This is a Request for Quotation (RFQ) issued by the Naval Surface Warfare Center Indian Head Division for the fabrication, inspection, testing, and delivery of bulk propellant chemicals. The solicitation (N0017426Q1017) seeks quotations for four chemical line items with firm fixed pricing: 1,640 ounces of HTPB R45-HTLO per WS 20700 Type II; 420 ounces of Di(2-Ethylhexyl) Adipate (DOA) per MIL-DTL-23443C; 160 ounces of Desmodur W per Drawing 1335AS287; and 176 ounces of Yellow Iron Oxide per MIL-I-85370(AS). Additionally, contractors must provide shipping and deliver Safety Data Sheets and Certification Data Reports as Contract Data Requirements List items A001 and A002. All materials must be fabricated from a single homogeneous lot and batch, with lead times of six weeks for items 0001-0003 and four weeks for item 0004. The quotation deadline was February 23, 2026, with delivery to Naval Surface Warfare Center Indian Head Division, 4522 McMahon Road, Indian Head, Maryland 20640.

The contractor must provide DoD unique identification or recognized equivalents per DFARS 252.211-7003, maintain ISO 9001:2015 quality management systems, and comply with calibration requirements per ANSI/NCSL Z540.3 or ISO/IEC 17025. Government acceptance is determined by sample testing within 30 days of receipt of all documentation and deliverables. Packaging must comply with specific military standards (MIL-DTL-23443 for DOA, WS 20700 for R45-HTLO, MIL-I-85370(AS) for iron oxide, and Drawing 1335AS287 for Desmodur W), with oxidizers packaged in 410-lb or 450-lb drums and iron oxide in 44-lb bags, all labeled with contract number, specification number, and lot number. The RFQ is not a small business set-aside and incorporates extensive FAR and DFARS clauses addressing cybersecurity, hazardous materials, counterfeit prevention, and enhanced security controls on contractor information systems.

View the file

Other files

File Type Posted
SOW_BULK ingredient _SS_BD (003).pdf PDF
M21_FY26_SS_Bulk Propellant.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

Created On:

22 Jan 2026, 16:33 PM Greenwich Mean Time

Section A - Solicitation/Contract Form

M21_FY26_SS_Bulk Propellant

N0017426Q1017

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

HTPB R45-HTLO, AS PER WS 20700, TYPE II

The Contractor shall fabricate, inspect, test, and deliver 1640 lbs.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Part Number Description: HTPB R45-HTLO Pricing Arrangement: Firm Fixed Price

1,640 Ounce - Av

DOA (DIOCTYL ADIPATE), MIL-DTL-23443

The Contractor shall fabricate, inspect, test, and deliver 420 lbs.

of conditioned Di(2-Ethylhexyl) Adipate in accordance with MIL-

DTL-23443C.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Part Number Description: DIOCTYL ADIPATE Pricing Arrangement: Firm Fixed Price

420 Ounce - Av

DESMODUR W (MFG COVESTRO)

The Contractor shall fabricate, inspect, test, and deliver 160 lbs of conditioned Desmodur W in accordance with Dwg

1335AS287.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Part Number Description: DESMODUR Pricing Arrangement: Firm Fixed Price

160 Ounce - Av

IRON OXIDE, GRADE YELLOW Bayferrox 3910 The Contractor shall deliver 176 lbs. of Yellow Iron Oxide in accordance with MIL-I-85370(AS).

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Part Number Description: Bayferrox 3910 Pricing Arrangement: Firm Fixed Price

176 Ounce - Av

0005 SHIPPING

Pricing Arrangement: Firm Fixed Price

1 Each

CDRL A001

Safety Data Sheet (SDS) Report/DI-SAFT-82112

BLK 4: Contractor format acceptable.

BLK 9: DISTRIBUTION D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Administrative operational Use. To protect technical or operational data or information from automatic dissemination under the international exchange program or by other means. This protection covers publications required solely for official use or strictly for administrative or operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data. (01/12/2026).

Other request for this document shall be referred to Commanding Officer or Technical Director, NSWC Indian Head Division. SDS required before delivery of items shipped.

BLK 14&16: All data shall be submitted to the designated recipients in both electronic and physical formats. An electronic copy of the Safety Data Sheet (SDS), in either Microsoft Office or PDF format, must be sent via email within five days of the contract award. Additionally, a physical paper copy must be attached to the package at the time of delivery.

DISTRIBUTION ADDRESSEE -

Naval Surface Warfare Center Indian Head Division 4895 McMahon Rd.

Bldg. 863 Indian Head, Md 20640

POC: Abron Deer Email: abron.w.deer.civ@us.navy.mil Phone: (301) 744-4813

POC: Patricia Nalborczyk Email: patricia.r.nalborczyk.civ@us.navy.mil Phone: 301.861.9035

Pricing Arrangement: Firm Fixed Price

1 Lot

CDRL A002

Certification Data Report/DI-MISC-82386

BLK 4: Contractor Format Acceptable.

BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.

DoD contractors only (Administrative or Operational use. To protect technical or operational data or information from automatic dissemination under the international exchange program by other means. This protection covers publications required solely for office use or strictly for administrative or operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data) (10/7/2020). Other requests shall be referred to Commanding Officer or Technical Direction, NSWC Indian Head Division.

DESTRUCTION NOTICE: This document may be destroyed by any means that will prevent disclosure of contents or reconstruction of the document.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control

Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App 2401 et seq.).

BLK 12 & 13: Certificate of Analysis is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.

Requirements listed under the appropriate SOW sections 3.2.2 and 3.3.3.

BLOCK 14: Submit via FIPS 140-2 approved encrypted email or DoD SAFE file transfer in Microsoft Office or PDF format to the contracts officer (KO), technical point of contact (TPOC) and the e-mail recipient(s) listed below. For a DoD SAFE transfer, contact your contract POC or TPOC for a transfer request, with recipients below on copy.

Certification Data Report (Certificate of Analysis):

1335AS287 Rev E - Zones D6 - D 8 MIL-I-85370(AS) - Section 3.1 WS 20700 Type II - Section 3.2 MIL-DTL-23443C Section 3.3 Certificate of Compliance:

1335AS287 Rev E - Zones C6 - C8 MIL-I-85370(AS) - Sections 3.3, 4, & 5 WS 20700 Type II - Sections 3.4, 4, & 5 MIL-DTL-23443C - Sections 3.4, 4, & 5 See Block 16 1 2

15.TOTAL 1 2

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 2 of 3

CUI

CUI

16. REMARKS (Continuation) Naval Surface Warfare Center: Indian Head Division

ATTN: M21

4522 McMahon Road Indian Head, MD 20640 POC: Abron (Bill) Deer abron.w.deer.civ@us.navy.mil

Pricing Arrangement: Firm Fixed Price

1 Lot

Section C - Description/Specifications/Statement of Work

MANUFACTURING OF CHEMICALS USING

SPECIFICATIONS PERFORMANCE WORK STATEMENT

1.0 Scope of Work

The requirements in this document contain the information necessary to provide HTPB R45 HTLO, Iron Oxide (Monohydrate) Yellow, Di(2-and for use in energetic deliverables at Naval Surface Warfare Center Indian Head Division (NSWC IHD).Ethylhexyl) Adipate, Desmodur

2.0 Applicable Documents

2.1.1 General Specifications

Department of Defense Specifications/Technical Drawings

1335AS287 Rev E Dicyclohexylmethane 4,4' - Diisocyante

MIL-I-85370(AS) Iron Oxide, (Monohydrate) Yellow

WS 20700 Type II Polybutadiene, Liquid, Hydroxyl-Terminated

MIL-DTL-23443C Di(2-Ethylhexyl) Adipate, Technical

MIL-STD- Marking for Shipment and129 Storage

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:

ISO Quality Management 9001 Systems

ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories

Society of Automotive Engineers (SAE) Standards:

SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and Conforming Material

2.1.2 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General

The Contractor shall fabricate, inspect, test, and deliver 420 lbs. of conditioned Di(2-

Ethylhexyl) Adipate in accordance with MIL-DTL-23443C. The Contractor shall fabricate, inspect, test, and deliver 1640 lbs. of conditioned R45 HTLO in accordance with WS 20700 Type II. The Contractor shall deliver 176 lbs. of Yellow Iron Oxide in accordance with MIL-I-85370(AS). The Contractor shall fabricate, inspect, test, and deliver 160lbs of conditioned Desmodur W in accordance with Dwg 1335AS287.

Deliverables shall be packaged and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture, test, and inspect the deliverables, as well as provide data as detailed herein.

3.1.1 Deliverable Lot Homogeneity

Materials deliverables shall be made from one single homogeneous lot and batch. A single continuous production run or batch be used to must meet several deliverable line items.

3.1.2 Safety Data Sheet

The Contractor shall provide a SDS in accordance with DI-SAFT-82112 per CDRL (Contacts Data Requirements List) A001 for each deliverable lot.

3.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test deliverables as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

3.2.1 Product Certification

The Contractor shall submit a Certificate of Compliance (COC) in accordance with DI-MISC-82386 per CDRL A002 to accompany the shipment of each first article and production lot, as required by Table 1. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.

The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-82386 per CDRL A003 showing the first article or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of

The shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate.

Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:

"This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001."

Table 1.2: Certification Requirements

Order Test Requirement Certificate

Specification Location

MIL-DTL-23443 Chem & Phys Properties MIL-DTL-23443 Para 3.3 Analysis

Workmanship MIL-DTL-23443 Para 3.4 Compliance

WS 20700 Type II Chem & Phys Properties WS 20700 Para 3.2 Analysis

Workmanship WS 20700 Para 3.4 Compliance

MIL-I-85370(AS) Chem & Phys Properties MIL-I-85370(AS) Para 3.1 Analysis

Workmanship MIL-I-85370(AS) Para 3.3 Compliance

1335AS287 Chem & Phys Properties 1335AS287 Zone D8 Analysis

Workmanship 1335AS287 Zone D8 Compliance

3.3 Quality Control

3.3.1Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of Para. 4.5. ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract.

The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. P rocedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

3.3.2 Calibration of Measuring and Testing Equipment

Calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of either ANSI/NCSL Z540.3 or ISO/IEC 17025.

3.3.3 Acceptance of Product

Final acceptance of first article samples and production deliverables will be determined by Government sample testing and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 30 days of receipt of all documentation and deliverables relevant to the line item in question.

The Government shall prepare a 1-quart composite sample from deliverable containers. The sample shall meet the requirements of Table 2. The Government reserves the right to perform additional testing to verify acceptability, which may include testing at other facilities.

Table 2: Government Acceptance Test Requirements

Test Requirement

Specification Location

Order

Physical and Chemical Properties

MIL-DTL-23443

Para 3.3

WS 20700 Type II Para 3.2

MIL-I-85370(AS) Para 3.1

1335AS287 Rev E Para 3.3

Workmanship MIL-DTL-23443 Para 3.4

WS 20700 Type II Para 3.4

MIL-I-85370(AS) Para 3.4

1335AS287

Rev E

Para 3.3

3.3.4 Government-Identified Nonconformity Reporting Procedures

The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

3.4 Packing and Shipping

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with MIL-DTL-23443 Para 6.3, Para 6.3.1, and Para 6.4 to prevent any potential damage during transport. Specifically, oxidizer will be packaged in 410-lb drums and labeled with at minimum the contract number, mil spec number, and lot number.

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with WS 20700 Para 5.1, Para 5.2, and Para 5.3 to prevent any potential damage during transport. Specifically, oxidizer will be packaged in 410-lb drums and labeled with at minimum the contract number, mil spec number, and lot number.

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with MIL-I-83570(AS) Para 5.1 to prevent any potential damage during transport. Specifically, yellow iron oxide will be packaged in 44-lb bags and labeled with at minimum the contract number, mil spec number, and lot number.

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with Drawing 1335AS287 Zone C8 to prevent any potential damage during transport. Specifically, oxidizer will be packaged in a 450-lb drum and labeled with at minimum the contract number, and lot number.

3.5 Counterfeit Material

The Contractor shall maintain a counterfeit material prevention program in accordance with SAE AS6174A, or comparable. The Contractor shall notify the Contracting Officer (KO) if material cannot be obtained from an authorized supplier.

4.0 Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor's representative authorized to make such certification.

Table 3: Contacts Data Requirements List

CDRL Spec Section Title

A001 DI-SAFT-82112 3.1.2 Safety Data Sheet (SDS) Report

A002 DI-MISC-82386 3.2.2 Certification Data Report (COA/COC)

4.1 Deliveries

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination. Lead times listed below represent the maximum allowable delivery timeframe; early deliveries are permitted.

Table 3: Deliverable Requirements

Item Year Chemical Qty UOI Lead Items

0001 Base Di(2-Ethylhexyl) Adipate 420 LBS 6 wks ARO

0002 Base R45 HTLO 1640 LBS 6 wks ARO

0003 Base Yellow Iron Oxide 176 LBS 6 wks ARO

0004 Base Desmodur W 160 LBS 4 wks ARO

Technical Point of Contact (POC): Abron Deer abron.w.deer.civ@us.navy.mil

(301) 744-4813

Requirements M21_FY26_SS_Bulk Propellant for Organization M21 FY: 2026, AMS: N00174-26-SIMACQ-M21-0001

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT

DEFENSE INDUSTRIAL BASE PARTNER NETWORKS

(Sep 2024)

1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews

a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor's facility.

The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government's review of the SSPs at the Contractor's facility.

b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government.

The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may

N0017426Q1017 mailto:abron.w.deer.civ@us.navy.mil require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a POAM.

c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor's facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).

d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor's site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days' notice to the Contractor.

2. Compliance to NIST 800-171

a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 2) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b) (2), for all covered contractor information systems affecting this contract.

b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:

(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;

(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;

(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.

(4) Audit user privileges on at least an annual basis;

(5) Implement:

i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.

e. FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM);

and,

ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);

(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.

(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.

3. Cyber Incident Response

a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.

b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs /Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.

c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification. The contracting officer will approve or disapprove the request after coordination with DC3.

4. Naval Criminal Investigative Service (NCIS) Outreach

The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.

5. NCIS/Industry Monitoring

a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.

b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.

c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.

