Linux_Cluster_-_Statement_of_Work_(SOW).pdf
PDF 163 KB Posted
- Attached to
- GENERAL PURPOSE ADPE AND SUPPORT Federal contract opportunity
- Solicitation number
- N0017815T4481
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contract_Data_Requirements_List_(CDRL)_-_Acceptance_Test_Report_(ATR).pdf | ||
| Data_Item_Description_-_DI-QCIC-81891.pdf | ||
| Data_Item_Description_-_DI-IPSC-81756.pdf | ||
| Linux_Cluster_-_Evaluation_Criteria.pdf | ||
| Contract_Data_Requirements_List_(CDRL)_-_Software_Documentation.pdf | ||
| SF18_-_N00178-15-T-4481.pdf | ||
| Linux_Cluster_-_Technical_Requirements_List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINUX CLUSTER
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
The Naval Surface Warfare Center Dahlgren Division (NSWCDD) has a requirement for a High Performance Computing Cluster for performing physics-based computation. This system will be an add-on to an existing distributed memory Linux cluster, tailored to meet the requirements for highly parallel numerical computations of large problems with computational fluid dynamics, finite element and hydrocode software. System installation, configuration, and demonstration are part of this effort. This Statement of Work defines the system installation, configuration, training, and demonstration portions of the Linux
Cluster procurement.
2.0 APPLICABLE DOCUMENTS
2.1 Original Equipment Manufacturer (OEM) Specifications;
2.2 Linux Cluster – Technical Requirements List (attached)
3.0 REQUIREMENTS
3.1 System Installation, Integration, & Configuration: The
contractor shall install and integrate the new hardware with the existing machine, and perform any needed configuration updates including software licenses, on-site at NSWCDD (including all required software listed in “Linux Cluster - Technical
Requirements List” document (attached)).
3.2 System Demonstration: The contractor shall execute the HPC
Challenge Benchmark Tests on the system including a multi-hour
HPL execution using every compute core.
4.0 TRAVEL
The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the FAR 31.205-46, “Travel Costs”, and the Federal Travel
Regulations (FTR). The following travel is anticipated: Two
(2) personnel to Dahlgren, VA for five (5) days.
5.0 DATA DELIVERABLES
5.1 The contractor shall provide all hardware and software
operating documentation (CDRL A001);
5.2 The contractor shall provide benchmark test results (CDRL
A002).
6.0 TECHNICAL POINT(S) OF CONTACT
To Be Provided at Time of Award.