N0017825R4500_Amendment 1_Final.pdf

PDF 996 KB Posted

Attached to
DNA Construction Engineering Support Federal contract opportunity
Solicitation number
N0017825R4500
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is a federal solicitation (RFP) for a Firm-Fixed Price (FFP) 8(a) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) from the Naval Surface Warfare Center Dahlgren Division (NSWCDD). The 60-month contract will provide construction engineering support services at Dam Neck Activity, including management, labor, material, equipment, transportation, supervision, IT infrastructure installation/support, and environmental and quality controls for maintenance, sustainment, repair, and minor construction projects. The total contract ceiling is $21,850,615.89, with a minimum contract value of $500, and task orders will be awarded on a firm-fixed price basis.

The solicitation is a 100% set-aside for 8(a) Small Business concerns, with a NAICS code of 236220 and size standard of $45 million. Offerors must have a primary facility within 50 miles of NSWCDD in Virginia Beach, VA. Proposals are due by July 18, 2025, at 2:00 PM ET, with a 365-day proposal validity period. The government intends to award to all qualifying offerors who submit technically acceptable proposals. Evaluation will focus on Construction Approach & Prior Experience and Past Performance factors, with a pass/fail assessment of business requirements. Performance will occur at the Dam Neck Activity location in Virginia Beach, VA.

View the file

Other files for this federal contract opportunity

Other files attached to DNA Construction Engineering Support, newest first.
File Type Posted
Attachment J.3 - Wage Determination.pdf PDF
Attachment J.2 - QASP.pdf PDF
N0017825R4500 Question and Answers 26 June 2025.pdf PDF
Attachment J.2 - DD254.pdf PDF
Attachment J.3 - QASP.pdf PDF
N0017825R4500 Solicitation.pdf PDF
Exhibit A - CDRLS.pdf PDF
Attachment J.4 - Wage Determination.pdf PDF
Attachment J.1 - COR Appointment Letter (placeholder).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a Firm-Fixed Price (FFP) 8(a) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Aw ard Contract (MAC) for Naval Surface Warfare Center Dahlgren Division (NSWCDD)- Dam Neck Activity (DNA). This requirement w ill provide support services to achieve the acceptable levels of requirements for management, labor, material, equipment, transportation, supervision, Information Technology (IT) Infrastructure installation/support, and environmental and quality controls, to accomplish simultaneous maintenance, sustainment, repair, and minor construction projects.

NAICS Code 236220. Size Standard $45,000,000.00.

This solicitation is 100% set aside for 8(a) Small Business concerns.

MATTHEW H. GUTMANN

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30-May-2025

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________18 Jul 2025 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NSWCDD 1

MATTHEW GUTMANN/0253 17632 DAHLGREN ROAD

DAHLGREN VA 22448

N00178

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 540-208-9534 TEL: FAX:

N0017825R4500 67

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N0017825R4500

Section B - Supplies or Services and Prices

CONTRACT MINIMUM/MAXIMUM VALUE

The minimum contract value for all orders against this contract shall not be less than the minimum contract value stated in the following table. The maximum contract value for all orders issued against this contract shall not exceed the maximum contract value stated in the following table:

Minimum Amount Maximum Amount $500.00 $21,850,615.89

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 UNDEFINED Job DNA Construction Engineering Support

FFP

This requirement has a Five-Year Base Ordering Period. Contractors will be required to provide support services for management, labor, material, equipment, transportation, supervision, Information Technology (IT) Infrastructure installation/support, and environmental and quality controls, to accomplish simultaneous maintenance, sustainment, repair, and minor construction projects at NSWCDD Dam Neck Activity (DNA) in accordance with Section C requirements.

FOB: Destination

PSC CD: Z1GD

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 1 Lot Kick-Off Meeting

FFP

Kick-Off Meeting in support of CLIN 0001

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED Job Data in Support of CLIN 0001 and 0002

FFP

Section C - Descriptions and Specifications

GENERAL REQUIREMENTS

This acquisition is being performed IAW FY2017 NDAA Section 233 Authorities.

SCOPE OF SERVICES

1. Scope of Support Services

1.1. The Contractor shall provide all management, labor, material, equipment, transportation, supervision, Information Technology (IT) Infrastructure installation/support, and environmental and quality controls, to accomplish simultaneous maintenance, sustainment, repair, and minor construction projects at Naval Surface Warfare Center Dahlgren Division (NSWCDD) Dam Neck Activity (DNA) in Virginia Beach, VA.

1.2. In addition to standard maintenance, sustainment, repair, and minor construction, the following are considered within the scope of this contract:

a) Field surveying of sites to document existing conditions (e.g. utilities, grading, sidewalks, etc.), and mapping of new site conditions required to update Graphic Information System (GIS).

b) Sampling and testing of potential existing hazardous construction materials (e.g. lead paint, flooring mastic, pipe insulation, asbestos, etc.). Providing test reports to the Government documenting materials sampled.

c) Performing and providing engineering analysis and evaluations to determine the structural, electrical capacity, IT infrastructure and heating/cooling requirements to support mission equipment.

d) Providing energy computations for infrastructure solutions including: energy or thermal performance of wall and roof systems; projecting energy performance of new systems (e.g. new boiler, Air Handling Unit (AHU), hot water heater, etc.).

1.3. Work performed under this contract will be complex in nature and require multiple disciplines working simultaneously to include coordination with Architect-Engineer (A-E) Contractors as necessary.

All such work shall be accomplished in strict accordance with all applicable Navy and local instructions, processes, and procedures and applicable building and life safety code requirements.

2. Hours of Operation

Normal working hours are Monday through Friday, 0700 to 1700. Work shall not occur outside those hours unless previously approved by the Contracting Officer, or specified in a Task Order. In the event that Government testing schedules interfere with the Contractor’s planned work schedule, and that interference will cause a delay in schedule or increase in price, notify the Contracting Officer immediately.

SAFETY, ENVIRONMENTAL AND HAZARDOUS MATERIALS

1. SAFETY AND ON-SITE SAFETY

1.1 The Contractor shall comply with the requirements of NSWCDD DNA, Department of the Navy (DON), and DOD safety policies and practices currently in force and all subsequent revisions. Established policies, directives, and guidance relating to safe operating practices and personnel safety are mandatory and shall be complied with at all times. The Contractor shall monitor and observe all activities and personnel to ensure strict adherence and compliance to applicable standard operating procedures and safety procedures. The Contractor shall observe all applicable technical, safety, and policy requirements as applies to the handling of hazardous materials.

1.2 The Contractor shall address and comply with all applicable workplace and work environment conditions for compliance with the intent and letter of Federal, State, local and DoD Occupational Safety and Health laws and regulations, policies, and practices.

1.3 All operations are subject to DOD/DON/NSWCDD DNA safety inspections. The Contractor shall support NSWCDD DNA annual safety and environmental facility audits and data collection efforts.

1.4 The Contractor shall strictly adhere to Federal Occupational Safety and Health Agency (OSHA) Regulations, Environmental Protection Agency (EPA) Regulations, NSWCDDINST 5100.1 Occupational Safety and Health Instruction (current revision), and all other applicable state and local requirements.

1.5 All work shall be done in accordance with the US Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1 (current edition) and all applicable Unified Facilities Criteria (UFC’s), building and life safety codes.

1.6 The Contractor shall provide each Contractor employee with the training required to do his/her job safely and in compliance with applicable regulations. The Contractor shall document and provide, upon request, qualifications, certifications, and licenses as required. Contractors conducting lead or asbestos abatement activities shall also provide a written abatement plan to the Safety & Environmental Branches for review and approval.

1.7 The Contractor shall provide each Contractor employee with the personal protective equipment required to do their job safely and in compliance with all applicable regulations.

1.8 Contractors shall not procure Hazardous Materials (HAZMAT) on behalf of NSWCDD DNA without following the approved HAZMAT procurement process in the Enterprise Resource Planning (ERP) Portal. For emergency HAZMAT purchases only, the Contractor shall alert the Safety & Environmental Branches and request a waiver to procure outside the HAZMAT procurement process. For emergency purchases, the Contractor shall submit an Authorized Use List Addition form and the Safety Data Sheet to the Safety & Environmental Branches for approval. Once the HAZMAT arrives onsite, the Contractor shall alert the Environmental Branch so that it can be barcoded and added to the inventory.

1.9 HAZMAT owned by the Contractor and brought into NSWCDD DNA workspaces for temporary use shall be reviewed and approved by the Safety & Environmental Branches prior to use. The Contractor shall submit the Material Safety Data Sheet (SDS) that must be routed through the Government supervisor responsible for the specific work area. This HAZMAT must clearly be marked that it is Contractor owned and shall not be stored in NSWCDD DNA spaces.