(End of Text)

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-9 Inspection of Research and Development (Short Form). Apr 1984

Additional Regulation or Supplemental Clauses Incorporated by Full Text

E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018) (Oct 2018)

(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).

(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Beneath the signature include the typed name of the individual signing this certificate.

(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.

(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.

(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(g) The certificate shall read as follows:

I certify that on ___________ [insert date], the ______________________________ [insert Contractor's name] furnished the supplies called for by the Order/Contract No.___________________ via _________ [Carrier] on __________________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.

Date of Execution: ________________________________

Signature: _______________________________________

Typed Name: ____________________________________

Title: ___________________________________________

(End of Text)

Section F - Deliveries or Performance The Contractor/OEM shall coordinate with the Government Point of Contact(s) prior to delivery and include Lead-Times of each product.

Delivery to Indian Head, MD 20640

Overall Contract Delivery Period

Contractor Destination

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

1,640 Ounce - Av FoB Details

Contractor Destination

420 Ounce - Av FoB Details

Contractor Destination

160 Ounce - Av FoB Details

Contractor Destination

176 Ounce - Av FoB Details

Contractor Destination

1 Lot FoB Details

Contractor Destination

1 Lot FoB Details

Contractor Destination

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.211-17 Delivery of Excess Quantities. Sep 1989 52.242-17 Government Delay of Work. Apr 1984

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

INVOICE AND RECEIVING REPORTS (COMBO) DESINTATION/DESTINATION

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

INVOICE AND RECEIVING REPORTS (COMBO) DESINTATION/DESTINATION

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N62838

Issue By DoDAAC N00174

Admin DoDAAC N00174

Inspect By DoDAAC N00174

Ship To Code N00174

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN

2019)

(Jan 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

(End of Text)

G-242-H001 GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2023)

(Oct 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(ii) The Contract Specialist is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(iii) The Administrative Contracting Officer (ACO)is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

The Contracting Officer's Representative (COR) is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(e) The Alternate Contracting Officer's Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.

The Alternate Contracting Officer's Representative (ACOR) is:

Name: [ * ] Address:

[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Name: [ * ] Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.

The Alternate Technical Point of Contact (ATPOC) is:

Name: [ * ] Address:

[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(h) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the contract.

(i) The Authorized Ordering Person(s) for Per-Call Maintenance is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx];

E-mail: [ * ]

(j) The Contractor's point of contact for performance under this contract is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

[ * ] To be completed at contract award

(End of Text)

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.

S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

[ ] [ ]insert specific Departments insert times

(g) All deliveries to the Receiving Officer, [ Negotiator insert delivery location],shall be made Monday through Friday from [ ] to [ ], local time. Deliveries will not be accepted after Negotiator enter beginning hour of operation Negotiator enter closing hour of operation

[ ]. No deliveries will be accepted on federal government holidays.Negotiator enter closing hour of operation

(End of Text)

N0017426Q1017 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays

Section H - Special Contract Requirements

Voluntary Protection Program (VPP)

1. Voluntary Protection Program:

1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence.

VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight. This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual" regardless of the type or duration of the contract. Chapter 13 of the

IHDIVNAVSURFWARCENINST

5100.22, "Safety Manual", entitled "Contractor Safety" is provided as Attachment 8. Appendix 13-A, of the chapter 13 entitled "Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD" shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer.

1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled "Contractor Safety," all Contractors performing on-site at NSF Indian Head shall comply with the following:

1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment. All employers, including Contractors, shall conform to the standards as issued by OSHA. Contractors are responsible for complying with safety requirements specified in the contract as well as all Federal, State, and local safety and security regulations. Non-compliance may be cause for the removal of a Contractor or any Contractor employee from the activity and such non-compliance may form the basis for contractual action, up to and including termination for default.

1.2.2 Contractor personnel shall participate in basic safety awareness and hazard identification training offered by the Government activity at the work area they are supporting. Contractors performing on-site shall attend area weekly safety meetings and annual safety stand-downs, as determined by the

COR.

1.3 The best Safety and Health Programs involve every level of the organization, instilling a safety culture that reduces accidents for workers and improves the bottom line for managers. When Safety and Health are part of the organization and a way of life, everyone wins. IHD NSWC is committed to safety excellence. The Contractor shall familiarize itself with the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual," Appendix 13-C entitled "OSHA Voluntary Protection program (VPP) Fundamentals Training for Contractors".

2. Contractor On Site Training:

2.1 A Contractor providing support on-site at any IHD NSWC site may be required to have its on-site Contractor personnel participate in training covering rules, practices, procedures, equipment and systems, as needed, based on the type of support being provided. This training may include, but is not limited to: Operation Security training

(OPSEC); Personally Identifiable Information training; DoD Information Assurance Awareness training; Information Technology Security; Voluntary Protection…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .