This is a Questions and Answers document clarifying specifications for a modified shipping container unit. The container must include wood flooring (not steel), interior wall finishes consisting of 1-1/2" foam insulation, 3/8" plywood board, and white textured plastic lining with finished panels installed over the foam board. A 15,000 BTU PTAC air conditioning unit with thermostat is required; through-wall units are not acceptable. Four-foot LED lights may be substituted with LED inset lights at the contractor's discretion.

Electrical specifications include 230/208/1 phase power with a NEMA 3 disconnect and NEMA 1 electrical panel. The PTAC unit requires 240-volt power at 12.5 amps (3kW) with a dedicated 240-volt receptacle, plus a separate 120-volt GFCI receptacle. The container does not require unloading capabilities or personnel doors, as it will not remain closed during occupancy. Delivery must be arranged via tilt-bed trailer for ground placement, with crane support available at additional cost to the customer (referred to as "COMMAND").

View the file

Other files

File Type Posted
0213-02-Containers-Rqmt List-REV1.xlsx XLSX spreadsheet
N0017826Q6694.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

1. Will you have unloading capabilities to unload the container from a chassis? NO

2. Can we substitute the PTAC A/C unit for a through wall A/C unit? NO (15K minimum. Also need a thermostat.)

3. Can we substitute the 4’ LED lights for LED inset lights? YES

4. What type of wall finish do you want provided? (drywall, 5/8” CDX, T1-11, etc)

Suggest 1-1/2" Foam Insulation, Board, 3/8" Plywood With White Textured Plastic Lining. (or material equivalent for best climate control results)

5. The RFQ mentions ICC-ESR compliant containers to be used. These have a steel flooring, but the RFQ calls out for wood flooring. Please confirm what is needed?

WOOD FLOORING

6. Should the interior walls include a finished panel installed over the foam board insulation? YES

7. Will the container need to remain closed while someone is inside? (Standard cargo doors cannot be opened from the inside. If occupancy is expected while closed, a personnel door would need to be installed.) NO

8. What type of electrical power will be supplied to the container (voltage/phase), and are any specialized power connections required? COOLING: 15k BTU, E HEAT: 3kW, POWER/BREAKER: 230/208/1PH, NEMA 3 DISCONNECT, NEMA 1 ELECTRICAL

PANEL, PTAC – VOLT 240 / WATT3Kw / AMPS 12.5, PTAC RECEPTACLE – 240 VOLT, GFCI RECEPTACLE – 120 VOLT

9. Will there be a crane or forklift available onsite for unloading, or should delivery be arranged via a tilt-bed trailer for ground placement? REQ Tilt Bed Trailer / Crane Support can be available at an additional cost to COMMAND.