1.10 Applicable Contractors shall submit Total Case Incident Rate (TCIR) and Days Away, Restricted and Transfer (DART) rates for the past three years upon request by the Safety Branch. A Contractor meets the definition of applicable if its employees worked 1,000 hours or more in any calendar quarter on site and where oversight is not directly provided in day-to-day activities by the command.

1.11 Contractors working with ionizing radiation (radioactive material or machine sources) must comply with NAVSEA S0420-AA-RAD-010 (latest revision)(provided upon request). Prior to bringing radioactive materials or machine sources on base, the Contractor must notify the Command Radiation Safety Officer in the Safety & Environmental Office.

1.12 The Contractor shall immediately report all work-related injuries/illnesses that occur while working at NSWC DNA, or an off-site location (including shipboard), to the Safety Branch, and the COR.

2. ENVIRONMENTAL AND HAZARDOUS MATERIALS HANDLING

2.1 The Contractor, suppliers, and Sub-contractors shall comply with all certification, licensing, and training requirements for all federal, state, and local laws and regulations with respect to the handling and disposal of hazardous materials.

2.2 The Contractor shall create a Hazardous Material Management Plan (HMMP) at locations where the Contractor disposes of hazardous materials such as batteries; fluorescent tubes, caulking tubes, and refrigerant. Contractor shall utilize hazardous materials collection points or Government collection centers for discarded hazardous material.

2.3 Asbestos and lead‐based paint assessments may be required on this contract to determine the presence of hazardous material during demolition or at utility points of connections. Work on and around waterfront structures, including under deck and underwater, and work in confined spaces may be required on this contract. The Contractor shall be able to accept work that involves asbestos, lead paint, Poly‐ Chlorinated Biphenyls (PCB) s, and other hazardous materials, work on and under waterfront structures, and in confined spaces.

2.4 The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the NSWCDD DNA environmental management system (EMS). The Contractor shall perform work in a manner that conforms to all appropriate EMS Plans of Actions and Milestones identified by the NSWCDD EMS Plan. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the Contractor shall respond and take immediate corrective and/or preventative actions to ensure the actions do not continue. In addition, the Contractor shall ensure that their employees are aware of their roles and responsibilities identified by the NSWCDD EMS and how these requirements affect their work performed under this contract.

2.5 HAZMAT may be utilized at any time during the performance of work on a Government site as required and specified in the TOP and subsequent Task Order. Compliance with applicable Government regulations is required.

2.6 HAZMAT are defined in FED-STD-313F and include items such as chemicals, paint, thinners, cleaning fluids, alcohol, epoxy, flammable solvents, or asbestos.

2.7 The Contractor shall have an active Hazard Communication Program in place for all Contractor employees per 29 C.F.R. 1910.1200. Before delivery of any hazardous materials onto Government property, the Contractor shall provide the COR with an inventory and Safety Data Sheet (SDS) for these materials.

2.8 HAZMAT must be used safely according to local standard operating procedures (SOPs).

SECURITY

1. PORTABLE ELECTRONIC DEVICES

Non-government and/or personally owned portable electronic devices (PEDs) are prohibited in all NSWCDD DNA buildings with the exception of personally owned cell phones, which are authorized for use in General Office Spaces (GOS). All personnel need to be aware of PED’s policy and being permitted in a building by asking authorized personnel or reviewing the entrance area signs and instructions. The Contractor/personnel visiting shall ensure the onsite personnel remain compliant with this PED policy. NSWCDD DNA instruction defines PEDs as the following: any electronic device designed to be easily transported, with the capability to store, record, receive or transmit text, images, video, or audio data in any format via any transmission medium. PED’s include, but are not limited to, pagers, laptops, radios, compact discs and cassette players/recorders. In addition, this includes removable storage media such as flash memory, memory sticks, multimedia cards and secure digital cards, micro-drive modules, ZIP drives, ZIP disks, CD-RWs, DVD-RWs, MP3 players, iPADs, digital picture frames, electronic book readers, kindle, nook, cameras, external hard dish drives, and floppy diskettes.

