This document contains questions and answers regarding a solicitation for the procurement of hardware in support of the AN/SPQ-15(V) Data Distribution System programs. The solicitation seeks hardware including standard data distribution systems, switchboards, decoders, converters, and switches from radar sensors to displays. It also includes upgrades for existing AN/SPQ-14(V) Advanced Sensor Distribution System and Data Distribution System installations. Proposals are due by the date specified in the solicitation. The Naval Surface Warfare Center Dahlgren Division Dam Neck Activity is the issuing agency. The incumbent contractor is Frontier Electronic Systems Corp. The contract will be a single award IDIQ with firm-fixed-price, cost-plus-fixed-fee, and cost reimbursement ordering provisions.

View the file

Other files for this federal contract opportunity

Other files attached to AN/SPQ-15 Data Distribution System Production, newest first.
File Type Posted
Attachment J.2 GFI List Rev1.pdf PDF
N0017822R2501-0001.pdf PDF
22R2501_RFP_Q_A_10_5.pdf PDF
Attachment J.4 QASP.pdf PDF
Attachment J.2 GFI List.pdf PDF
N0017822R2501_Unclassified Terms of Use Agreement.pdf PDF
Exhibit A - DD Form 1423.pdf PDF
Attachment J.5 Labor Category Qualifications.pdf PDF
Attachment J.3 GFP List.xlsx XLSX spreadsheet
Attachment J.9 Question Submittal Form.xlsx XLSX spreadsheet
Attachment J.7 COR Appointment Letter (Placeholder).docx DOCX document
Attachment J.6 eCRAFT_SCA Crosswalk.xlsx XLSX spreadsheet
Attachment J.1 DD 254.pdf PDF
N0017822R2501.pdf PDF
Attachment J.8 Cost_Summary_Format.xls XLS spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Offeror Question Government Response

TDP

Offeror holds the TDP provided in April 2022. Please confirm this is the latest version available.

This is not the latest version please request a new copy in accordance with the instructions listed in the solicitation.

CLIN 1011, Section B pg. 14

PN 456669-1 Single Board Computer is listed as a required item, but the TDP provided in April 2022 does not include a drawing for this part. Please confirm this Single Board Computer is required and if so, please provide the associated drawing(s). PN 456669-1 is a required item. The associated drawing will be provided in the updated version of the TDP.

CLIN 1012, Section B pg. 14

PN 456565-1 AN/SPQ-15 Server Based Software Suite is listed as a required item, but the TDP provided in April 2022 does not include a drawing for this part. Please confirm this Single Board Computer is required and if so, please provide the associated drawing(s).

PN 456565-1 is a required item. The associated drawing will be provided in the updated version of the TDP.

Additionally the GFI listing will be updated in Amendment 1 to reflect providing RHEL 6.5 and part numbers 456563 and 456564 as GFI at time of award.

CLIN 1013, Section B pg. 14

PN 410001-1 Radar Signal Simulator is listed as a required item, but the TDP provided in April 2022 does not include a drawing for this part. Please confirm this Single Board Computer is required and if so, please provide the associated drawing(s). PN 410001-1 is a required item. The associated drawing will be provided in the updated version of the TDP.

Section B, Page 10 It appears that CLINs 1013 and 1014 have the same part number on page 10 (correct in the YR 1 to YR 5 pricing table).

Suggest change to CLIN 1013 part number to 410001-1. This has been corrected on the final Solicitation

Section B, Page 10 It appears that the quantity for 1013 might be too high (qty 66). In the past 15 years the Government has only purchased a total quantity of 11 for this item. Max Qty is 66. Within each Delivery Order we will order the quantities as needed.

Section L, Page 118

“Photographs…are not permitted.” This statement conflicts with direction in SECTION 3.1.2—“The TDP shall contain digital photographic images of assembly procedures and cable dressing techniques provided coincident with the development of configurations supported, interface control information for hardware and software changes.” We suggest that this requirement be removed as photographs are a very efficient method of demonstrating concrete evidence of contractor facilities, capabilities, and experience in proposals. We recommend changing the wording to “Photographs shall be limited to those which are necessary to clarify points being made in the proposal narrative.”

The direction provided in Section L is for proposal submission. The direction provided in Section C.3.1.2 is in regards to deliverables during contract performance. The pictures provided in the technical proposal just can not be provided in a photo format.

Section L, Page 118

"Minimum font size for both text and graphics shall be 10 point and font type shall be Times New Roman." Graphics come from many sources and it is neither practical nor cost efficient to redraw or re-format existing illustrations to meet these requirements. We suggest changing the wording to eliminate the font type for graphics.

On Amendment 1, Section L - 2.2(10) will be updated to read "Minimum font size for text, not within excel, shall be 10 point and font type shall be Times New Roman."

Section C, Page 24

Section 3.1.5 “In addition, the Government, other Hardware Production & Sustainment Contractor, and Design Agent Contractor may identify and submit issues to the Contractor.---Who are the “ other hardware Production & Sustainment Contractor and Design Agent Contractor, what are their specific roles and interface responsibilities with the winning contractor?

On Amendment 1 "In addition, the Government, other Hardware Production & Sustainment Contractor, and Design Agent Contractor may identify and submit issues to the Contractor." will be removed

Section C, Page 53

RFQ Section C-237-H002 SUBSTITUTION OF KEY PERSONNEL (NAVSEA) (OCT 2018) para (b): “ The Contracting Officer shall be notified in writing of any proposed substitution at least forty-five (45)days, or ninety (90) days if a security clearance is to be obtained, in advance of the proposed substitution. Such notification shall include: (1) an explanation of the circumstances necessitating the substitution; (2) a complete resume of the proposed substitute; (3) an explanation as to why the proposed substitute is considered to have equal or better qualifications than the person being replaced; (4) payroll record of the proposed replacement; and (5) any other information requested by the Contracting Officer to enable him/her to judge whether or not the Contractor is maintaining the same high quality of personnel that provided the partial basis for award” —RECOMMEND DELETION of items #3 and #4 as Item #(2) will provide the Government sufficient information to assess the qualifications and experience of the proposed replacement to successfully fulfil the requirements of the of professional that they will be replacing.

Items #3 and #4 are required as part of the justification that must be done for post award approvals through our chain of command.

Section L, Page 130

The requirements state "The Offeror shall provide up to three (3) past performance references on contracts that were awarded and performance began within the past five (5) years from the closing date of solicitation." We would like to suggest this be updated to "The Offeror shall provide up to three (3) past performance references on contracts that were awarded and performance began within the past six (6) years from the closing date of solicitation."

On Amendment 1 this section will be changed to, "The Offeror shall provide up to three (3) past performance references on contracts that were awarded and performed within the past five (5) years from the closing date of solicitation."

General Question

The Test Procedures that became available on 6/13/22 do not include those for CLIN 1009 (AM-7116A/UP Trigger Pulse Amplifier), CLIN 1013 (410001-1 Radar Signal Simulator), or CLIN 1014 (500214-1 Synchro Generator). Can these be provided? These will be provided with the updated version of the TDP.

Page 25, Section 3.17

P 25, section 3.1.7 Factory Acceptance Testing states “The Contractor shall provide all Test Data, evaluation tools (including simulations) and results to the Government for independent evaluation of performance (CDRL A00Z).” Per section 2.8 Data Deliverables, CDRL A00Z is “Software User Manual (SUM)”. On Amendment 1, Section C.1.7 will be updated to reflect CDRL A012.

General Question

In the prior revision of the SOW on p 664 Contract Data Requirements List/Statement of Work Crosswalk, CDRL A00Z was “Test/Inspection Report”. It appears that the CDRL number was not updated during the IDIQ SOW revision. Should the sentence on p25, section 3.1.7 read “The Contractor shall provide all Test Data, evaluation tools (including simulations) and results to the Government for independent evaluation of performance (CDRL A012).”?

On Amendment 1, Section C.1.7 will be updated to reflect CDRL A012.