instructions |
| 5.5.1.1 | Verify it is located in designated place with no access or visible obstructions. |
| 5.5.1.2 | Check to make sure that the instructions and nameplate is securely fastened and legible. |
| 5.5.1.3 | Check safety seals and tamper indicators are not broken or missing. |
| 5.5.1.4 | Clean extinguisher to remove dirt, grease or foreign material. |
| 5.5.1.5 | Check for physical damage, corrosion, abrasions, dents, weld damage, leakage or clogged nozzle. |
| 5.5.1.6 | Visually inspect pressure gauge reading are in the proper range or position. |
| 5.5.1.7 | Check fullness by weighing bottle. |
| 5.5.1.8 | Check date of manufacture (Cylinder must be hydrostatically tested every 5 years). |
| 5.5.1.9 | Visually inspect the base/foot stand. |
| 5.5.1.10 | Check ring pin for freedom of movement. |
| 5.5.1.11 | Inspect discharge lever for dirt or corrosion. |
| 5.5.1.12 | Inspect and clean hose assembly. |
| 5.5.1.13 | Install new tamper seal and record data on the inspection tag. |
| 5.5.1.14 | Make report of all findings. |
| 5.6 | INTERIOR CABIN INSPECTION |
| IAW OEM Manual/Instructions |
5.6.1 Every 6 Months
| 5.6.1.1 | Inspect Seat(s) for foundation fasteners are secured and physical condition. |
| 5.6.1.2 | Aft Door (Canvas) -secured and in good condition. |
| 5.6.1.3 | Instrument gauges operation and light illumination. |
| 5.6.1.4 | Inspect wiper blade and motor operation and condition |
| 5.6.1.5 | Inspect Main Electrical Switch Board for connections, corrosion and conduct operation. |
| 5.6.1.6 | Horn- check condition and conduct operational test. |
| 5.6.1.7 | Make report of all findings. |
| 5.7 | ELECTRICAL SYSTEMS |
| IAW associated manufacturer’s technical publications and operator’s manual for the following: |
5.7.1 Batteries – Every 6 Months
| 5.7.1.1 | Battery - Clean battery posts and apply light coat of grease to cable ends. |
| 5.7.1.2 | Battery Selector Switch - Clean battery posts and apply light coat of grease to cable ends. |
| 5.7.1.3 | Clean battery compartment/box. |
| 5.7.1.4 | Inspect battery mounting brackets and securing devices for damage & corrosion. |
| 5.7.1.5 | Test run engines and house electrical/electronic components. |
| 5.7.2 | Vessel Lighting – Every 6 Months |
| IAW OEM Manual |
| 5.7.2.1 | Interior Overhead Cabin Lights - Check operation and clean unit. |
| 5.7.2.2 | Flood Lights - Check operation and clean unit. |
| 5.7.2.3 | Search Light - Check operation and clean unit. |
| 5.7.2.4 | Make report of all findings. |
| 5.7.3 | Navigation Lights – Every 6 Months |
| 5.7.3.1 | Remove light cover check bulbs and inspect light contacts for corrosion; clean. |
| 5.7.3.2 | Apply light coat of electrical silicone grease to bulb contact points. |
| 5.7.3.3 | Reassemble all lights. |
| 5.7.3.4 | Conduct operational test. |
| 5.7.3.5 | Make report of all findings. |
| 5.8 | HONDA ENGINE AND PROPULSION MAINTENANCE |
| IAW Honda Service Manual/Instructions |
5.8.1 Every 200 Hours for Honda Single Outboard
| 5.8.1.1 | Fuel Filter (Low Pressure)- Check for water contamination. |
| 5.8.1.2 | Lubricate Engine IAW Honda Service Manual |
| 5.8.1.3 | Cooling Water Passages - Check / Clean, flush with fresh water |
| 5.8.1.4 | Power Trim Tilt - Check for leaks, operation from local and remote stations. |
| 5.8.1.5 | Gear Case Oil - Check / Change gear oil and drain seals, Inspect for water contamination. |
| 5.8.1.6 | Engine Oil Filter - Check / Replace |
| 5.8.1.7 | Engine Oil - Check / Change |
| 5.8.1.8 | Timing Belt - (Check / Adjust) |
| 5.8.1.9 | ACG Belt - (Check / Adjust) |
| 5.8.1.10 | Thermostat Cover - Check for leaks around housing area. |
| 5.8.1.11 | Propeller and fasteners - check condition of cotter pin and propeller blades and prop fastener. |
| 5.8.1.12 | Engine External Zinc- Check for erosion (Note condition of zinc). |
| 5.8.1.13 | Water Pump - Check for water discharge |
| 5.8.1.14 | Throttle linkage - Check and adjust. |
| 5.8.1.15 | Crankcase Breather Tube - Check |
| 5.8.1.16 | Make report of all findings. |
5.8.2 Every 200 Hours for Honda Twin Outboards
| 5.8.2.1 | Fuel Filter (Low Pressure)- Check for water contamination. |
| 5.8.2.2 | Lubricate Engine IAW Honda Service Manual |
| 5.8.2.3 | Cooling Water Passages - Check / Clean, flush with fresh water |
| 5.8.2.4 | Power Trim Tilt - Check for leaks, operation from local and remote stations. |
| 5.8.2.5 | Gear Case Oil - Check / Change gear oil and drain seals, Inspect for water contamination. |
| 5.8.2.6 | Engine Oil Filter - Check / Replace |
| 5.8.2.7 | Engine Oil - Check / Change |
| 5.8.2.8 | Timing Belt - (Check / Adjust) |
| 5.8.2.9 | ACG Belt - (Check / Adjust) |
| 5.8.2.10 | Thermostat Cover - Check for leaks around housing area. |
| 5.8.2.11 | Propeller and fasteners - check condition of cotter pin and propeller blades and prop fastener. |
| 5.8.2.12 | Engine External Zinc- Check for erosion (Report condition of zinc). |
| 5.8.2.13 | Water Pump - Check for water discharge |
| 5.8.2.14 | Throttle linkage - Check and adjust. |
| 5.8.2.15 | Crankcase Breather Tube - Check |
| 5.8.2.16 | Make report of all findings. |
5.8.3 Every 400 Hours for Honda Single Outboard
| 5.8.3.1 | All items listed above in the “Every 200 Hours for Honda Single Outboard” category plus: |
| 5.8.3.2 | Spark Plugs - Inspect and report condition. |
| 5.8.3.3 | Anode Metal Exhaust Manifold - Check erosion and make report. |
| 5.8.3.4 | Anode Metal Stern Bracket - Check erosion and make report. |
| 5.8.3.5 | Anode Metal Gear Case - Check erosion and make report. |
| 5.8.3.6 | Fuel Filter (Low Pressure Type) - Check / Replace |
| 5.8.3.7 | Fuel Filter (High Pressure Type) - Check / Replace |
| 5.8.3.8 | Engine Fuel Lines-check for wear/leaks/contamination |
| 5.8.3.9 | Boat Fuel Filter / Water Separators Filter - Check / Replace |
| 5.8.3.10 | Make report of all findings. |
5.8.4 Every 400 Hours for Honda Twin Outboards
| 5.8.4.1 | All items listed above in the "Every 200 Hours for Honda Twin Outboard" category plus: |
| 5.8.4.2 | Spark Plugs - Inspect and report condition. |
| 5.8.4.3 | Anode Metal Exhaust Manifold - Check erosion and make report. |
| 5.8.4.4 | Anode Metal Stern Bracket - Check erosion and make report. |
| 5.8.4.5 | Anode Metal Gear Case - Check erosion and make report. |
| 5.8.4.6 | Fuel Filter (Low Pressure Type) - Check / Replace |
| 5.8.4.7 | Fuel Filter (High Pressure Type) - Check / Replace |
| 5.8.4.8 | Engine Fuel Lines-check for wear/leaks/contamination |
| 5.8.4.9 | Boat Fuel Filter / Water Separators Filter - Check / Replace |
5.8.4.10 Make report of all findings.
5.9 VOLVO ENGINE AND PROPULSION MAINTENANCE
5.9.1 Every 250 Hours for Volvo Diesel Inboard Engine
| 5.9.1.1 | Fuel Filter -Check for leaks. |
| 5.9.1.2 | Air Filter - Check for contaminates. |
| 5.9.1.3 | Engine Coolant - Check for proper level in heat exchanger and reserve tank. |
| 5.9.1.4 | Power Trim Tilt - Check for leaks and for proper operation. |
| 5.9.1.5 | Outdrive Oil - Check / Change, Inspect for water contamination and make reports. |
| 5.9.1.6 | Engine Oil Filter - Check / Replace |
| 5.9.1.7 | Engine Oil - Check / Change |
| 5.9.1.8 | Drive Belts - Check for wear and adjustments. |
| 5.9.1.9 | Thermostat Housing - Check for leaks. |
| 5.9.1.10 | Raw Water Pump - Check for water discharge |
| 5.9.1.11 | Crankcase Breather Tube - Check for proper operation. |
| 5.9.1.12 | Outdrive External Zinc- Check for erosion and make report. |
| 5.9.1.13 | Raw water strainer element - inspect and clean |
| 5.9.1.14 | Inspect outdrive flange and hoses for leakage |
5.9.2 Every 500 Hours for Volvo Diesel Inboard Engine
| 5.9.2.1 | All items listed above in the "Every 250 Hours or 24 Month Volvo Engine" category plus: |
| 5.9.2.2 | Fuel Filter - Check / Replacement |
| 5.9.2.3 | Air Filter - Check / Replacement |
| 5.9.2.4 | Exhaust pipe - Check matting surface between hose and pipe |
| 5.9.2.5 | Raw Water Pump - Inspect/replace impeller |
| 5.9.2.6 | Outdrive - Check universal joint and exhaust bellows |
| 5.9.2.7 | Turbocharger - Check condition and operation |
| 5.9.3 | Annually – Volvo Diesel Inboard Engine |
| IAW OEM Manual/Instructions |
5.9.3.1 Winterize raw water system.
| 5.9.4 | Every Two Years – Volvo Diesel Inboard Engine |
| IAW OEM Manual/Instructions |
| 5.9.4.1 | Change out engine coolant and inspect coolant pump for leakage |
| 5.9.4.2 | Conduct engine valve clearance |
| 5.9.4.3 | Change out engine raw water impeller |
5.10 REPAIRS
Repairs shall be performed as requested by the COR/TPOC: This line item is to repair the Oil Spill Response Boats and Associated Trailers. The Contractor shall respond to all repair requests no later than the next business day (unless the COR/TPOC specifies a greater time frame) after the COR/TPOC requests repairs. Mark up to material costs shall not exceed 5%.
5.11 TRANSPORTATION
5.11.1 If the maintenance/repair necessitates that a boat be transported off-site, it shall be the contractor’s sole responsibility to load the boat on a trailer, provide transportation to their facility and provide inside storage for the boat while it is the contractor's possession. Port Ops may opt to have the boat on a trailer at Port Ops facility in which the contractor will pick up from the facility. Once the repair is complete the boat shall be returned to its original location which may include re-launching the boat. The contractor is solely responsible for obtaining all necessary vehicle passes, stickers and proper ID cards for all contractor employees working on-site at the Base. The contractor shall comply with all Federal, State, Local laws and Federal Regulations as applicable to the performance of the PWS.
5.11.2 Due to security measures, delays may occur during vehicle inspection to obtain Base entry. Additionally, pier access for repairs may require additional inspections and passes. Hours may not be charged for delays due to vehicle breakdown or failure to obtain proper Base ID in advance.
6.0 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)
The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Submarine Base New London Groton, CT via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs).
The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
7.0 See Attachment I (“Quality Assurance and Surveillance Plan (QASP)” and “QASP Matrix”) to this solicitation for details and additional information.
8.0 ADMINISTRATION
8.1 GOVERNMENT POINT OF CONTACT: TBD
8.2 PERIOD OF PERFORMANCE
| Base Period: | 24Sep18 to 23Sep19 |
| Option Year 1: | 24Sep19 to 23Sep20 |
| Option Year 2: | 24Sep20 to 23Sep21 |
| Option Year 3: | 24Sep21 to 23Sep22 |
| Option Year 4: | 24Sep22 to 23Sep23 |
8.3 PLACE OF PERFORMANCE
Naval Station Newport Newport, RI 02421
8.4 METHOD OF PAYMENT
Payment for this contract shall be made via DFAS Electronics Funds Transfer (EFT) utilizing the Wide Area Work Flow (WAWF) System. The contractor is required to register and setup an account in the WAWF System in order to receive payment. The Government reserves the right to change this payment method through other means only by a contract modification if necessary. Payment shall be Monthly in Arrears.
9.0 SECURITY
9.1 Contractor personnel shall comply with all local base/installation security procedures required to gain access to US Government facilities. All contractor equipment, personnel and vehicles are subject to inspection and search by US government security officials (or designated representatives) upon entry to any government owned and/or operated installations and facilities. The Government reserves the right to visit and inspect, the Contractor’s assets/facilities used in support of this requirement.
9.2 Base vehicle passes are required for all contractor employees privately owned vehicles requiring access to Government facilities for the performance of this contract. The methodology for obtaining varies from one installation to another, therefore; the Contractor will coordinate with the Government Technical Point of Contact (GTPOC) to gain access to the base facilities to complete the work assigned under this contract.
9.3 Transition to the Defense Biometric Identification System (DBIDS)
9.3.1 On 17 April 2017, the Navy commenced a transition from the Navy Commercial Access Control System (NCACS) to DBIDS credentialing for contractors, vendors, and suppliers requiring access to Navy Installations in the continental United States, Hawaii, and Guam. This transition is required to comply with various Department of Defense security and base access policies.
9.3.2 NCACS users may visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential. There are no fees incurred by the contractor, vendor, or supplier to obtain a DBIDS credential.
9.3.3 NCACS credentials issued after 17 April 2017 will no longer be accepted without an accompanying DBIDS credential for Navy Installation access. Additional details may be found at the Commander, Navy Installation Command website at https://www.cnic.navy.mil/om/dbids.html .
QASP
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) FOR OIL SPILL RESPONSE (OSR) BOATS - TRAILERS NAVAL STATION NEWPORT, RI
1.0 PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in the resultant contract. The intent is to ensure that the Vendor (otherwise known as Contractor) performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2.0 AUTHORITY
Authority for issuance of this QASP is provided under FAR 52.212-4(a), Inspection/Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in the resultant contract to be accomplished by the Contracting Officer or his duly authorized representative.
3.0 SCOPE
The Vendor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract. The Quality Assurance Surveillance Plan (QASP) is put in place to provide Government surveillance oversight of the Vendor’s quality control efforts to assure that they are timely, effective and is delivering the results specified in the contract. The QASP is not a part of the contract nor is it intended to duplicate the Vendor’s Management Plan. The Government may provide the Vendor an information copy of the QASP as an Attachment to the Request for Quote (RFQ) to support the Vendor’s efforts in developing its plan for maintaining the levels of quality anticipated to be delivered under the terms of the contract.
4.0 RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Vendor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Vendor’s performance.
Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment (will be completed prior to contract award).
5.0 METHOD OF QA SURVEILLANCE
The below listed method of surveillance shall be used in the administration of this QASP. The QASP Matrix describes the method of surveillance that may be used to monitor the services and deliverables to be provided under the contract.
Periodic Inspections on Completion of Workload Tasking – Periodic Inspections will be conducted to ensure compliance with the Performance Work Statement (PWS). The COR will conduct the random monitoring.
6.0 IDENTIFIED QA SURVEILLANCE ITEMS
The PBSC items that have been identified for surveillance are identified in the Performance-Based Matrix.
7.0 DOCUMENTATION
The COR will, in addition to providing documentation, maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function. All such records will be retained for the life of this contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
8.0 ANALYSIS OF CONTRACTOR PERFORMANCE
The analysis of vendor performance shall be conducted at the end of each service period and serves to provide a summary of the Vendor’s performance to the Contracting Officer and the Vendor. Overall performance is important in determining whether to initiate corrective action to bring the Vendor’s work up to the standards of the specification.
9.0 PERFORMANCE EVALUATION MEETINGS
Performance Evaluation Meetings will be scheduled as often as necessary, at the discretion of the Contracting Officer or designated representative. These meetings will be used to resolve minor problems and areas of concern in an effort to avoid disputes and claims. The minutes of these meetings will be recorded by the COR and signed by both the Vendor and Government representatives. The COR will provide a copy of the minutes to the Vendor.
10.0 QASP MATRIX
| Performance Element |
| Performance Requirement |
| Surveillance Method |
| Frequency |
| Acceptable Quality Level |
| Contractor Quality Control Plan |
| QC activities, inspections, and corrective actions completed as required. |
| Inspection by the COR |
| Quarterly for overall QC activities |
As Required for corrective actions.
100% Compliance of the contractor IAW OEM specifications.
| Contract Deliverables |
| Contract deliverables furnished as prescribed in the PWS, attachments, CDRLs, Task Orders, etc., as applicable. |
| File reviews, periodic inspections by the COR observations and customer complaints |
| 100% inspection of all contract deliverables |
| >95% of deliverables submitted timely and without rework required |
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on Contractor Performance
| Assessment by the COR |
| Annual |
| All performance elements rated Satisfactory (or higher) |
| Invoicing |
| Monthly invoices per contract procedures are timely and accurate. |
Review, inspection & acceptance of the invoice by COR/TPOC & CNRMA Port Operations
| Monthly |
| 100% accuracy |
Reports Required IAW PWS
Reports are due to the Government as required IAW PWS
Monthly reports are provided to the government within established timelines. The reports are in a format agreed upon by the vendor and Government.
| Reports are due to the Government within the timeliness defined in the performance based statement of work. |
| >95% accuracy |
Crew Qualifications
Crew will meet all training standards prior to working on contract.
Crew will meet all training standards of the Vendors’ insurer, U.S. Citizen, and industry standard licenses and certifications. Must have a minimum of two years of experience.
>95% accuracy
11. INCENTIVES/DISINCENTIVES
The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/task order may result in the non-exercise of available options.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
| 3001 |
| Destination |
| Government |
| Destination |
| Government |
| 3002 |
| Destination |
| Government |
| Destination |
| Government |
| 4001 |
| Destination |
| Government |
| Destination |
| Government |
| 4002 |
| Destination |
| Government |
| Destination |
| Government |
| 5001 |
| Destination |
| Government |
| Destination |
| Government |
| 5002 |
| Destination |
| Government |
| Destination |
| Government |
| 6001 |
| Destination |
| Government |
| Destination |
| Government |
| 6002 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 1001 |
| POP 24-SEP-2018 TO |
23-SEP-2019
| N/A |
| COMMANDING OFFICER NAVAL STATION NEWPORT |
CLIFF UNRUH
PORT OPERATIONS
NEWPORT RI 02841
860-694-1437
N32411
| 1002 |
| POP 24-SEP-2018 TO |
23-SEP-2019
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 2001 |
| POP 24-SEP-2019 TO |
23-SEP-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FOB: N/A
N32411
| 2002 |
| POP 24-SEP-2019 TO |
23-SEP-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 3001 |
| POP 24-SEP-2020 TO |
23-SEP-2021
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 3002 |
| POP 24-SEP-2020 TO |
23-SEP-2021
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 4001 |
| POP 24-SEP-2021 TO |
23-SEP-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 4002 |
| POP 24-SEP-2021 TO |
23-SEP-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 5001 |
| POP 24-SEP-2022 TO |
23-SEP-2023
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 5002 |
| POP 24-SEP-2022 TO |
23-SEP-2023
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 6001 |
| POP 24-SEP-2023 TO |
23-MAR-2024
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
| 6002 |
| POP 24-SEP-2023 TO |
23-MAR-2024
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N32411
CLAUSES INCORPORATED BY REFERENCE
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-18 |
| Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements or Statements--Representation |
| JAN 2017 |
| 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements |
| JAN 2017 |
| 52.204-7 |
| System for Award Management |
| OCT 2016 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2016 |
| 52.204-16 |
| Commercial and Government Entity Code Reporting |
| JUL 2016 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| JUL 2016 |
| 52.217-5 |
| Evaluation Of Options |
| JUL 1990 |
| 52.222-41 |
| Service Contract Labor Standards |
| MAY 2014 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| System for Award Management Alternate A |
| FEB 2014 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.215-7007 |
| Notice of Intent to Resolicit |
| JUN 2012 |
| 252.222-7007 |
| Representation Regarding Combating Trafficking in Persons |
| JAN 2015 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| JUN 2013 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.246-7008 |
| Sources of Electronic Parts |
| DEC 2017 |
CLAUSES INCORPORATED BY FULL TEXT
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(End of provision)
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.