Personal Wearable Fitness Devices (PWFDs) marketed primarily as fitness or sleep devices are allowed in all Navy spaces, if they are compliant with NAVADMIN 216/15, where collateral non-Sensitive Compartmented Information (SCI), classified information is processed, stored, or discussed up to and including secret. The User must ensure the PWFD is compliant with all requirements in NAVADMIN 216/15, Cyber Hygiene Authorization to use Personal Wearable Fitness Devices (e.g., FitBit, Jawbone UP, etc.) in Navy Spaces, dated 14 September 2015 and register PWFD in the NSWCDD Fitness Device Tracker.

Personnel requiring the use of Medical Portable Electronic Devices (MPEDs) must submit Form NSWCDD 5239/4 for SCIF authorization to the Special Security Officer (SSO). For Special Access Program Facility (SAPF) authorizations, follow the guidance provided by the Government Special Access Program Security Officer (GSSO). Authorizations for use in SAPFs that are co-utilized within NSWCDD DNA SCIFs require coordination between both the GSSO and SSO. For authorizations to use MPED in Collateral Classified spaces, submit form to the Special Programs Branch, Code 1053.

PED’s belonging to an external organization shall not be connected to NSWCDD DNA networks or infrastructure without prior approval from the NSWCDD DNA Information Assurance and Compliance Branch. This approval will be granted using the Temporary Approval Request for Information System (TARIS) form and action tracker process. Personally owned hardware or software shall not be connected or introduced to any NSWCDD DNA hardware, network or information system infrastructure.”

2. NAVY-ISSUED PERIPHERAL

Government procured headsets with or without microphones must be wired, use either a 3.5 millimeter

(mm) audio jack or universal serial bus (USB) port, cannot contain active-noise cancelling functionality and may be used on systems and may be used on systems of classification up to and including collateral Top Secret. The headsets are considered unclassified when unplugged, and must be unplugged when not in use within classified spaces or when classified discussions are taking place in unclassified spaces.

Government procured Bluetooth earbuds and headsets that do not require a USB dongle or any other physical connection to enable wireless connectivity are allowed for use on government issued tablets, phones, and personal devices in telework environments or unclassified general office space where no classified discussions are occurring.

Web cameras may only be used on systems at the classification level of the space. For example, in a collateral SECRET open storage area an external web camera may be connected to the SECRET workstation only. No camera pass is required for these devices.

Government provided printers and/or scanners are authorized in a telework environment. Users must ensure that any paper or media containing controlled unclassified information (CUI) or unclassified information not authorized for public release is safeguarded by locking in a drawer, cabinet or room. CUI and unclassified information not approved for public release must be returned to the worksite for destruction.

Government issued peripherals may be used on personal devices.

While connected to any Navy network, whether on site or while in a telework environment, the use of headsets with microphones and web cameras are restricted to official government duties.

3. OPERATIONS SECURITY (OPSEC)

3.1 Contractor personnel shall follow OPSEC concepts and principles in the conduct of this requirement to protect critical information, personnel, facilities, equipment, and operations from compromise. All Contractors (including Sub-contractors) shall supplement their current security practices by requiring any personnel involved in executing this Task Order to complete Government-sponsored and administered Operations Security (OPSEC) training. In addition, all Contractors should be aware of the Critical Information and Indicators List (CIIL) for the organization they are supporting as well as the OPSEC plan for NSWCDD DNA.

3.2 These OPSEC requirements will be in effect throughout the life of the procurement from award through the conclusion of services at the end of the period of performance (PoP) or other procurement termination. The Contractor must immediately notify the Government upon the discovery of any nonconformance with the OPSEC Plan.

4. IDENTIFICATION BADGES

4.1 The Contractor shall be required to obtain identification badges from the Government for all Contractor personnel to be located on Government property. The identification badge shall always be visible while employees are on Government property.

4.2 The Contractor shall furnish all requested information required to facilitate issuance of identification badges and shall conform to applicable regulations (DoDM 1000.13) concerning the use and possession of the badges.

4.3 The Contractor shall be responsible for ensuring that all identification badges issued to Contractor employees are returned to the appropriate Security Office within forty-eight (48) hours following completion of the Task Order, relocation, reassignment, or termination of an employee, and upon request by the Contracting Officer.

5. SECURITY CLEARANCES

5.1 For Controlled Unclassified Information (CUI) and Personally Identifiable Information (PII) generated and/or provided under this Task Order shall be safeguarded and marked as specified in DoD Instruction 5400.48.

Citizenship Requirements: Only U.S. citizens may perform under this contract unless waived.

Physical Security: In order to ensure base access, contractors are required to register employees who will require base access during performance of tasking in the Defense Biometric Identification System (DBIDS). https://dbids-global.dmdc.mil/home/

Contractor requests for visit authorizations shall be submitted in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117, as early as practicable and not later than three (3) working days prior to visit (except in cases of urgency). When a contractual relationship exists, original requests shall be delivered to the Security Officer of the activity being visited. When a contractual relationship does not exist, original requests shall be delivered to the Security Officer of the activity being visited via the COR for endorsement of need-to-know. Visit requests for Sub-contractors shall be submitted to the appropriate contractor FSO for certification on need-to-know, when applicable.

5.2 Security Classification Specification

Classified Military Information (CMI). This is information that is originated by or for the DOD, or a Military Department, or an entity under its jurisdiction and control, and that requires protection in the interest of national security. Such information is designated as TOP SECRET, SECRET, or

CONFIDENTIAL.

Controlled Unclassified Information (CUI). This is information that although unclassified, is subject to access or distribution limitations in accordance with statute or regulation. Included is information exempt from mandatory release to the public under the Freedom of Information Act, or information that is subject to export control.

6. ELECTRONIC SPILLAGES

6.1. Electronic spillages (ES) are unacceptable and pose a risk to national security. An electronic spillage is defined as classified data placed on an information system (IS), media or hardcopy document possessing insufficient security controls to protect the data at the required classification level, thus posing a risk to national security (e.g. sensitive compartmented information (SCI) onto collateral, Secret onto Unclassified, etc.). The Contractor's performance as it relates to ES will be evaluated by the Government.

ES reflects on the overall security posture of the Government and a lack of attention to detail with regard to the handling of classified information of IS security discipline and will be reflected in the Contractor's performance rating. In the event that a Contractor is determined to be responsible for an ES, all direct and indirect costs incurred by the Government for ES remediation will be charged to the Contractor.

6.2 NSWCDD DNA Command Security will identify the Contractor facility and contract number associated with all electronics spillages during the investigation that involve Contractor support.

Command Security will notify the Contracts Division with the Contractor facility name and contract number, incident specifics and associated costs for cleanup.

6.3 The Contracting Officer will be responsible to work with the Contractor Facility to capture the costs incurred during the spillage clean up. The Contractor is also responsible for taking Information Security Awareness training annually, via their Facility Security Officer (FSO), as part of the mandatory training requirements.

GENERAL REQUIREMENTS

1. PROJECT REQUIREMENTS

1.1. Each Task Order (TO) will specify the project requirements. The following are required in all TOs:

a) Procuring all construction equipment, materials, and documentation necessary for timely completion of projects. The Contractor shall maintain all certification and re-certification equipment paperwork;

inspection records (QA/QC form filled out by Government TPOC); and permits and licenses for heavy equipment operation.

b) Providing a project schedule at the beginning of each Task Order. A Government approved schedule is required prior to commencing work on any project. The Contractor shall be required to maintain the construction schedule throughout the duration of the project and adjust the schedule accordingly based on any project delays or efficiencies incurred throughout the course of the project.

c) Conducting a site visit prior to commencing work in order to verify existing conditions; coordinating with NSWCDD/NAVFAC to confirm location and type of existing utilities at buildings or sites that may be impacted by construction work.

d) Regularly inspecting all work to ensure it is in accordance with all project requirements, design documents, and safety requirements.

e) Obtaining all permits and regulatory approvals required to perform work (ex: Virginia Department of Environmental Quality, VDEQ).

f) Operation and Maintenance Support Information (OMSI): Providing training to the Government on operating and maintaining all critical systems. The Contractor shall submit to the Government all O&M manuals at the conclusion of each Task Order.

g) Following work completion, the Contractor will conduct a construction site/space walk through with the Government POC and NSWCDD DNA Facilities Manager to confirm that all modifications/requirements have been conducted IAW TO requirements.

2. REGULATIONS

2.1 All work performed under this contract shall be performed following applicable Government plans, standards, policies, and processes. The Contractor’s activities shall conform to the systems test and operations environment and standards including all updates, improvements, and additions to these process documents made over the life of the contract. The Contractor shall use the Department of Defense (DoD) Unified Facilities Criteria (UFC) for facilities and infrastructure construction and modification. All documentation shall be developed within the software environment specified by the Government, Microsoft Office toolset and other specific tools and environments as stipulated in each Task Order.

Deviations from these processes, policies, and procedures are not authorized without advance approval by the COR.

2.2. All projects under this contract shall comply with the most recent edition of applicable federal, state, and local laws, codes, and regulations including but not limited to the following (any exception must be approved in writing by the Contracting Officer):

1. OPNAVINST 5100.23 (5 JUN 2020)*

2. OPNAVINST 5100.27 (02 MAY 2008)*

3. OPNAVINST 5090.1 (3 SEPT 2019)*

4. NAVSEA S0420-AA-RAD-010 (19 JUL 2007)*

5. NAVFAC P-307 (JUNE 2016)*

6. NAVSUP Publication 538 (01 APR 2012)*

7. NSWCDDINST 5100.1 (02 MAY 2023)*

*Or most current version

2.3. Contractor Personnel: The Contractor shall employ a sufficient number of qualified personnel to adequately perform and oversee all work under this contract. When work is performed at any site, the assigned Lead (i.e. Superintendent, Supervisor, Foreman, etc.) or an appointed alternate shall be available as a liaison for the Government. Any appointed alternate shall be authorized to act on behalf of the Contractor.

2.4. Employee Equipment: Contractor shall provide all required Personal Protective Equipment (PPE) and any special equipment required for safe and timely completion of projects. Certain Safety items will need to be approved by NSWCDD DNA Base Safety prior to use (example: safety harness for fall protection).

2.5. Employee Requirements: The Contractor shall ensure that the employees and Sub-contractor employees have current, valid licenses and certifications necessary to perform their functions. Any cost or time associated with obtaining licenses or certifications shall be at the Contractor’s expense. Training necessary to ensure that personnel performing under this contract maintain the knowledge and skills to successfully perform the required functions is the responsibility of the Contractor. The Contractor shall ensure manufacturer certified maintenance personnel perform maintenance and repair on mechanical and electrical critical systems in accordance with this contract.

2.6. Employee Conduct: The Base Commander has authority to refuse access to any person working under this contract for reasons of misconduct, security, or if found to be or suspected to be under the influence of alcohol, drugs, or any other incapacitating agent (ref. 18 U.S.C.1382 (1972)). Assignment, transfer, and reassignment of Contractor personnel shall be at the discretion of the Contractor. However, when the Government directs, the Contractor shall remove from contract performance any person who endangers life, property, or national security through improper conduct. All Contractor personnel engaged in work while on Government property shall be subject to all applicable DOD and Navy Standards of Conduct. All persons engaged in work while on Government property shall be subject to search of their persons (no bodily searches) and vehicles at any time by the Government, and shall report any known or suspected security violations to the appropriate Security Department. The Contractor shall ensure that all contractor employees who require access to DNA are able to obtain base access in support of this contract.

2.7. Employee Required Training: The Contractor shall have personnel certified in Hazard Communication (HAZCOM). On a Task Order basis, Contractor personnel may be required to take training mandated by NSWCDD DNA. Examples include but are not limited to Anti-Terrorism Training, Annual NSWCDD DNA environmental awareness, Privacy Training, and Information Assurance Training.

3. MANDATORY REQUIREMENTS

The Mandatory Requirement shall be maintained throughout the life of the Contract. The mandatory requirement is as follows:

Requirement 1: Facility Location:

The Prime Contractor’s primary facility providing support to this requirement must be located within 50 miles of NSWCDD DNA in Virginia Beach, VA.

Requirement 2: Personnel Security Clearances:

All personnel assigned to this contract shall possess, and maintain at a minimum, SECRET security clearances. An interim SECRET (S) clearance is acceptable for 180 days following contract award.

Requirement 3: Facility Clearance:

The Prime Contractor supporting this contract is required to have an FCL of SECRET at the primary facility supporting this contract.

4. CONTRACT DATA REQUIREMENTS LIST

The Contractor shall submit the following CDRLs in accordance with Exhibit A and as specified in each

TO:

CDRL A001: Monthly Status Report

CDRL A002: CONTRACTOR’S PERSONNEL ROSTER

CDRL A003: HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP) PLAN

CDRL A004: QC/QA Post Completion Inspection Report

CDRL A005: Technical MECHANICAL/ELECTRICAL/PLUMBING (MEP) Drawings Post Installation

CDRL A006: Environmental, Safety, and Occupational Health (ESOH) plan

5. CONSTRUCTION WAGE RATE DETERMINATION

Construction Wage Determination(s) shall be current and site specific to each order and incorporated at the time the order is placed.

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal *to be inserted at time of award dated *to be inserted at time of award in response to Solicitation No. *to be inserted at time of award.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018)

(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee’s name, work site, and contract number.

(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.

(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office, via the COR by 15 January for the previous calendar year, even if no work related injuries or illnesses occurred. If a contractor’s injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.

(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.

(e) The Safety Office points of contacts are as follows:

Mr. Robert Peed, Facilities Director.

Email: robert.r.peed.civ@us.navy.mil Phone: (757)492-7694

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.

(End of Text)

C-227-H009 ACCESS TO DATA OR COMPUTER SOFTWARE WITH RESTRICTIVE MARKINGS (NAVSEA)

(JAN 2019)

(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party that contains restrictive markings. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the restrictively marked data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains properly restrictively marked. In addition, the agreement shall not impose any limitation upon the Government or its employees with respect to such data or software. A copy of the executed agreement shall be provided to the Contracting Officer. The Government may unilaterally modify the contract to list those third parties with which the Contractor has agreement(s).

(b) The Contractor agrees to: (1) indoctrinate its personnel who will have access to the data or software as to the restrictions under which access is granted; (2) not disclose the data or software to another party or other Contractor personnel except as authorized by the Contracting Officer; (3) not engage in any other action, venture, or employment wherein this information will be used, other than under this contract, in any manner inconsistent with this requirement; (4) not disclose the data or software to any other party, including, but not limited to, joint venturer, affiliate, successor, or assign of the Contractor; and (5) reproduce the restrictive stamp, marking, or legend on each use of the data or software whether in whole or in part.

(c) These restrictions on use and disclosure of the data and software also apply to information received from the Government through any means to which the Contractor has access in the performance of this contract that contains restrictive markings.

(d) The Contractor agrees that it will promptly notify the Contracting Officer of any attempt to gain access to any information with restrictive markings. Such notification shall include the name and organization of the individual, company, or Government representative seeking access to such information.

(e) The Contractor shall include this requirement in subcontracts of any tier which involve access to information covered by paragraph (a), substituting "subcontractor" for "Contractor" where appropriate.

(f) Compliance with this requirement is a material requirement of this contract.

C-228-H002 MINIMUM INSURANCE REQUIREMENTS (NAVSEA) (JAN 2019)

(a) In accordance with the clause(s) of this contract entitled "Insurance--Work On a Government Installation" (FAR 52.228-5) and “Liability and Insurance” (DFARS 252.217-7012), as applicable, the Contractor shall procure and maintain insurance, of at least the kinds and minimum amounts set forth below:

(i) Workers' compensation and employer’s liability coverage shall be at least $100,000, except as provided in FAR 28.307-2(a), if applicable

(ii) Bodily injury liability insurance coverage shall be written on the comprehensive form of policy of at least $500,000 per occurrence.

(iii) Automobile liability policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

(b) To be approved by the Contracting Officer, insurance certificates must include the following cancellation policy statement: Prior to cancellation or material change in coverage, the contractor shall give 30 days written notice to the Contracting Officer.

(c) Physical work cannot begin until the insurance certificate has been approved by the Contracting Officer. Failure to provide an acceptable insurance certificate will not remove the contractor’s responsibility to meet the delivery requirements outlined in Section F and FAR 52.211-11, Liquidated Damages – Supplies, Services, or Research and Development, if applicable.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 10-OCT-2025 TO

09-OCT-2030

N/A NAVAL SURFACE WARFARE CENTER

DAM NECK

RECEIVING OFFICER

ATTN NSLC DAM NECK 2089 TARTAR

AVE. BLDG 559

VIRGINIA BEACH VA 23461-2097

N63273

0002 POP 10-OCT-2025 TO

09-OCT-2030

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 10-OCT-2025 TO

09-OCT-2030

N/A (SAME AS PREVIOUS LOCATION)

52.236-15 Schedules for Construction Contracts APR 1984 52.247-34 F.O.B. Destination JAN 1991

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the stated date at the end of each order. * The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

Section G - Contract Administration Data

252.204-7006 Billing Instructions--Cost Vouchers MAY 2023 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .