This is a Statement of Work (SOW) for the procurement and installation of high-security doors at a government facility operated by Naval Surface Warfare Center Dahlgren Division, Dam Neck Activity.
The contractor must provide and install a total of eleven security doors comprising two (2) acoustical door systems for entry, one (1) left-hand entry, four (4) 3'0 x 7'10" right-hand access (RHA) solid core steel stiffened doors with astragal for front and rear entrances, and four (4) additional 3'0 x 7'10" RHA solid core steel stiffened doors with astragal for unspecified locations. All doors must be new, solid-core high-security steel construction without glass, featuring minimum 16-gauge pressed steel frames that are welded, ground smoothly, and anchored to prevent forced entry. Locks must be GSA-approved with three-position combination locks or high-security deadbolts meeting FF-L-2740B standards, electromechanical specifications, along with GSA-approved pedestrian deadbolts, non-removable hinge pins, and heavy-duty automatic door closers with no hold-open features. Sound attenuation seals and thresholds must meet acoustic requirements facilitating confidential conversations with appropriate STC ratings. Door frames and wall partitions require reinforcement, grouting, and sound-sealing to prevent forced entry and eavesdropping, and hardware must be compatible with high-security electronic access control systems and balanced magnetic switches for intrusion detection systems.
Installation must comply with OEM specifications and all applicable local, state, and federal safety, electrical, and building codes, with work performed during normal business hours (0800-1500, Monday through Friday). The contractor must meet a 60-day lead time for delivery and installation. Contractor personnel are required to complete security briefings, maintain unescorted facility access contingent on positive security standing, wear and return building access badges daily, comply with all facility security protocols including screening procedures and OPSEC guidelines, and adhere to the NSWCDD DNA Workplace Violence Prevention Policy with zero tolerance for threats, harassment, or abuse. All work is unclassified, and travel shall be minimized and coordinated with the technical point of contact.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.1.4 Two (2) each 3'0 x 7'10” RHA Solid Core Steel Stiffened Door w/ Astragal for .
3.1.5 Two (2) each 3'0 x 7'10” RHA Solid Core Steel Stiffened Door w/ Astragal for .
3.1.6 The Contractor shall ensure all materials provided are new and comply with standard industrial quality standards.
3.1.7 The Contractor shall ensure the doors are solid-core high-security steel doors (no glass).
3.1.8 The Contractor shall ensure the frame is minimum 16-gauge pressed steel frames, welded and ground smoothly, anchored to prevent unauthorized forced entry.
3.1.9 The Contractor shall ensure the locks are General Services Administration (GSA) approved, built-in three-position combination lock or high-security deadbolt/exit devices that meet FF-L- 2740B, combination, electromechanical, standards.
3.1.10 The Contractor shall ensure that sound attenuation seals and thresholds meet acoustic requirements, facilitating confidential conversations, typically requiring an STC rating appropriate for the threat level.
3.2 The Contractor shall install the doors in accordance with (IAW) OEM specifications.
3.3 The Contractor personnel shall wear personal protective equipment IAW OSHA regulations and CDC guidelines throughout the project.
3.4 The Contractor shall ensure all work is performed in accordance with (IAW) applicable Local, State, and Federal safety, electrical, and building codes.
3.5 The Contractor shall perform all work during normal working hours of 0800-1500, Monday through Friday.
3.6 The Contractor shall protect Government property from damage or disfigurement.
3.7 The Contractor shall keep all supplies, equipment, and tools out of traffic lanes or other areas where they might create a hazard securing all supplies, equipment and tools at the end of each work period.
3.8 The Contractor shall coordinate with the technical point of contact (TPOC) identified below to accomplish all work under this SOW.
3.9 The Contractor shall meet the 60-day lead time in the delivery and installation of solid core steel doors and associated equipment. This period accounts for custom manufacturing, logistical coordination, and thorough on-site implementation necessary for certification.
3.9.1 The Contractor shall ensure sourcing and fabrication of custom heavy-duty steel doors with required internal sound attenuation for sound class protection.
3.9.2 The Contractor shall secure GSA-approved pedestrian deadbolts, non-removable hinge pins, and heavy-duty automatic door closers with no hold-open features.
3.9.3 The Contract shall ensure hardware does interfere or is compatible with high-security electronic access control systems and balanced magnetic switches for intrusion detection systems
(IDS).
3.9.4 The Contractor shall ensure final door specifications and construction security plans are submitted to and approved by the government-appointed Accrediting Official (Security).
3.9.5 The Contractor shall ensure the door frames and associated wall partitions must be reinforced, grouted, and sound-sealed to prevent forced entry and eavesdropping.
4.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION
(GFP/GFM/GFI)
4.1 The Government will provide access to the following information/documents:
Drawings/layouts relevant to .
5.0 SECURITY
All work under this SOW is unclassified with the installation of the door performed on unclassified spaces.
5.0 SECURITY
5.1 Access and Security Briefing; Contractor personnel will be authorized unescorted access to designated facilities to perform tasks outlined in this SOW, provided they successfully complete the Naval Surface Warfare Center Dahlgren Division, Dam Neck Activity, local security briefing, initial site orientation, and any required facility-specific training.
5.1.1 Unescorted access is contingent upon maintaining a positive security standing, and such access may be revoked at the discretion of the Contracting Officer’s Representative (COR) or Facility Security Officer.
5.2 Building Access Badges: Issuance and Usage: Upon successful briefing, contractor personnel will be issued a photo identification/access badge. Badges must be worn and clearly visible at all times while on site.
5.2.1 Safeguarding: Contractor employees are responsible for safeguarding their issued badges.
Sharing, lending, or using another person's badge is strictly prohibited.
5.2.2 Daily Return: All contractor personnel shall return their issued building badges to the Visitor Control Center/Hopper Hall daily upon completion of their daily duties. Badges will be re-issued upon check-in the following workday.
5.2.3 Lost/Stolen Badges: Lost or stolen badges must be reported immediately (within one hour) to the COR and the Facility Security Office.
5.3 General Security Protocols: Contractor personnel must comply with all facility security protocols, including, but not limited to, using designated entrances/exits, participating in mandatory