N0017824RC610-Amendment 0001.pdf
PDF 517 KB Posted
- Attached to
- Cleanroom Federal contract opportunity
- Solicitation number
- N0017824RC610
About this file
This document is an Amendment to Solicitation/Modification of Contract for a federal contract opportunity. The purpose of this amendment is to revise the Statement of Work (SOW) for the procurement of an ISO 6 clean room that is 30L x 20W x 20H in dimensions. The contractor shall design, ship, and build the clean room in accordance with the specified technical requirements, including an HVAC system, lighting, electrical, floors, gowning area, air shower, and other features. The government will provide access to the work site, utilities, and other support. The original solicitation number is N0017824RC610, with an anticipated closing date of August 8, 2024 and award by August 30, 2024. This is a firm-fixed price order utilizing Simplified Acquisition Procedures, with award based on Lowest Price Technically Acceptable. The contract is not eligible for small business set-aside.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0017824RC610 Amendment 0006.pdf | ||
| N0017824RC610 Amendment 0005.pdf | ||
| SAM RFQ Posting_Amendment 0004.pdf | ||
| N0017824RC610 Amendment 0003pdf.pdf | ||
| N0017824RC610-Amendment 0002.pdf | ||
| DID DI-SESS-80776B.pdf | ||
| CDRL A001.pdf | ||
| N0017824RC610.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to revise the Statement of Work (SOW).
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0017824RC610
X 9B. DATED (SEE ITEM 11)
26-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2024
CODE
NSWCDD 3
ATTN:KAREN MAJOR/026 17632 DAHLGREN ROAD
DAHLGREN VA 22448-5110
N00178 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0017824RC610
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK (SOW)
CLEANROOM
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
The Naval Surface Warfare Center, Dahlgren Division (NSWCDD), requires an ISO 6 clean room. This space will be arranged within a steel building structure that can accommodate this size facility.
2.0 APPLICABLE DOCUMENTS
2.1 Drawing (attached below).
2.2 Original Equipment Manufacturer (OEM) Specifications.
2.3 Contract Data Requirements List (CDRL);
2.4 International Organization for Standardization (ISO) 6, Cleanroom Classification Standard; and
2.5 Occupational Safety and Health Administration (OSHA) Regulations.
3.0 REQUIREMENTS
3.1 The contractor shall design, ship, and build one (1) ISO 6 clean room that is 30L X 20W X 20H in dimensions meeting all the following specifications:
3.1.1 Size shall be 30L X 20W X 20H.
3.1.2 Ceiling system shall consist of extruded aluminum framework finished with powder coated paint or anodization. Ceiling tiles shall be walkable on the topside.
3.1.3 Walls consisting of static resistant clean room approved materials.
3.1.4 LED Lighting at appropriate schedule mounted on the ceiling.
3.1.5 Center dividing wall for integration space (integration space less pressure than other clean side)
3.1.6 Air returns along the floor to complete the air cycle through the HVAC system.
3.1.7 Clean room rollup door or equivalent for fast exit/entry of assemblies
3.1.8 20 amp circuits along the outside walls, quantity of 24 quads. Panels shall be provided.
3.1.9 A quantity of 4 on each side for a total of 8 Clean air drops shall be provided.
3.1.10 Fire suppression sprinkler head punch outs for future insertion shall be provided.
3.1.11 Viewing windows as shown in figure below using clean room static resistive materials.
3.1.12 Door between clean side and integration side. This door shall have a viewing window.
3.1.13 HVAC system shall mount above the clean room and shall accommodate ISO 6 processes. This HVAC system shall have return ducts from the cleanroom and a plenum that mixes return air with new outside air. HVAC system shall clean the air entering the room to meet the ISO 6 standard. Heating, cooling and antistatic operations shall be performed on the air exiting the system. Maintenance ease of access shall be accommodated.
3.1.14 Epoxy coated floors or equivalent. Epoxy floor shall extend outside the clean room by 10 feet.
3.1.15 Epoxy floor shall be marked as red zone within 6 feet of the roll up door.
3.1.16 Pressure, temperature, and relative humidity monitor shall be mounted inside and outside of clean room.
3.1.17 Clean room shall be capable of providing a consistent temperature of approximately 68 degrees Fahrenheit +/- 3 degrees.
3.1.18 Clean room shall be capable of providing a relative humidity of 30-50%.
3.1.19 Positive air pressure shall be maintained, and alarms shall sound if pressure drops below limit. Limits shall be set on a controller to be provided by the contractor.
3.1.20 Clean room area shall have a 20’ ceiling with a 4’ plenum.
3.1.21 A 11 x 8 gowning grey room shall be provided for facilitating entry. Gowning area shall have 8’ ceiling with a 4’ plenum.
3.1.22 Emergency exit lighting and signage shall be included.
3.1.23 Passthrough shall be large enough for a standard cart into main cleanroom.
3.1.24 Red, Green, White LED indicator lights visible to all inside the cleanroom, gowning room, air shower, and at the cleanroom entrances shall be provided.
3.1.25 Fire alarms and pull stations shall be provided.
NOTE: The Government will tie them into the current system.
3.1.26 Data ports integrated into the walls 6 on each side shall be provided.
3.1.27 Appropriate signage for exits shall be provided.
3.1.28 Emergency lighting and battery packs shall be provided.
3.1.29 Gowning area shall have a designated clean and dirty side.
3.1.30 Gowning area shall pass through a 4 foot by 8 foot air shower prior to entering the CR as shown in the drawing below.
3.1.31 Drawing for HVAC and wall height for design shall be included (CDRL A001).
3.1.32 HVAC system shall be placed over the left “roll-in” integration space side.
3.1.33 Max height to the top of the HVAC system shall be 21’ for clearance for structural girder.
3.1.34 Gowning area max height 12’ clearance for water lines shall be provided.
3.2 The Contractor shall clean and certify the Clean Room.
3.3 The Contractor shall perform all services during normal working hours, Monday through Friday, 0800 – 1700
3.4 The Contractor shall coordinate air, water, power, and fire suppression with onsite Navy Facilities personnel.
3.5 The Contractor shall perform all work meeting OEM specifications, ISO standards, and OSHA regulations.
3.5 The Contractor shall coordinate with the technical point of contact (TPOC) identified below to complete this work.
4.0 DATA DELIVERABLES
4.1 The contractor shall provide data IAW CDRL A001.
5.0 GOVERNMENT FURNISHED EQUIPMENT/INFORMATION
5.1 The Government will provide running water, electric and restrooms and shower area if needed.
5.2 The Government will provide access to work site.
6.0 TRAVEL
The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR). The following travel is anticipated: Four (4) personnel to Dahlgren, VA for eighteen (18) days.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .